New Government – New Policy - New Development? A status report on Germany by Peter Ahmels President of the German Wind Energy Association (BWE) EWEC Athens,

Similar presentations


Presentation on theme: "New Government – New Policy - New Development? A status report on Germany by Peter Ahmels President of the German Wind Energy Association (BWE) EWEC Athens,"— Presentation transcript:

1 New Government – New Policy - New Development? A status report on Germany by Peter Ahmels President of the German Wind Energy Association (BWE) EWEC Athens, March 2006

2 Wind energy in Germany: installed capacity As of: 1/2006 Total: 18,428 MW Newly installed in 2005: 1,808 MW As of: 1/2006 Total: 18,428 MW Newly installed in 2005: 1,808 MW

3 Wind energy in Europe: installed capacity

4 Renewable Energy Sources Act (EEG): Targets

5 High acceptance of increasing utilisation of windpower % Latest surveys:

6 Source: BEE, 8/2004 Fixed retail price 19.2 ct/kWh Components of electricity price in ct/kWh 1,1 0,52 2,65 3,3 6,2 1,1 0,28 1,99 2,05 Wholesale price Grid access Measuring costs Sales Contribution RES Concession levy CHP Electricity tax VAT Average price of 1 kWh for an average German household

7 Standard Tariff Ct/kWh Standardized tariff onshore Study: Analysis of Effectiveness of Instruments in the Electricity Sector Fraunhofer / ISI Karlsruhe 2005

8 ES DE SEFR IT UK AT IE Factor of Effectivness % Price per kWh (ct) BE Study: Analysis of Effectiveness of Instruments in the Electricity Sector Fraunhofer / ISI Karlsruhe 2005 Quota Fixed price Tender- system Efficiency of systems in Europe

9 Cost of electricity...

10 $/458g Price of uranium

11 Price of gas ct

12 Price of oil $/Bbl

13 Electricity price at stock exchange Leipzig > + 100% in 3 years €/MWh

14 Feed-in tariffs for wind energy: 68% degression between 1991 and 2010

15 The perspective: cheap electricity due to wind energy

16 Costs of avoidance of CO 2 €/t

17 Consequence of non-action: growing dependence on imports

18 “Bottleneck” grid no optimization (temperature monitoring) planning period > 10 years Height limits for turbines general distance recommendations for turbines next to settlement Obstacles

19 Development of Wind Energy in Germany until 2020 Megawatt year + 11 TMW +12 +10

20 Thank you for your attention! www.wind-energie.de