LA GUARDIA AIRPORT: AN ANALYSIS OF AIRPORT EXPANSION AND ACCESSIBILITY Dennis Levene
2
History 1939 Opened for commercial traffic Runways 4-22 and 13-31 1984 1,500mi “Perimeter Rule” 52% Regional Jet Mix 2012 25.7 Million PAX Consistently Rated One of Worst Airports in US
3
Airfield Constrains
4
Current Layout
5
CTB Landside Deficiencies Roadways create conflict between pedestrian and vehicle Existing roadways are congested Insufficient curb frontage impedes passenger pick-up and drop-off
6
Terminal Deficiencies Long lines at ticket areas Security areas too small Insufficient number of concessions past security Gate hold areas cannot accommodate future demand
7
Airside Deficiencies Gate position cannot accommodate modern aircraft fleet Taxilanes are small and narrow Minimal start-up positions Numerous tow-in gates
8
Regional Jet Mix LGA Regional Jet Movement Mix LGA Regional Jet Passenger Mix Forecasted: 34 Million LGA PAX (Current ~ 25.7) 17.5 Million CTB PAX Served by CTB by 2030 (Current ~13 million)
9
Terminal Options
10
New CTB 38 gates and 1.4 Million ft 2 (40% increase)
11
Financing Passenger Facility Charges, Project Company Equity, and Special Project Bonds
12
Accessibility of the Airport Only major airport in NY metro without rapid transit connection
13
Where are they coming from? Originating Zip Code for LaGuardia Passengers Originating Zip Code for LaGuardia Employees
14
Subway Connection Would require just 3 mile connection to N Train Originating Zip Code for LaGuardia Employees
15
SBS Bus Service Dedicated bus lanes, limited stops, transit signal priority M60 stopped 60% of the time and at times the bus moves as slow as 2.7 mph
16
Conclusion New CTB to begin construction in 2014 Will remain open and fully operational throughout construction No realistic major improvements to accessibility planned at this time