Presentation is loading. Please wait.

Presentation is loading. Please wait.

2006 International Swaps and Derivatives Association, Inc. 2006 Standards Committee Offsite Business Process Working Group Update.

Similar presentations


Presentation on theme: "2006 International Swaps and Derivatives Association, Inc. 2006 Standards Committee Offsite Business Process Working Group Update."— Presentation transcript:

1 1Copyright @ 2006 International Swaps and Derivatives Association, Inc. 2006 Standards Committee Offsite Business Process Working Group Update

2 2Copyright @ 2006 International Swaps and Derivatives Association, Inc. Accomplishments Support for Cash Flow Matching –Schema, examples, and guidelines –Published in version 4.2 Third Working Draft Portfolio Reconciliation –Some minor changes to Position model implemented in 4.2 Trial Recommendation –Schema for messages and documentation has been developed (not published) –Examples have been created (not published)

3 3Copyright @ 2006 International Swaps and Derivatives Association, Inc. Discussion Generic short-form product

4 4Copyright @ 2006 International Swaps and Derivatives Association, Inc. Discussion Generic short-form product Included in DSWG for representing products not supported by FpML Usage of this product –For complex products only? –For what business processes? How detailed should it be? –the pertinence of an optionDetails node

5 5Copyright @ 2006 International Swaps and Derivatives Association, Inc. Discussion Next Steps Refactoring/expansion of the lifecycle events –Back to the discussion that we had in the early stages of the group Bilateral STP Processes


Download ppt "2006 International Swaps and Derivatives Association, Inc. 2006 Standards Committee Offsite Business Process Working Group Update."

Similar presentations


Ads by Google