Progress Meeting 4 4 th May 2011 ESA-ESRIN. 17/04/20092 Timeline Phase 1 –Formally approved Phase 2 –Started Jan 1 st 2011. –Progress Meeting 4 on May.

Similar presentations


Presentation on theme: "Progress Meeting 4 4 th May 2011 ESA-ESRIN. 17/04/20092 Timeline Phase 1 –Formally approved Phase 2 –Started Jan 1 st 2011. –Progress Meeting 4 on May."— Presentation transcript:

1 Progress Meeting 4 4 th May 2011 ESA-ESRIN

2 17/04/20092 Timeline Phase 1 –Formally approved Phase 2 –Started Jan 1 st 2011. –Progress Meeting 4 on May 4 th, 2011 –UCM-2 on 5-6 October, 2011 at NMCI in Cork, Ireland –Planned Finish on 31 st December, 2011 Phase 3 –Planned Start on Jan 1 st 2012. –PM6 in May 2012, exact date TBD –UCM-3 in October 2012, venue and exact date TBD –Planned Finish (and end of project) on 31 st Dec 2012

3 17/04/20093 PM4 Deliverables 1.D.8 – Online tools for MDB (demo at PM4 and final release in June) 2.D.12 – Global Wave Statistics 3.D.13 – 4 months operations of NRT Data 4.D.14 – Verbal update on demonstration products status 5.D.17 – 1 st Quarterly L2P Quality Control Report 6.D.21 – 2 Monthly Operational PS-WFVS reports 7.D.24 – 3 rd GlobWave Newsletter

4 17/04/20094 1.D.8 – Online tools for MDB (JF, June/11)) 2.D.9 – Handbook (EA+FC, July/11). 3.D.21 – PS-WFVS: GlobWave DDS (July/11), Report on first year of operation (Dec/11), and 11 monthly reports (Dec/11) (HS+DP) 4.Merged Altimeter product (JF, July/11) 5.D.17 – 2 nd, 3 rd and 4 th Quarterly L2P Quality Control Reports (EA+FC, July-11/Oct- 11/Jan-12) 6.D.24 – 4 th GlobWave newsletter (GB+EP, Oct/11) 7.D.25 – Minutes of the 2 nd UCM, Nov/11 (GB+EP) 8.D.26 – Recommendations of the GlobWave Steering Team (Nov/11, GB+EP) 9.D.28 – Annual User Assessment, Phase 2 (Nov/11, GB+EP) 10.D.6 – L2P Product User Guide, Phase 2 rev (EA+FC, Dec/11) 11.D.13 – L2P satellite wave data, 12 months of NRT operations (JF, Dec/11) 12.D.14 – Demonstration Products (GB, Dec/11) 13.D.18 – 1 st Annual L2P Quality Control Report (EA+FC, Dec/11) Plan – Deliverables Required by end of Phase 2

5 17/04/20095 Possible Demonstration Products Climatology Demo Product (Liz Kent, NOC) GNSS-R retrieval of sea state related parameters (Martin Unwin, SSTL) Radarsat Wave Retrievals (Will Perrie, DFO-MPO) Coastal Altimetry (Jerome Benveniste, ESA) Cross Seas Demo Product (Fabrice Collard, CLS)