1 F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting October 20, 2014

2 2014 Facility Upgrades MCenter Beamline! Area for High Rate Trackers (M03) New Instrumentation – Wire chamber tracking system – Si strip telescope Improved Infrastructure – Temperature control – Table control / new tables http://www-ppd.fnal.gov/FTBF/2

3 2014 Statistics 18 Experiments 321 Collaborators 84 Institutions 20 Countries 9 New TSW’s http://www-ppd.fnal.gov/FTBF/3

4 Beam Delivery 416,139 Total Fxd Trgt events 183,225 MTest beam pulses 16,496 MCntr beam pulses MTest Beam Sum: 7.9E15 MCntr Beam Sum: 2.4E16 http://www-ppd.fnal.gov/FTBF/4

5 Weekly Usage MTest – 48 available beam-weeks – 78 experiment-weeks – 6 weeks of beam studies/ commissioning – 177% Usage MCenter – 5 available beam-weeks – 0.5 experiment-weeks – 5 weeks of beam studies/ commissioning – 100% Usage http://www-ppd.fnal.gov/FTBF/5

6 Experiments (18) 9 new TSW’s approved 11 new experiments started 7 returning experiments http://www-ppd.fnal.gov/FTBF/6

7 Experiment Types T1015 DRO Calorimetry T1037 FLYSUB-Consortium T958 FP420 (CMS+ATLAS) Fast Timing Group T979 Fast Timing w/Cherenkov Counters T989 DAMIC T1058 Secondary Emission Calorimeter T1031 Atlas Tile Calorimeter Electronics T1036 CMS High Rate Pixel Detector T1041CMS Forward Calorimetry T1049 ATLAS large scale TGC T1056 ATLAS DBM Module Qualification T992 Radiation-hard Sensors for the SLHC T1042 Muon g-2 straw tracker T1018 Spacordion Tungsten Fiber Calorimeter T1044 sPHENIX T1048 PHENIX fast TOF T1054 sPHENIX Pre-Shower Calorimeter T994 JASMIN http://www-ppd.fnal.gov/FTBF/7 Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaT

8 Institutions (84) http://www-ppd.fnal.gov/FTBF/8

9 Summary Facility is growing at an incredible rate, and is on track to continue 321 collaborators this year Will likely break 500 next year, with new beamline 1.4 FTE for facility management is not enough http://www-ppd.fnal.gov/FTBF/9

10 ADDITIONAL SLIDES http://www-ppd.fnal.gov/FTBF/10

11 Latest Experiments http://www-ppd.fnal.gov/FTBF/11 T-1056 5 Users T-1041 55 Users SY Water Proble m

12 So Far in FY 2014 70 Experiment Weeks 1 Installation week 6 weeks Facility beam studies http://www-ppd.fnal.gov/FTBF/12

13 Current Status MTest T-1041 running now. (6 sub-experiments) Wednesday they will uninstall Thursday will be spent installing T-992, T-1058, T-1015, and T- 958 (until Sept Shutdown) MCenter LAriaT Commissioning Characterization of Tertiary Beam T- 979 will run parasitically with punch-through muons http://www-ppd.fnal.gov/FTBF/13