Presentation is loading. Please wait.

Presentation is loading. Please wait.

Department of Measurement and Inspection Environmental Reference Laboratory Water and Wastewater Mobile Laboratory Sevil ÖKSÜZ Deputy Expert.

Similar presentations


Presentation on theme: "Department of Measurement and Inspection Environmental Reference Laboratory Water and Wastewater Mobile Laboratory Sevil ÖKSÜZ Deputy Expert."— Presentation transcript:

1 Department of Measurement and Inspection Environmental Reference Laboratory Water and Wastewater Mobile Laboratory Sevil ÖKSÜZ Deputy Expert

2 ERL would perform water, waste water, soil, sediment, waste, waste oil and fuel analyses in the content of environmental laws. ERL would perform water, waste water, soil, sediment, waste, waste oil and fuel analyses in the content of environmental laws. ▪ ERL performs River Basin Monitoring studies and inspection of facilities with 3 Mobile Water/Waste water Laboratories which were ▪ ERL performs River Basin Monitoring studies and inspection of facilities with 3 Mobile Water/Waste water Laboratories which were obtained from EU funds in 1993. These monitoring studies planned as yearly programs These monitoring studies planned as yearly programs MOBILE LABORATORY under the ENV I RONMENTAL REFERENCE LABORATORY

3  Marine water,  Lakes,  River,  Wastewater Treatment Plants,  Inspections,  Some monitoring studies.  Marine water,  Lakes,  River,  Wastewater Treatment Plants,  Inspections,  Some monitoring studies. Work ing Area s MOB I LE LABORATORY

4

5  The ML carries out Inspections to river basins and to some provinces with cooperation of the other departments of General D i rectorate of Envıronment Management.  Samples from these inspection are analyzed in the ML, the parameters which can not be anlyzed are taken to Environmental Referance Lab oratory i n appropriate storage conditions and analyzed there.  The ML carries out Inspections to river basins and to some provinces with cooperation of the other departments of General D i rectorate of Envıronment Management.  Samples from these inspection are analyzed in the ML, the parameters which can not be anlyzed are taken to Environmental Referance Lab oratory i n appropriate storage conditions and analyzed there. İzaydaş Inspection and Analyses A bout By-Law on Water Pollution Control (No.20748, 1991)

6 MOB I LE LABORATORY

7 River basins and provinces inspected in 2009 -GEDİZ BASIN -AKARÇAY BASIN -KIZILIRMAK BASIN -BÜYÜK MENDERES BASIN -ERGENE BASIN -FIRAT – DİCLE BASIN -SAKARYA BASIN -YEŞİLIRMAK BASIN -VAN BASIN -DENİZLİ -ELAZIĞ AND MALATYA River basins and provinces inspected in 2009 -GEDİZ BASIN -AKARÇAY BASIN -KIZILIRMAK BASIN -BÜYÜK MENDERES BASIN -ERGENE BASIN -FIRAT – DİCLE BASIN -SAKARYA BASIN -YEŞİLIRMAK BASIN -VAN BASIN -DENİZLİ -ELAZIĞ AND MALATYA ACT I V I T I ES IN 2009 Inspection and Analyses A bout By-Law on Water Pollution Control (No.20748, 1991)

8 - Inspections 110 samples - Surface water 34 samples - Monitoring activies 121 samples T otal : 265 samples - Inspections 110 samples - Surface water 34 samples - Monitoring activies 121 samples T otal : 265 samples ACTIVITIES IN 2009

9 Water quality monitoring studies in the Köprü Stream in the Köprülü Kanyon National Park. (2007-2012) ACTIVITIES IN 2009

10

11 - Keban reservoir - Fırat River-to determine the pollution arised from salmon farms - Karakaya reservoir - Keban reservoir - Fırat River-to determine the pollution arised from salmon farms - Karakaya reservoir ACTIVITIES IN 2009

12

13 -In Büyük Menderes River basin monitoring study in 13 points were carried out. -Data obtained from this activities were used in the “Capacity Building Support to the Water Sector in Turkey ” project. -In Büyük Menderes River basin monitoring study in 13 points were carried out. -Data obtained from this activities were used in the “Capacity Building Support to the Water Sector in Turkey ” project. ACTIVITIES IN 2009

14 The purpose of the project was to assist Turkey in the water management in accordance with the EU water legislation, in particular the WFD (2000/60/EC), Urban Wastewater Treatment Directive (UWWTD 91/271/EEC) and Dangerous Substances Directive (DSD 76/464/EEC) and daughter directives in order to reinforce Turkey’s accession to EU and thus provide support to the water sector. This project had been executed from December 2007 till March 2010. ACTIVITIES IN 2009

15

16 The aim of the project is to implement good agriculture practices in order to decrease the entrance of the pollutants to the surface and groundwater to Kızılımak and Yeşilırmak river basins. In these river basins ML monitored nitrogen and phosphorus and other pollutants. The aim of the project is to implement good agriculture practices in order to decrease the entrance of the pollutants to the surface and groundwater to Kızılımak and Yeşilırmak river basins. In these river basins ML monitored nitrogen and phosphorus and other pollutants. ACTIVITIES IN 2009

17  The objective of the project is to introduce sustainable natural resource management practices in 28 river basins in Anatolia and Turkey’s Black Sea region and thereby raise incomes of communities affected by resource degradation.  encourage local communities to take responsibility for planning and implementing an integrated approach to sustainable resource management in selected river basins;  introduce communities to more environmental friendly farming and forestry production practices that raise land productivity, release pressure on marginal land and improve household income;  help reduce nutrient discharge from agricultural sources into the Black Sea; Anatolia Watershed Rehabilitation Project ACTIVITIES IN 2009

