Download presentation
Presentation is loading. Please wait.
Published byAlexa Howe Modified over 10 years ago
1
802.16m Opening Report August 16, 2010 Calgary, Alberta, Canada Session #68.5 2010-08-19IEEE 802.16m-10/0024r2
2
802.16m Opening Report – Calgary Into Session #68.5: SB first recirculation: 83% return rate; 62% approval – SB Comments to be resolved at Session #68.5 on D7 Amendment Text (802.16-10/0045)802.16-10/0045 408 technical: – 287 MAC (10 Maintenance) – 56 PHY – 12 General – 53 Other 117 editorial comments – 932 +/- 4 reply comments – 130 contributions 75 MAC 23 PHY 6 Femto/SON 2 Multi-BS MIMO 2 Relay 0 LBS 11 e-MBS 11 Other 2010-08-19IEEE 802.16m-10/0024r2
3
802.16m Opening Report- Calgary Plan for the week: Resolve ALL Sponsor Ballot comments (ONLY focus) No SDD CRs Primary comment resolution groups on PHY and MAC during daytime hours Scheduled evening sessions (Mon/Tues) for harmonization and comment resolution as needed Authorize Editor to create D8 and request SB recirc #2 Discuss liaison from ITU-R provides details and the timeline for the ongoing work on Recommendation ITU-R M.[IMT.RSPEC] Discuss WorkPlan and schedule 2010-08-19IEEE 802.16m-10/0024r2
4
802.16m Opening Report- Calgary Plan for the week (cont): – Logistics: Conduct two primary parallel sessions all week (PHY & MAC) – Two parallel daytime SB comment resolution sessions – Common session on Thursday PM (1:30PM-5:00PM) Details to be covered in TGm opening session Also see TGm Draft Agenda, 802.16m-10/0025 Updates to room allocations and individual room detailed activity during the week will be posted to the 802.16 Reflector and Temp upload directory 2010-08-19IEEE 802.16m-10/0024r2
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.