Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mathias Dewatripont Université Libre de Bruxelles Member of the Scientific Council of the ERC The European Research Council January 2010.

Similar presentations


Presentation on theme: "Mathias Dewatripont Université Libre de Bruxelles Member of the Scientific Council of the ERC The European Research Council January 2010."— Presentation transcript:

1 Mathias Dewatripont Université Libre de Bruxelles Member of the Scientific Council of the ERC The European Research Council January 2010

2 European Research Council │ 2 FP7 (EC)  7 th Framework Programme (FP7)  “Family” of FP7 Specific Programmes  Co-operation  Ideas  People  Capacities  Ideas: complementary to other FP7 support policy vs. science-driven, bottom-up vs. targeted research

3 European Research Council │ 3 FP7 Ideas Programme  Creates the ERC (new “institution”):  Scientific Council (ScC)  Executive Agency (ERCEA)  Provides funding:  € 7.51 bn (2007-2013), around 15% of FP7 budget  Average budget: € ~1 bn per year  Sets overall objectives for research and operating principles

4 European Research Council │ 4 Boost European excellence in "Frontier Research"  by investing in the best researchers and ideas  through competition at European level  on the basis of scientific excellence as the sole criterion  raising incentives towards quality and aspirations of individual researchers  providing benchmarks and leverage towards broader (structural) improvements in European research Strategic Aims Overview

5 European Research Council │ 5 Why “Frontier Research”? Traditional terminology (“basic” / “applied” research “science” vs. “technology”) is no longer appropriate: Research at the frontiers is characterised by an absence of disciplinary boundaries New discoveries are often triggered by real world problems (and vice-versa) Progress in understanding phenomena and techniques for investigation go hand in hand

6 European Research Council │ 6 ERC Grants Strategic principles  All fields of science and scholarship are eligible  investigator-driven, bottom-up  Excellence is the only valid criterion  individual team + research project  Investment in research talent  Attractive, flexible grants, up to five years  under control of the lead researcher (PI)  Independent individual teams in Europe  nationality of researchers is not relevant  host organisation to be located in EU or AS

7 European Research Council │ 7 ERC Grant Schemes Launch Strategy of ERC Scientific Council  Retain – Repatriate – Recruit  Favour “brain gain” and “reverse brain drain”  increase competition, recognition and international visibility for excellent individual scientists and scholars in Europe  ERC Advanced Grant: attract & reward established independent research leaders, up to 5 years, up to € 2.5 (3.5) Mio.  Keep (young) researchers in Europe  improve career opportunities and independence - especially for young researchers  ERC Starting Grant: attract & retain the next generation of independent research leaders, up to 5 years, up to € 2.0 Mio.

8 European Research Council │ 8 ERC Grant Schemes Budget 2007-2013  Total (FP7 Ideas budget): € 7.51 bn  As of 2010, ≈ 1/2 Starting Grants, 1/2 Advanced Grants  Less than 5% for operational ERC management  2007 budget  StG only, € 300 Mio.  2008 budget  AdG only, Spring 2008, € 520 Mio.  2009 budget onwards:  StG + AdG calls.  Budget grows over time (2010: > than € 1bn).

9 European Research Council │ 9 ERC Grant schemes Operational Principles  Application in response to calls for proposals  Staged Evaluation Procedure due to large number of applications  ERC peer review evaluation process Proposals are assessed and ranked by Panels Scientific Council decides on peer review methodology and selects peer reviewers

10 European Research Council │ 10 ERC Advanced Grant (ERC Advanced Investigator Researcher Grant)  Designed to support excellent investigator-initiated research projects by established independent research leaders  Targeting researchers who have already established their independence as team leaders and are exceptional leaders in terms of significance of their research achievements (in the last 10 years) up to 5 years, up to € 3,5 million per grant ~2500 Advanced Grants over 7 years of FP7 (2007-2013)

11 European Research Council │ 11  Individual Research Teams:  headed by a single “Principal Investigator” (team leader) + Co-PI in exceptional cases  of any nationality  if necessary, including additional team members.  The PI has the freedom to choose the research topic and the power to assemble his/her research team (including “co-Investigators”) meeting the needs of the project.  Teams can be of national or trans-national character  Hosting institution located in an EU member state or associated country ERC Grants Who can apply ?

12 European Research Council │ 12 Granting strategy 1.Managing demand for grants  Maximise call budget  By preventing applications over 2 successive years (unless highly ranked but not funded)  Encourage the best to apply  Excellent track record  Strong leadership  Discourage trivial or low-quality applications  Applications should be substantive (one-stage submission with two stage evaluation)  Disincentives to submission of applications which are not of the highest quality

13 European Research Council │ 13 ERC Advanced Grant Evaluation Criteria: Excellence is the sole award criterion 1.Principal Investigator -Quality of research output/track-record (  10-year track-record) -Intellectual capacity and creativity (  CV + leadership profile) 2.Research Project -Ground-breaking nature of the research -Potential impact -Methodology 3.Research Environment (assessed in Step 2 only) -Contribution of the research environment to the project -Contribution of the project to research environment -Participation of other legal entities (if clear/ substantial added value)

14 European Research Council │ 14 Proposal structure Part A: Contains “normal” A1-A3 forms Plus additional “A1T”: “Track Record” –Summary of Scientific Leadership –Summary of Track Record Part B: contains 3 sections & 1 annex  Section 1 –Scientific Leadership (2 pages) –CV (including “funding ID”) (2 pages) –Track record (2 pages) –Extended synopsis (5 pages)  Section 2 = Scientific proposal (15 pages)  Section 3 = Research Environment description (2 pages)  Statement of support from the Host Institution

