Pend Oreille Wetland Mitigation Project #199106000 Albeni Falls Dam Mitigation Project #199206100.

Similar presentations


Presentation on theme: "Pend Oreille Wetland Mitigation Project #199106000 Albeni Falls Dam Mitigation Project #199206100."— Presentation transcript:

1 Pend Oreille Wetland Mitigation Project #199106000 Albeni Falls Dam Mitigation Project #199206100

2 Background Albeni Falls Dam Habitat Losses Mallard5,985 HU Redhead duck3,379 HU Canada goose4,699 HU Bald eagle-breeding4,508 HU Bald eagle-wintering4,365 HU Black-capped chickadee2,286 HU Yellow warbler 171 HU White-tailed deer1,680 HU Muskrat1,756 HU

3 Albeni Falls Mitigation Acquisitions Flying Goose IPurchased 1992436 Acres Flying Goose IIPurchased 1997164 Acres Priest RiverPurchased 2000 63 Acres TacomaPurchased 2000437 Acres Upper TrimblePurchased 2000303 Acres Lower TrimblePurchased 2001440 Acres Carey CreekPurchased 2002117 Acres Beaver LakePurchased 2002255 Acres Gamlin LakePurchased 2002156 Acres

4 Pend Oreille Wetland Mitigation Project

5 Management Strategies Restore Hydrology Restore/Enhance Vegetative Components Control Shoreline Erosion Control Noxious Weeds Control Vehicular Access

6 Implementation

7 Wetland Restoration

8

9 Nesting Island

10 Wheel Valves

11 Shoreline Stabilization

12

13 Protecting Cultural Resources

14 HEP Results PROPERTY NAME BASELINE HUs 5 YEAR HUs 10 YEAR HUs Flying Goose I344.4526.8674.1 Flying Goose II 225.0247.6N/A Priest River94.5N/A Tacoma411.9N/A Upper Trimble96.7N/A Lower Trimble 237.4N/A Carey Creek65.04N/A Beaver Lake155.55N/A Gamlin Lake95.16N/A

15 Albeni Falls Dam Mitigation Project

16 Management Strategies Complete Baseline HEP Complete site-specific management plans Implement recommended management actions Monitor and evaluate the effects of management actions Long-term operation and Maintenance

17 Active Management

18 Management Plans

19 Techniques Removal of grazing Restore wetland hydrology and vegetation Stabilize shorelines Restore shrub and deciduous riparian components Noxious weed control Vehicular access control

20

21 Shoreline Enhancement

22 Conservation

23 Gamlin Lake

24 Beaver Lake

25 Carey Creek

26 Monitoring and Evaluation

27 M & E Vegetation Plots Amphibian Surveys Small mammal Surveys Waterfowl Surveys Neo-tropical Surveys

28