Download presentation
Presentation is loading. Please wait.
Published byAntony Joseph Modified over 9 years ago
1
PROPOSED PROJECTS SUBMITTED TO DEVELOPMENT PARTNERS FORUM March 2014 KIER Workshop 25/02/2015
2
OUTER ISLAND AND RURAL ELECTRIFICATION ActProject TitleEst AUD 1Solar pv mini grid system for Southern Kiribati Hospital 2.4 million 2Outer Island Clinic solar system rehabilitation230,000.00 3Mereang Taabwai Secondary Schools solar pv mini- grid system 500,000.00 4Junior Secondary School (JSS)system.285,000.00 5Solar Home System (3900) for Households.1.5million 6Outer Island Council solar PV mini grid system710,000.00 7Outer Island Fish Centres610,000.00 8Desalination Plant for vulnerable rural community.115,000.00 9Outer Island Police Station solar system rehabilitation60,000.00 10Solar PV system for non-government vocational institutions: CCL Manoku and Alfred Sadd Institution 500,000.00 Total6,910,000
3
URBAN ENERGY AND ELECTRIFICATION ActProject TitleEst AUD 1Upgrading PUB grid including automation, duel fuel genset and storage technology i) Install a reliable communication system coupled with suitable software package that would be able to display instantaneous data which will allow for control and monitoring of the generation between the two power houses – Betio & Bikenibeu. Existing transformers must be replaced as well to increase grid reliability and genset dispatch. 1.93million ii) Procuring and installing of duel fuel genset to cater for the increasing demand and to allow for biofuel to be used as an alternative fuel. Biofuel production and test facility will be part of this activity 1.5 million iii) Procure and install storage technology that will stabilize the grid as the level of renewable installation increases. 1.1 million 2Renewable Energy for power generation and grid upgrading in Kiritimati Island NZD 10 m (app 9m)
4
ActProject TitleEst AUD 1Additional tank – 2000m32 million Total15.53m URBAN ENERGY AND ELECTRIFICATION
5
POLICY PLANNING AND COORDINATION ActProject TitleEst AUD 1Review existing supply contract and identify options for alternative fuel supplier where possible. 25,000 2Electricity tariff review to support the private sector and low income households. 45,000 3National Energy Roadmap development.30,000 4Policy and legislation for Renewable Energy and Energy Efficiency, Electricity and Petroleum fuels. 150,000 Total250,000
6
TOTAL EST COST SectorEst AUD 1OUTER ISLAND AND RURAL ELECTRIFICATION6,910,000 2URBAN ENERGY AND ELECTRIFICATION Electricity Kiritimati Is Petroleum 4,530,000 10m NZD (appox 9mAUD) 2,000,000 3POLICY PLANNING AND COORDINATION250,000 TOTAL22,690,000
7
ISSUES TO CONSIDER Need to rank projects in order of Priority? What Timeline are proposed for each project?
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.