18  strengthen the policy formulation and regulatory capacity towards meeting European Union (EU) standards for agricultural nutrient pollution control;  improve the overall framework for river basin planning and management in the context of EU directives on water;  strengthen institutional capacity to promote sustainable natural resource management and raise public awareness on resource degradation issues. Anatolia Watershed Rehabilitation Project

19 Temperature C pH Dissolved Oxygen mg/L Conductivity µS/cm PO4-P mg/L Total Phosphorous mg/L Total Nitrogen mg/L NH4-N mg/L NO2-N mg/L NO3-N mg/L Turbidity NTU Total Suspended Solids mg/L Total Dissolved Solids mg/L Total Coliform EMS/100 ml Fecal Coliform EMS/100 ml ACTIVITIES IN 2009

20

21 Training of sampling - Provincial Directorates of MoEF; - Provincial Directorates of MoEF ; - Authorized laboratories; (public and private)( 292 people) Training of sampling - Provincial Directorates of MoEF; - Provincial Directorates of MoEF ; - Authorized laboratories; (public and private)( 292 people) ML gives this sampling training to take consider in to the Communiqué on Methods of Sampling and Analysis stated in the By-Law on Water Pollution Control (No.27372, 2009) and people who take s this training are certified. ACTIVITIES IN 2009

22 In 2010 In 2010 inspection,inspection, monitoring studies andmonitoring studies and sampling activitiessampling activities will be increased by increasing the capacity of ML (personnel, vehicle) will be increased by increasing the capacity of ML (personnel, vehicle) Water monitoring in Burdur and Salda lakesWater monitoring in Burdur and Salda lakes Training of samplingTraining of sampling In 2010 In 2010 inspection,inspection, monitoring studies andmonitoring studies and sampling activitiessampling activities will be increased by increasing the capacity of ML (personnel, vehicle) will be increased by increasing the capacity of ML (personnel, vehicle) Water monitoring in Burdur and Salda lakesWater monitoring in Burdur and Salda lakes Training of samplingTraining of sampling FUTURE PLANN I NG ACTIVITIES

23 - In marine water, to determine the pollution arised from deep marine discharge and salmon farms both of the departments will carry out a study in May and October 2010. FUTURE PLANN I NG ACTIVITIES

24 Sampling boat of ML and Turkish Coast Guard Command boats will be used in this study. FUTURE PLANN I NG ACTIVITIES

25 - Ergene Basin (March 2010), - Seyhan – Ceyhan Basin (March 2010), - Susurluk Basin (Nowadays) - Ergene Basin (March 2010), - Seyhan – Ceyhan Basin (March 2010), - Susurluk Basin (Nowadays) FUTURE PLANN I NG ACTIVITIES

26 -The monitoring strategy of the Laboratory will be updated in the scope of WFD and Capacity Building on Water Quality Monitoring Project. The monitoring programme in determined points in Büyük Menderes Pilot Basin has begun in 2010. FUTURE PLANN I NG ACTIVITIES

27

28 Mobile Water/Wastewater Laboratory has also been making analyses and monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation Project” for every three months since 2004. The data obtained from these studies has been sent to General Directorate for Environmental Management Department of Marine and Coastal Management in order to be evaluated and reported.Mobile Water/Wastewater Laboratory has also been making analyses and monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation Project” for every three months since 2004. The data obtained from these studies has been sent to General Directorate for Environmental Management Department of Marine and Coastal Management in order to be evaluated and reported. The project has been commenced on June 01, 2004 and will be finalized on June 30st, 2012The project has been commenced on June 01, 2004 and will be finalized on June 30st, 2012. Mobile Water/Wastewater Laboratory has also been making analyses and monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation Project” for every three months since 2004. The data obtained from these studies has been sent to General Directorate for Environmental Management Department of Marine and Coastal Management in order to be evaluated and reported.Mobile Water/Wastewater Laboratory has also been making analyses and monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation Project” for every three months since 2004. The data obtained from these studies has been sent to General Directorate for Environmental Management Department of Marine and Coastal Management in order to be evaluated and reported. The project has been commenced on June 01, 2004 and will be finalized on June 30st, 2012The project has been commenced on June 01, 2004 and will be finalized on June 30st, 2012. FUTURE PLANN I NG ACTIVITIES

29 The overall objective of the project is to achieve a good environmental status for surface waters. Strengthening Turkey’s capacity to implement the EU Water Framework Directive Project began it’s activities on January 2010, and project will be finalized at the first quarter of 2013.

30 This Project;  will enhance the harmonization of environmental Acquis Communautaire, especially for WFD with regarding to surface waters,  will be a good instrument for the preparation of plans and programmes for the National Policy,  will make the supervision system more effective,  will constitute a good model for Turkey’s other basins and also neighboring countries in terms of the objectives of integrated and holistic approach;  will enable better environmental protection and management. FUTURE PLANN I NG ACTIVITIES Capacity Building on Water Quality Monitoring Project

31 Assumed Results of Project:  The legal and institutional gap analysis is executed between Turkey and EU in terms of WFD requirements.  Capacity building of related institutions is provided on water quality monitoring, analysis and assessment of surface water bodies in line with WFD  Pilot implementation is executed related to monitoring of surface water bodies for selected basins. FUTURE PLANN I NG ACTIVITIES Capacity Building on Water Quality Monitoring Project

32

33

34 The regions which are MOBILE LABORATORY studied during the 2007-2008

35 THANKS FOR YOUR ATTENTION. THANKS FOR YOUR ATTENTION.


Download ppt "Department of Measurement and Inspection Environmental Reference Laboratory Water and Wastewater Mobile Laboratory Sevil ÖKSÜZ Deputy Expert."

Similar presentations


Ads by Google