Presentation is loading. Please wait.

Presentation is loading. Please wait.

A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Work Plan 2000 APNIC Annual Member Meeting Seoul, 3 March 2000.

Similar presentations


Presentation on theme: "A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Work Plan 2000 APNIC Annual Member Meeting Seoul, 3 March 2000."— Presentation transcript:

1 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Work Plan 2000 APNIC Annual Member Meeting Seoul, 3 March 2000

2 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Work Plan 2000 Priority strategies Priority strategies Training Training Documentation/Communications Documentation/Communications Marketing Marketing Security Security Consistency Consistency Policy Policy Co-ordination Co-ordination

3 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Work Plan 2000 Activities underway or proposed Activities underway or proposed Translation Translation Automation Automation Routing registry Routing registry Legacy space management Legacy space management CA pilot project CA pilot project ICANN ICANN Member and policy meeting Member and policy meeting

4 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Training Strategy Develop schedule for 2000 Develop schedule for 2000 Call for EOI Call for EOI Coordinate with AP* ICANN seminars where possible Coordinate with AP* ICANN seminars where possible Develop course structure Develop course structure New members and advanced New members and advanced Investigate alternative delivery systems Investigate alternative delivery systems Training certification Training certification Investigate formal systems in 2000 Investigate formal systems in 2000

5 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Marketing Strategy Marketing activities Marketing activities Outreach and media Outreach and media Newsletter (currently shared with APIA) Newsletter (currently shared with APIA) Announcements/Bulletins Announcements/Bulletins Member survey Member survey Enquiries and Complaints Enquiries and Complaints Marketing design and quality control Marketing design and quality control APNIC needs... APNIC needs... More consistent image for APNIC More consistent image for APNIC More outreach More outreach

6 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Translation Project Raised by member survey 1999 Raised by member survey 1999 No resources allocated so far No resources allocated so far Little resource capacity for coordination Little resource capacity for coordination Distributed translation Distributed translation Call for proposals for translators located in region Call for proposals for translators located in region Budget allocation $50,000 Budget allocation $50,000 e.g. 5-10 contracts of $5000 to $10000 e.g. 5-10 contracts of $5000 to $10000 Ongoing management Ongoing management Monitoring, review and renewal of contracts Monitoring, review and renewal of contracts under Documentation Manager under Documentation Manager

7 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Automation Project Automation toolkit Automation toolkit Develop comprehensive object library Develop comprehensive object library Member administration Member administration Currently beta test status Currently beta test status Allocation management Allocation management Design and implementation Design and implementation Links to other APNIC systems Links to other APNIC systems Financial/Accounting Financial/Accounting CA Pilot CA Pilot

8 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Routing Registry Under consideration for some time Under consideration for some time Occasional member requests (increasing?) Occasional member requests (increasing?) Opportunity for leadership from APNIC Opportunity for leadership from APNIC Discussions during Routing SIG (report later) Discussions during Routing SIG (report later) Implementation Implementation Currently ripe-181 - limited functionality Currently ripe-181 - limited functionality Future RPSL - depends on software choice Future RPSL - depends on software choice BIRD (Cengiz), MERIT (IRRd), David Kessens code BIRD (Cengiz), MERIT (IRRd), David Kessens code RIPE-ng, ARIN-ng RIPE-ng, ARIN-ng

9 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Legacy Address Space Project Existing process case-by-case Existing process case-by-case Transfer of whois and in-addr records Transfer of whois and in-addr records Propose to complete process Propose to complete process All AP legacy space to be managed by APNIC All AP legacy space to be managed by APNIC Supported/requested by ARIN Supported/requested by ARIN Implications for in-addr management Implications for in-addr management Proposal being developed by RIRs (meeting at next IETF) Proposal being developed by RIRs (meeting at next IETF)

10 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E CA Pilot Project Feasibility project objectives: Feasibility project objectives: Analyse impact of introducing PKI Analyse impact of introducing PKI Provide focus for discussions Provide focus for discussions Raise awareness of PKI in general Raise awareness of PKI in general Conclusions Conclusions Significant benefits for members security Significant benefits for members security Growing standards support for PKI Growing standards support for PKI See: http://www.apnic.net/ca See: http://www.apnic.net/ca

11 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E CA Pilot Project Certificate issued to APNIC member Certificate issued to APNIC member Corresponds to Membership of APNIC Corresponds to Membership of APNIC Provides uniform mechanism for all security needs : Provides uniform mechanism for all security needs : Encryption and signature of email with APNIC Encryption and signature of email with APNIC Authentication of access to APNIC web site Authentication of access to APNIC web site Secure maintainer mechanism for APNIC database Secure maintainer mechanism for APNIC database Future authorisation mechanism for Internet resources Future authorisation mechanism for Internet resources

12 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E CA Pilot Project

13 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E ICANN in 2000 Funding obligation Funding obligation RIRs share obligation for 10% of ICANN funding RIRs share obligation for 10% of ICANN funding Need to finalise RIR division of funding Need to finalise RIR division of funding ICANN Contract ICANN Contract Funding obligation and controls Funding obligation and controls Operational matters Operational matters Policy principles/constraints Policy principles/constraints ASO Secretariat ASO Secretariat APNIC host until Nov 2000 APNIC host until Nov 2000

14 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E ICANN in 2000 Address Council Address Council Open nominations process (announced) Open nominations process (announced) 3 AP members appointed by APNIC EC in 1999 3 AP members appointed by APNIC EC in 1999 Staggered terms - 1,2,3 years Staggered terms - 1,2,3 years One member to be replaced in 2000 One member to be replaced in 2000 AC election process AC election process ARIN and RIPE: Vote at open meeting ARIN and RIPE: Vote at open meeting APNIC needs to determine mechanism APNIC needs to determine mechanism Discussion later in this meeting Discussion later in this meeting

15 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E ICANN in 2000 ASO Board Members ASO Board Members Open nominations process Open nominations process 3 members appointed by AC in 1999 3 members appointed by AC in 1999 1 from each region 1 from each region Staggered terms - 1,2,3 years Staggered terms - 1,2,3 years AP member to be replaced in 2000 AP member to be replaced in 2000 Must be replace by AP rep, UNLESS another RIR formed and joins ASO before this time Must be replace by AP rep, UNLESS another RIR formed and joins ASO before this time

16 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Next Member Meeting Calls for proposals Calls for proposals No responses so far No responses so far Brisbane Brisbane Direct flight from most major AP cities Direct flight from most major AP cities Modern convention centre and hotels Modern convention centre and hotels Inexpensive Inexpensive Close to attractions - e.g. Golf and Gold Coast! Close to attractions - e.g. Golf and Gold Coast! Suggested timing Suggested timing October 2000 October 2000

17 A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E Work plan 2000 Questions? Questions?


Download ppt "A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Work Plan 2000 APNIC Annual Member Meeting Seoul, 3 March 2000."

Similar presentations


Ads by Google