Presentation is loading. Please wait.

Presentation is loading. Please wait.

Maximilian Frey 11.4. 2002 0 P1016 MINIT Mobile IP-Network Integration Testing.

Similar presentations


Presentation on theme: "Maximilian Frey 11.4. 2002 0 P1016 MINIT Mobile IP-Network Integration Testing."— Presentation transcript:

1 Maximilian Frey 11.4. 2002 0 P1016 MINIT Mobile IP-Network Integration Testing

2 Maximilian Frey 11.4. 2002 1 CONTENT History of testing at Eurescom Scope of the Project Participants Concepts for Testing UMTS Test Architectures PCOs State of the Project ETSI Workitems Conclusion

3 Maximilian Frey 11.4. 2002 2 History of testing at EURESCOM P104: ISDN End-to-End Testing P412: Methodology and Tools for ISDN Network Integration and Traffic Route Testing P613: Methods and tools for B-ISDN and N-ISDN Network Integration Testing ATS for end-to-end interworking tests between GSM, ISDN, PSTN P919: Evolution of integrated fixed and mobile networks ATS for end-to-end tests for GSM and GPRS P1016: Mobile IP Network Integration Testing ATS for end-to-end tests between UMTS, GPRS, GSM, ISDN, PSTN

4 Maximilian Frey 11.4. 2002 3 Scope of the Project End-to-End: – UMTS-CS and GSM, ISDN, PSTN including use channel tests – UMTS-PS and IP IP-Network-Integration Tests: –Application Tests between UMTS-PS and Application-Servers –Performance Tests between UMTS-PS and IP-Network: Generation and Comparison of IP-Packets (different Phases: duration, number of IP-packets) Core-Network-Interfaces: –ISUP, INAP CS-1/CS-2, CAP Ph.1-Ph.3

5 Maximilian Frey 11.4. 2002 4 Participating Companies CSELT, Italy (left 1/2001) OTE, Greece SWISSCOM, Switzerland Telecom Austria, Austria VIAG Interkom (O2), Germany

6 Maximilian Frey 11.4. 2002 5 Concepts for Testing UMTS Network Integration Testing –End-to-end tests: tests at layer 3: Call Control, Session Management, IP –Customer view: application tests, use channel tests –Service tests: IP, application tests Core Network Testing –ISUP/INAP/CAP tests –Service tests Testing –Use of TTCN-2: Converting to TTCN-3 planned –Use of PCOs for active testing at the user interfaces –Use of POs for passive testing at the core-network interfaces –Using different test architectures in the same test case

7 Maximilian Frey 11.4. 2002 6 Test Architectures

8 Maximilian Frey 11.4. 2002 7 UTRAN ISDN, UTRAN PSTN, GSM ISDN, GSM PSTN Node B (BTS) MSC SCP RNC (BSC) ATM (SS7) PTC MTC Gateway PTC

9 Maximilian Frey 11.4. 2002 8 UTRAN UTRAN, UTRAN GSM, GSM GSM SCP ATM (SS7) PTC MTC PTC Node B (BTS) MSC RNC (BSC) PTC Node B (BTS) MSC RNC (BSC) PTC

10 Maximilian Frey 11.4. 2002 9 UTRAN/GPRS IP, GSM/GPRS IP Node B (BTS) SGSN Application -Server RNC (BSC) INTERNET GGSN MTC PTC

11 Maximilian Frey 11.4. 2002 10 GSM PCO (including HSCSD and GPRS) Physical Um Fax HSCS Data CS Data Speech SMS U-Plane Check LAPDm CC MM/RR SS PCO MAC PDCP SMS RR GM M IPChe ck IP IP-AppSM PCO RLC Physical PCM Fax HSCS Data CS Data Speech SMSU-Plane CheckCC MM/BSSMAP SS PCO MTP SCCP FR PDCP SMS RR GM M IPChe ck IP IP-AppSM PCO BSSGP Physical PCM LLC

12 Maximilian Frey 11.4. 2002 11 UMTS PCO Physical SDH/PDH + ATM AAL5 Fax HSCS Data CS Data Speech UDP/IP SMS U-Plane Check RRCGM M AAL2 SSCOP/SSCF-NN MTP3-B/SCCP RANAP CC MM SS IPChe ck GTP IP IP-App SM PCO Physical Um (UTRAN) MAC Fax HSCS Data CS Data Speech PDCP SMS U-Plane Check RRC GM M CC MM SSIPChe ck IP IP-AppSM PCO RLC

13 Maximilian Frey 11.4. 2002 12 INAP/CAP PCO Use as PO and PCO at the same time –the standard PCO with TCAP-Primitives can not be used –a PCO on top of MTP-3 is used Not the complete SCCP and TCAP message is specified in the ATS -SCCP: cdpa and cgpa as well as the protocol class -TCAP:Message Type, Component Portion, Dialogue Portion, Dialogue Id

14 Maximilian Frey 11.4. 2002 13 State of the Project TC for CS- and PS-services implemented Only API for application scripting on top of IP ATS completed for CS and PS services including SS, SMS and different application profiles Use channel tests and core network tests are completed Dynamic validation not possible, because of lack of a testsystem Project will be finished in may

15 Maximilian Frey 11.4. 2002 14 ETSI-Workitems WI: DTS/SPAN-130298: Network Integration Testing between GSM Phase 2+, ISDN and PSTN; Part1 TSS&TP/ Part2: ATS and PIXIT WI: DTS/SPAN-130305: Network Integration Testing between UMTS, ISDN and PSTN; Part1 TSS&TP/ Part2: ATS and PIXIT WI: DTS/SPAN-130306: Network Integration Testing between GPRS, and IP networks; Part1 TSS&TP/ Part2: ATS and PIXIT WI: DTS/SPAN-130307: Network Integration Testing between IN, PLMN and ISDN; Part1 TSS&TP/ Part2: ATS and PIXIT Open point: Liaison with SGM

16 Maximilian Frey 11.4. 2002 15 Conclusions TSS & TP and ATS for Network Integration Testing of –UMTS –GSM/GPRS –PSTN –ISDN –IP Testing at Layer3 –Testing at the appropriate interface for Network End-to-End Tests –Testcases for Core Network-Access Network interface as well as for Um Core Network Interfaces ISUP/IN: –Use of PO or PCO –different architectures in one testcase: Use of PO or PCO A contribution to ETSI Workitem for UMTS Testing Methodology??


Download ppt "Maximilian Frey 11.4. 2002 0 P1016 MINIT Mobile IP-Network Integration Testing."

Similar presentations


Ads by Google