15 European Research Council │ 15 Benchmarks of “track record” Main author publications in major peer-reviewed multi-disciplinary scientific journals and/or in the leading peer-reviewed journals of their respective research fields Monographs and any translations of monographs (if applicable). Granted patents (if applicable) Invited presentations into peer-reviewed, internationally established conferences and/or international advanced schools (if applicable) Expeditions that the applicant has led (if applicable) International conferences in the field of the applicant that have been organised (member of the steering and/or organising committee) by him/her (if applicable) International Prizes/Awards/Academy memberships (if applicable)

16 European Research Council │ 16 Indicators of “leadership” Content and impact of the major scientific or scholarly contributions of the applicant to his or her own research field and/or neighbouring research fields and, if applicable, their wider societal impact; The international recognition that these major contributions have received from others (publications or appropriate equivalents/additional funding/ students/international prizes and awards/ institution-building/other);

17 European Research Council │ 17 Single submission (1 stage, 2 step) Electronic submission via EPSS Early pre-registration strongly recommended 3 deadlines  Physical Sciences on 24th February at 5 pm.  Life Sciences on 17th March at 5 pm.  Social Sciences on 7th April at 5 pm. Submission of proposals

18 European Research Council │ 18  3 main research domains + interdisciplinary research, with separate indicative budgets: ─Physical Sciences & Engineering (39%) ─Life Sciences (incl. medical) (34%) ─Humanities & Social Sciences (14%) ─Interdisciplinary (13%) Indicative budgets

19 European Research Council │ 19 Panel structure 3 domains – 25 panels StG Panels distinct from AdG Panels Selection of Panel Members responsibility of the ScC

20 European Research Council │ 20 Panels: Interdisciplinary, forward-looking constitution Examples (Panels for ERC Starting Grant)  SH1: Individuals, institutions and markets:  SH1: Individuals, institutions and markets: economics, finance and management  PE10: Earth system science:  PE10: Earth system science: physical geography, geology, geophysics, meteorology, oceanography, climatology, ecology, global environmental change, biogeochemical cycles, natural resources management  LS5: Evolutionary, population and environmental biology:  LS5: Evolutionary, population and environmental biology: evolution, ecology, animal behaviour, population biology, biodiversity, biogeography, marine biology, ecotoxicology, prokaryotic biology

21 European Research Council │ 21 Submission to Panels Applicant submits to a Targeted Panel (of PI choice )  Can choose one additional “Alternative Review Panel” In case cross-panel or cross-domain proposal, evaluation by members of other panels “Interdisciplinary domain” is being populated at a later stage

22 European Research Council │ 22 Evaluation Criteria Scientific Excellence is the sole Criterion 1.Quality of Principal Investigator 2.Quality of research project 3.Research Environment and Resources  Referees and panels evaluate and score criteria 1 and 2 numerically (with equal weights), which will result in the ranking of the proposals  Criteria 3 will be considered (step 2) on a "pass/fail" basis and commented but not scored

23 European Research Council │ 23 Two-step evaluation Step 1:  Section 1 of Part B evaluated against Criterion 1 (PI) and 2 (Research Project)  Proposal needs to pass threshold for both criteria to pass to second step  Evaluated by Panel Members Step 2:  All three sections evaluated against all three evaluation criteria  Evaluated by Panel Members + Remote Evaluators

24 European Research Council │ 24 Evaluation process Step 2 (Panel + remote) Indiv assessments Individual marks Interdisciplinary flag PANEL MEETINGS Ranking Section 1 Section 2 Section 3 Proposal Step 1 (panel) Indiv Assessments Individual Marks PANEL MEETINGS Ranking Section 1 Section 2 Section 3 Proposal Submission + HI support letter Eligibility Check Section 1 Section 2 Section 3 Proposal

25 European Research Council │ 25 Interdisciplinary Domain Interdisciplinary Research domain (cross-domain & cross- panel)  indicative budget of 13% total budget Proposal submitted to a primary panel Step 1:  Primary panel determines if proposal is “interdisciplinary”  Can take into account if secondary panel is indicated Proposal “flagged” as interdisciplinary, if appropriate  Possibility to invite reviews from members of other panels Step 2:  Interdisciplinary proposals, not funded within panel budget, will be transferred to Interdisciplinary Domain for consideration there

26 European Research Council │ 26 Can pay for PI wage (if not paid by Host Institu- tion), sabbaticals, teaching buyout, wage supple- ments. Can pay for co-authors, research assistants, post- docs. Can pay for travel, equipment, … linked to the project. Overhead for Host up to 20% of the grant. Flexible (and portable) grants

27 European Research Council │ 27  ERC Work Programme  ERC Guide for Applicants (Research Grants plus CSAs)  ERC Grant agreement Other:  ERC Guide for Grant Holders  ERC Guide for Peer Reviewers  ERC Rules on submission, evaluation, selection and award procedures Documentation

28 European Research Council │ 28 Applicants Services ERC National Contact Points inform, raise awareness and provide advice on ERC funding opportunities, application, follow-up ERC helpdesk EPSS helpdesk technical support on electronic proposal submission ERC website: http://erc.europa.eu  News Alerthttp://erc.europa.eu

29 European Research Council │ 29 Thank you !


Download ppt "Mathias Dewatripont Université Libre de Bruxelles Member of the Scientific Council of the ERC The European Research Council January 2010."

Similar presentations


Ads by Google