Presentation is loading. Please wait.

Presentation is loading. Please wait.

School Facilities Construction Commission Project Overview Facilities Inventory and Classification System (KFICS) Student Achievement through High Performance.

Similar presentations


Presentation on theme: "School Facilities Construction Commission Project Overview Facilities Inventory and Classification System (KFICS) Student Achievement through High Performance."— Presentation transcript:

1 School Facilities Construction Commission Project Overview Facilities Inventory and Classification System (KFICS) Student Achievement through High Performance Schools October 2011

2 KFICS Classification Tools – By Cost or Investment 2 Condition + Suitability + Technology Needs Budget ($) = Kentucky Facility Index (KFI) Kentucky Facility Index: Current Replacement Value ($) SUMMARY of Cost or Investment Budget Classification Tools  FCI (Condition Index)  KSI (Suitability Index)  KTI (Technology Index)  KFI (Kentucky Facility Index)

3 KFICS Benchmark Metrics – Condition FCI Industry “standards”: FCICondition <.05Good.05 thru.10Fair.10 >Poor Industry “standards”: FCICondition <.05Good.05 thru.10Fair.10 >Poor Needs Budget of 10K CRV of 100K 10,000 100,000 =.10 FCI EXAMPLE: Condition Needs Budget ($) = Facility Condition Index (FCI) Condition Index: Current Replacement Value ($) Average existing: ~.25 to.35 ~.65 -.70 is a flag to consider major renovation or demolition 3

4 KFICS School Condition Data and Criteria 4 Replacement Cost Model

5 KFICS Building / School Condition Score 5

6 Knowing What You Have: Condition Concepts 6 1960 1980 2000 2020 Deferred Maintenance Example: 20 year rooftop HVAC unit 2011 Installed Unit “expired” in 1980 and was unfunded for replacement Unit is 50% used; predict renewal budget for 2020

7 KFICS: Managing Facility Failures  Three types of failures A. Early (warranty period) B. Intrinsic C. Wear-out (run to failure)  Actionable investments to extend life during the Intrinsic Period (A&B)  Investments to manage failure risk in the Wear- Out period (C) 7 Early Failure Period Intrinsic Failure Period “Useful Life” Wear -Out Period “Run to Failure” 0 Time Failure Rate h(t) Component Failure Curve A B C Source: Engineering Statistics Handbook

8 FCI vs. Facility Age 8 65% 60% (Total Renovation) 30% (roof, HVAC) KDE Renovation Points

9 SUMMARY of Criteria Classification Tools  Condition Score (1- FCI)  Suitability Score (Scored Points / Possible Points)  Technology Score (Scored Points / Possible Points)  Kentucky School Score (KSS) 9 KFICS Classification Tools – By Criteria (Condition Score *.75) + (Suitability Score *.20) + (Technology Score *.05) = Kentucky School Score (0 – 100) Kentucky School Score :

10 KFICS Criteria - Suitability / Technology Scoring 10

11 11 KFICS Criteria - Suitability / Technology Scoring

12 KFICS Criteria - Suitability / Technology Models 12

13 KFICS Scoring Weights  Condition = 75% of School Score  Suitability = 20% of School Score  Technology = 5% of School Score 13

14 Required Investment Benchmarks  The First Set of Benchmark Metrics is based on Cost or Required Investment: 14 Index Formula or Calculation Max/ Minimum Values Kentucky Facility Index (KFI) (Repair$ + Suitability$ + TechRead$) / Replace$ Worst 143.49% | Best 0% Kentucky Suitability Index (KSI) Ratio of Suitability cost / Replacement valueWorst 35% | Best 0% Kentucky Technology Index (KTI) Ratio of Technology cost / Replacement valueWorst 1.77% | Best 0% Facility Condition Index (FCI) Ratio of Repair cost / Replacement valueWorst 106.72% | Best 0%

15 Criteria Scoring Benchmarks  The Second Set of Benchmark Metrics is built on Criteria Scoring: 15 Index Formula or Calculation Max/ Minimum Values Condition Score(1-FCI %) times 100Worst 0 | Best 100 Suitability Score Criteria Based Scored Points / Possible Points Worst 0 | Best 100 Technology Score Sum of Points for Technology Criteria Scored Worst 0 | Best 100 School Score(Condition Score *.75) + Suitability Score *.20) + (Technology Score *.05) Worst 0 | Best 100

16 Scores for Recently Renovated Building Investment Requirements Condition Index Criteria Scoring Repair:$0KFI:2.24% Condition Score: 100.00 Suitability:$269,574KSI:2.24% Suitability Score: 93.60 Tech Readiness: $0KTI:0.00% Technology Score: 100.00 Replace- ment Value: $12,034,410FCI:0.00%School Score:98.72 16

17 Scores for Older Non-Renovated Building Investment Requirements Condition Index Criteria Scoring Repair:$7,329,689KFI:93.58% Condition Score: 22.72 Suitability:$1,470,080KSI:15.50% Suitability Score: 62.46 Tech Readiness: $76,220KTI:0.80% Technology Score: 51.40 Replace- ment Value: $9,485,000FCI:77.28%School Score:32.10 17

18 District FeedBack System 18 Archived report versions Web-based report review comments from district KDE response on actions taken PDF School Report


Download ppt "School Facilities Construction Commission Project Overview Facilities Inventory and Classification System (KFICS) Student Achievement through High Performance."

Similar presentations


Ads by Google