Pyramid Project Number and Number Processes MNU 4-03a Money MNU 4-09c Time MNU 4-10a Measurement MNU 4-11a Data and Analysis 4-20a.

Similar presentations


Presentation on theme: "Pyramid Project Number and Number Processes MNU 4-03a Money MNU 4-09c Time MNU 4-10a Measurement MNU 4-11a Data and Analysis 4-20a."— Presentation transcript:

1 Pyramid Project Number and Number Processes MNU 4-03a Money MNU 4-09c Time MNU 4-10a Measurement MNU 4-11a Data and Analysis 4-20a

2 About the company Responsible for the construction of many famous buildings around the world Responsible for the construction of many famous buildings around the world Trustworthy and reliable Trustworthy and reliable Always meet targets Always meet targets

3 About the company The Great Pyramid Construction Company built: The Pyramids of Giza The Pyramids of Giza The Great Wall of China The Great Wall of China The Hanging Gardens of Babylon The Hanging Gardens of Babylon The Great Pyramid of Cholula The Great Pyramid of Cholula Colossus of Rhodes Colossus of Rhodes The London Eye The London Eye The Grand Canyon The Grand Canyon The Death Star The Death Star

4 Pyramid Requirements Needs clean, fresh water supply so visitors can cleanse themselves. Needs clean, fresh water supply so visitors can cleanse themselves. Must be on solid ground and unlikely to flood. Must be on solid ground and unlikely to flood. Must be difficult to attack. Must be difficult to attack. Must be visible to all those around. Must be visible to all those around. Must be at least 50 metres wide and 25 metres tall. Must be at least 50 metres wide and 25 metres tall. Should be built in less than two months. Should be built in less than two months.

5 Our Design: Hoolakmul Our Village Mulhun MulcaaMulox MulcanMulhooFlood gates Happy Leader

6 Our Design: Hoolakmul

7 Pyramid Construction

8

9

10 Expenses For pyramid n metres wide at base: number of blocks = n 2 + (n-1) 2 For pyramid n metres wide at base: number of blocks = n 2 + (n-1) 2

11 Expenses Height (m)Number of blocks Pyramid 1:504901 Pyramid 2:251201 Pyramid 3:251201 Pyramid 4:251201 Pyramid 5:251201 Total: 9705

12 Expenses 25 labourers can move 4 blocks of stone per hour 25 labourers can move 4 blocks of stone per hour 5 labourers can dig 4 metres of waterway per hour 5 labourers can dig 4 metres of waterway per hour Time to complete with 250 labourers: 20.6 days Time to complete with 250 labourers: 20.6 days Total labour days: (20.6 x 250) Total labour days: (20.6 x 250) 5158.9 days

13 Expenses ItemCost EachQuantityTotal Block1.5970514557.5 Labourers/day105158.951588.5 Statue100055000 Bridge100055000 Gift5001 Fiesta20001 Metre of water10100010000 Flood gate5210 Total:88656.0 Budget:100000.0 Remaining:11344.0

14 Evaluation Good water supply surrounds pyramid Good water supply surrounds pyramid On solid ground On solid ground Flood gates prevent flooding Flood gates prevent flooding Easy to defend – surrounded by water. Only entry is via four narrow bridges Easy to defend – surrounded by water. Only entry is via four narrow bridges 50 metres tall – easily visible for miles around 50 metres tall – easily visible for miles around Can be built in 21 days with 250 labourers Can be built in 21 days with 250 labourers We will have 11344 shells of our budget left over We will have 11344 shells of our budget left over

15 Thank you for listening