Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 TDTWG Update to RMS Wednesday March 11, 2009. 2 Primary Activities 1.Reviewed ERCOT System Outages and failures 2.ERCOT update of browser support for.

Similar presentations


Presentation on theme: "1 TDTWG Update to RMS Wednesday March 11, 2009. 2 Primary Activities 1.Reviewed ERCOT System Outages and failures 2.ERCOT update of browser support for."— Presentation transcript:

1 1 TDTWG Update to RMS Wednesday March 11, 2009

2 2 Primary Activities 1.Reviewed ERCOT System Outages and failures 2.ERCOT update of browser support for SCR750 3.Discussed merger of Market Metrics Work group activities, Goals, Scope, and Objectives 4.Review and update TDTWG website to provide links for Metrics Reporting. 5.Review Market Metric reports 4th QT 2008 and Metrics Overview 6.Created draft RMGRR for the Merger of TDTWG and MMWG

3 3 1. Continued working with the ERCOT Manager of Operations to address each system incident. Marcus Weber and Trey Felton reviewed the summary and detail pages of the IT incident log. #1

4 #2 2. ERCOT update of browser support for SCR750. Based upon RMS discussion in February, consensus was reached pending TDTWG and ERCOT review list of specific browsers that ERCOT should support, and indicate a timeframe when ERCOT will be able to support specified browsers (i.e. 6 months after current browser release). Section 4, Browser Compatibility, added to Retail SLA. Vote at RMS in April, IE.7 guide available on web TDTWG site. Response time and system degradation SLA was reviewed. 4

5 #3 3. Approved Goals, Scope, and Objectives for 2009. Based upon RMS discussion in February, to merge the two work groups TDTWG and MMWG. The combined Goals, Scope and Objectives were reviewed, consensus was reached. Texas Data Transport Work Group will retain the name as it is recognized in the market and majority of scope did not change. 5

6 6 #4 4. Discussed and reviewed TDTWG and Metrics web site format. Maintain links to MMWG notes via TDTWG main page All History will be retained for MMWG RMS will have one link to TDTWG MMWG link will be deleted under RMS

7 7 #5 5. Discussed and reviewed Market Metrics Q4 2008 reports. Discussed combined TDTWG and MMWG responsibilities pertaining to reporting.

8 8 #6 6. Created draft RMGRR for the Merger of TDTWG and MMWG Worked with Sandra Tindall from Market Rules to create draft RMGRR for TDTWG review and approval by during April 8 th conference call.

9 9 TDTWG Follow-up item: Reminder Note from TDTWG December mtg: A full test of the Disaster Recovery system is scheduled to be tested in 2009 (related to incident of 10/30/08).

10 10 Thank You


Download ppt "1 TDTWG Update to RMS Wednesday March 11, 2009. 2 Primary Activities 1.Reviewed ERCOT System Outages and failures 2.ERCOT update of browser support for."

Similar presentations


Ads by Google