Presentation is loading. Please wait.

Presentation is loading. Please wait.

NANC Toll Free IMG Status Report & Activity Summary January 17, 2001.

Similar presentations


Presentation on theme: "NANC Toll Free IMG Status Report & Activity Summary January 17, 2001."— Presentation transcript:

1 NANC Toll Free IMG Status Report & Activity Summary January 17, 2001

2 NANC Toll Free IMG Status Report & Activity Summary Past Activities Face-to-Face Meetings –December 6 through 8, 2000 –January 9 through 11, 2001 Conference Calls –January 4, 2001

3 NANC Toll Free IMG Activity Summary & Status Assumptions and Constraints The system will be backward compatible with existing interfaces and RespOrg and SCP systems. Unless deemed unnecessary, current SCP and RespOrg functionality will be retained. The system performance will, at a minimum, match that of the current system. The new number administration environment will be capable of addressing and responding to requests for new features and functions. This document represents draft NANC TFIMG consensus requirements. Each must be reevaluated and confirmed by the NANC upon vendor response with cost details for value assessment by the NANC. This document does not address the oversight of toll free number administration. An asterisk will be used to specifically identify requirements for new features and functionality. Requirements for new features and functionality will be accompanied by a separate benefit description (contained in a separate document) for value assessment purposes.

4 NANC Toll Free IMG Activity Summary & Status Planned Activities –Face-to-Face Meetings –January 30 through February 1, 2001 –February 12 through 15, 2001 Conference Calls –January 26, 2001

5 NANC Toll Free IMG Activity Summary & Status Questions for NANC: Should the TF IMG include in the technical requirement document for toll free resources the requirement that the vendor describe the system capabilities necessary to verify compliance with FCC rules?

6 NANC Toll Free IMG Activity Summary & Status TF IMG Questions for the NANC (continued) Should the TF IMG include in the requirements document the requirement that the vendor work with the FCC to identify the system capabilities to perform audits to verify compliance with FCC rules? Mitres role


Download ppt "NANC Toll Free IMG Status Report & Activity Summary January 17, 2001."

Similar presentations


Ads by Google