Presentation is loading. Please wait.

Presentation is loading. Please wait.

Agenda Item 6 Action: Inclusion of Cormorants in RMP Status and Trends Monitoring Process: 1) Technical report; 2) EEWG review and recommendation; 3) TRC.

Similar presentations


Presentation on theme: "Agenda Item 6 Action: Inclusion of Cormorants in RMP Status and Trends Monitoring Process: 1) Technical report; 2) EEWG review and recommendation; 3) TRC."— Presentation transcript:

1 Agenda Item 6 Action: Inclusion of Cormorants in RMP Status and Trends Monitoring Process: 1) Technical report; 2) EEWG review and recommendation; 3) TRC recommendation; 4) SC approval Desired Outcome Today: Preview of contents of the report

2

3 Evaluation Against Selection Criteria

4 Relevance to RMP Management Questions

5

6

7

8 Evaluation Against Selection Criteria

9 Power Analysis

10

11 Recommended Design 20 year sampling effort biennial sampling to reduce cost, but maintain reasonable power and obtain timely information on emerging contaminants –annual sampling would provide answers in 20 years or less collect duplicates to continue to refine estimates of variance 10 egg composites at each location as a balance between obtaining representative samples and minimizing impact on reproductive output of each colony

12 Recommended Design include PCBs, LPs, mercury, selenium, dioxins and dibenzofurans, PBDEs, PFCs – other emerging contaminants recommended by the ECWG carefully archive samples for future retrospective analysis cost approximately $25K per year


Download ppt "Agenda Item 6 Action: Inclusion of Cormorants in RMP Status and Trends Monitoring Process: 1) Technical report; 2) EEWG review and recommendation; 3) TRC."

Similar presentations


Ads by Google