1.  Bond timeline review  Fammatre 3 Classrooms update  Solar Project update  Steindorf Project update –  Lease opportunity at DO Workshop 2.

Similar presentations


Presentation on theme: "1.  Bond timeline review  Fammatre 3 Classrooms update  Solar Project update  Steindorf Project update –  Lease opportunity at DO Workshop 2."— Presentation transcript:

1 1

2  Bond timeline review  Fammatre 3 Classrooms update  Solar Project update  Steindorf Project update –  Lease opportunity at DO Workshop 2

3 3 We are here!

4  Current status: ◦ Budget: $1.65M ◦ Construction documents are in the works using pre-approved plan ◦ Target DSA “over the counter” review March 16 ◦ Lease, leaseback with Bruns Belmont for the building. Award March 20 ◦ Bid sitework and utilities. Award April 3 ◦ Start construction end of April ◦ Complete construction mid August 4

5 5 3 New Kindergarten CR’s

6 6

7  Current status: ◦ Budget: $4.7M ◦ Request for Proposals is being drafted by KPDC ◦ Send to solar providers in March ◦ Receive proposals and select solar provider in April ◦ April notice to proceed with design ◦ September or October possible construction start 7

8  Current status: ◦ Budget: $16.5M ◦ Committee established STEAM requirements ◦ Curriculum synopsis board presentation tonight ◦ Building requirements board presentation tonight ◦ Proceed with Schematic Design (SD) ◦ SD presentation to board on April 17 ◦ April – May. Pause until bond election. ◦ June 2014 – April 2015 CEQA, construction documents, permitting and bidding ◦ May 2015 construction start 8

9 STEAM Curriculum Synopsis:  School-wide focus on STEAM Curriculum ◦ Project-based learning: “Learning by doing”  STEAM Labs and Makers Labs ◦ Integrated Curriculum ◦ Common Core State Standards in action  More informational Text  Depth of Knowledge ◦ The 4 Cs of 21 st Century Skills  Risk Taking 9

10 Putting the “A” in STEAM  Four areas of the Arts ◦ Visual Arts ◦ Music ◦ Theater Arts ◦ Dance  Integrated Curriculum Examples ◦ Mathematics – Visual Arts & Music ◦ Language Arts – Theater & Digital Media ◦ Science – Visual Arts, Music, & Makers Labs ◦ Physical Education – Science & Dance 10

11  STEAM Space Requirements: ◦ Modernize existing buildings totaling 25,000 sf and add two new buildings totaling 9,000 sf. Sustainable construction with LEED certification. ◦ 2 modernized classrooms per grade K8 = 18 CR’s (1 is new) ◦ Flexible multi-use space for dining, performing arts, PE ◦ Typical administrative support spaces and restrooms ◦ Flexible Media Center ◦ Flexible Makers Labs ◦ Flexible Science Lab ◦ Flexible outdoor learning spaces in courtyards ◦ Outdoor amphitheater for performing arts ◦ Parking and play areas 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19  Potential ability to accommodate some displaced Steindorf Tenants at the DO  Existing workshop 3,500 sf is underutilized. Could be quickly renovated and leased along with some of maintenance yard.  Build a new smaller workshop. 2,000 sf  Expand maintenance yard into front parking lot.  Estimated cost around $1.3M 19

20 20

21 21