Presentation is loading. Please wait.

Presentation is loading. Please wait.

INFODEŇ 7RP ICT Martin Klimo Bratislava 5.3.2010.

Similar presentations


Presentation on theme: "INFODEŇ 7RP ICT Martin Klimo Bratislava 5.3.2010."— Presentation transcript:

1 INFODEŇ 7RP ICT Martin Klimo Bratislava 5.3.2010

2 Inputs from: Programme Committee, IST Advisory Group (ISTAG), http://cordis.europa.eu/ist http://cordis.europa.eu/ist European Technology Platforms http://cordis.europa.eu/technology-platforms/ http://cordis.europa.eu/technology-platforms/ i2010 initiative- a European Information Society for Growth and Employment. http://ec.europa.eu/i2010/http://ec.europa.eu/i2010/ other preparatory activities FP7 Work Programme 2009-10 2

3 3

4 Future and Emerging Technologies (FET) 2. Cognitive systems, interaction, robotics 1. Network and service infrastructures 3. Components, systems, engineering 4. Digital libraries & info mgmt 5. ICT for health 6. ICT for mobility & sustainable growth 7. ICT for independent living and inclusion Socio-economic goals Industry/Tech needs ICT Work Programme Challenges 4

5

6 6

7

8 Grant Evaluation Legal name Short nameProposalAcronym reque sted( k € ) Act ivit y Fundin g schem e Du rat ion 1. (3/ 5) 2. (3/ 5) 3. (3/ 5) Total (10/1 5) SLOVENSKA TECHNICKA UNIVERZITA V BRATISLAVE STUB A 257051 EURODOTS 873_1 CSA-SA 24 4,0 4,512,5 257286 OVERCOME 401_1 CSA-SA 24 3,03,53,09,5 MEDZINARODNE LASEROVE CENTRUM ILC 257306 EduPhotonic s 243_7 CSA-SA 24 3,03,5 10,0 257355 FORECAsT 6254_3 IP 48 2,54,03,09,5 257397 Eurouter 921_1 STREP 30 2,03,0 8,0 257458 BONy3.0 1154_2 STREP 24 2,03,02,07,0 257508 iDENSE 1 3523_9 IP 48 2,53,02,58,0 257508 iDENSE 3503_9 IP 48 2,53,02,58,0 257558 SecVirt 1611_4 STREP 36 1,02,5 6,0 257562 C3plus 2433_9 STREP 36 3,0 9,0 elfa, s.r.o. ELFA 257566 ITEC 1604_2 IP 48 4,04,55,013,5 ATHENA 4674_2 IP 48 2,53,02,58,0 ATHENA 9074_2 IP 48 2,53,02,58,0 CODERS 1813_7 STREP 36 3,03,53,09,5 TWIN 2834_3 STREP 36 2,53,5 9,5 COMECON 2941_3 STREP 36 4,04,54,012,5 INTERSOFT A.S. IS 257852 Intrepid 3591_3 IP 48 5,04,5 14,0 TECHNICAL UNIVERSITY KOSICE TUK 257852 Intrepid 5521_3 IP 48 5,04,5 14,0

9 Grant Evaluation Legal name Short nameProposalAcronym reque sted( k € ) Act ivit y Fundin g schem e Du rat ion 1. (3/ 5) 2. (3/ 5) 3. (3/ 5) Total (10/1 5) Cre-Math- Lab 1534_2 STREP 30 2,54,03,09,5 RF on porous Si 903_1 STREP 36 2,5 7,5 OmniView 3653_7 STREP 36 3,02,52,07,5 ARTIPAN 7163_9 IP 48 2,52,03,07,5 MIRACLE 8003_9 IP 48 2,53,0 8,5 TOOL 2233_5 STREP 36 3,03,5 10,0 LUDOVIT STUR INSTITUTE OF LINGUISTICS SLOVAK ACADEMY OF SCIENCES LSIL 258711 EuroMatrixP lus-X 1169_5 STREP 22 4,0 12,0 VIRTU- SaaS 1811_2 STREP 24 2,03,02,57,5

10 Call title: ICT call 6 Call identifier: FP7-ICT-2009-6 Date of publication: 24 November 2009 Deadline: 13 April 2010 at 17.00.00 (Brussels local time) Indicative budget: EUR 286 million 10

