Download presentation
Presentation is loading. Please wait.
Published bySamuel Weaver Modified over 9 years ago
1
USUSat III - TOROID TOmographic Remote Observer of Ionospheric Disturbances Preliminary Design Review Preparation
2
Preliminary Design Review August 11-12, 2005 –New Engineering Building –AFRL wants attendance to all presentations Prep for PDR –Small Satellite Conference Display –PDR Slide Presentation –Satellite Demonstration –Documentation Budgets Requirements We are trying to sell the mission and sell the satellite RISK Y
3
PDR Slides 15-20 Slides per subsystem Due 5:00 pm, July 15, 2005 to Jared’s inbox Update slides and documentation from FCR. Slide organization: –This is what we want to do Your subsystem requirements. Remember that good requirements are specific and have a reason why. Refer to SCR System requirements for flow down.
4
PDR Slides Slide organization (con’t) –This is what we are going to do – This defines the design. For example, Comm req 30.1 states: The communication system shall provide a link for transmitting commands from the USU Ground Station to the spacecraft. This is accomplished through the TNC and TEKK design. –This is what we have done. Give a status report, what aspects of the subsystem are complete –This is the proof that our design meets our requirements We need to show that our design meets the requirements already laid out. This is where test results and so forth can be used –This is what is left Outline what remains to be completed
5
Documentation We have not received specific information from AFRL. Expect the following: –Budgets, ie Link Budget, Computing Budgets, Mass Budget, Thermal, Power, etc. Due July 22. –Each subsystem needs to create a Subsystem Requirements document. This will be due July 22
6
Example Budget
7
Small Satellite Conference Display We are in the corner in the same room as last year. The display will include –5’ table –Transportation frame –Computer w/ Flat Screen monitor –Satellite –Documentation The computer will run –All animations –Tornado –LabVIEW –The Website USU’s Booth
8
Satellite Demonstration During PDR, we will be in the New Engineering Building, room 101 or 103. Any Ideas or suggestions?
9
Schedule
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.