11 11 CHALLENGES 1: networking, networked media and service infrastructures 2: cognitive systems and robotics 3: alternative paths to components and systems 4: Technologies for digital content and languages 5: ICT for health, ageing well, inclusion and governance 6: ICT for a lower carbon economy 7: ICT for manufacturing & factories of the future 8: ICT for learning and access to cultural resources FP7 Work Programme 2011-12

12 12 1: networking, networked media and service infrastructures 2: cognitive systems and robotics 3: alternative paths to components and systems 4: Technologies for digital content and languages 5: ICT for health, ageing well, inclusion and governance 6: ICT for a lower carbon economy 7: ICT for manufacturing & factories of the future 8: ICT for learning and access to cultural resources Challenges 2009-10/2011-12 1.Network and service infrastructure 2.Cognitive systems, interaction, robotics 3.Components, systems, engineering 4.Digital libraries & info mgmt 5.ICT for health 6.ICT for mobility & sustainable growth 7.ICT for independent living & inclusion

13 13 The Future and Emerging Technologies (FET) – Proactive and an Open scheme. – Flagship Initiatives Public-Private Partnerships (PPPs) of the European Economic Recovery Plan: – Energy Efficient Buildings, – Factories of the Future, – Green Cars. FP7 Work Programme 2011-12

14 14 Future and Emerging Technologies Material science Quantum Physics Computational Fluid Dynamics Signal and image processing brain-computer interfaces, neuroprosthetics Quantum computing Signal processing, computational acoustics, audio processing, sound analysis domains of interest

15 15 Future and Emerging Technologies FET Flagship Initiatives Visionary, science-driven, goal-oriented, large-scale, multidisciplinary research initiatives nucleated from ICT future and emerging technologies. Coordination and Support Actions to prepare FET Flagship Initiatives, enabling the launch by 2013.

16 16 Funding schemes COLLABORATIVE PROJECTS (CP) 'small or medium-scale focused research actions' (STREP), 'large-scale integrating projects' (IP). NETWORKS OF EXCELLENCE (NOE) COORDINATION AND SUPPORT ACTIONS (CSA) 'Coordination Actions' (CA), 'Specific Support Actions' (SA).

17 17 Objective ICT-2011Funding Schemes: Indicative budget EUR million Call 1.1 Future Networks IP, STREP, [NoE TBC] CSA 160 min 50% IPs, 30% STREPs 8 1.2 Cloud Computing, Internet of Services and Advanced Software Engineering a), b), c): IP, STREP; 68.5 min 50% IPs, 30% STREPs 8 d): CSA1.5 1.3 Internet-connected objects 1)-2)-3): IP, STREP;27 7 4): CSA3 1.4 Trustworthy ICT (a)-(b)-(c): IP STREP 70 min 50% IPs, 30% STREPs 8 (d): NoE, CSA10 1.5 Networked Media and Search Systems a), b), c): IP and STREP 68 8 d): CSA2 1.6 Future Internet Research and Experimentation (FIRE) IP/STREP38 7 NoE5 CSA2 1.7 Technology foundation: Future Internet Core PlatformOne IP 40 min 30% Open Calls FI-PPP 2010 Duration: 3 years 1.8 Use Case scenarios and pilots Phase Oneup to 8 IPs5 per project FI-PPP 2010 Duration: max 24 months Phase Twoup to 5 IPs 13M€ per project min 10% Open Calls FI-PPP 2011 Duration: max 24 months 1.9 Capacity Building and Infrastructure Support 1. to 3.One CSA3 FI-PPP 2010 duration: 3 years 4. to 7.One IP12 FI-PPP 2011 duration: 2 years 1.10 Programme Management and SupportOne CSA10 FI-PPP 2010 duration: 3 years Content of Calls for Proposals CHALLENGE 1: PERVASIVE AND TRUSTED NETWORK AND SERVICE INFRASTRUCTURES

18 18 WP 2011-2012 Consultation reports available online Draft 1: March 3, 2010

19 19 Ďakujem za pozornosť.


Download ppt "INFODEŇ 7RP ICT Martin Klimo Bratislava 5.3.2010."

Similar presentations


Ads by Google