1 The information contained in this document is highly confidential and privileged. No part of this document may be copied or circulated without express written permission from Anantara Solutions Pvt. Ltd. This document is for discussion purposes only. Test Automation of SCON Test Automation of SCON - Project Proposal Anantara Solutions Private Limited

2 Table of contents 1. About Anantara2. The Business Landscape3. Business Problem4. Proposed Solution5. Project Requirements6. Similar Accomplishments7. Our Approach8. Proposed Schedule9. Assumptions and Risks10. Deliverables Summary11. Deliverables from Siemens12. Proposed Team for Phase-1 2 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

3 About Anantara  <> 3 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

4 The Business Landscape SAP 41 (Main Manufacturing) SAP 41 (Main Manufacturing) M.C.M. SHARE (Oracle Siebel) SCON Configure VB App E-Commerce Country Specific Instances of SAP SAP 40 - USA SAP 45 – Germany SCON: Quotation Generation application uses complex algorithm for various product types; details fetched from SHARE

5 The Business Landscape SAP system maintains all details of products and prices Diagrams & Literature are maintained in MCM, which provides the data to e- commerce website & the SHARE Siebel system Siebel system manages quotations through SCON, a VB application SCON is driven by complex and detailed logic for quotations, which has validation requirements

6 The Business Problem Logic is complex in SCON quotation module 60-70% of the changes impact SCON Around 200 test cases in SCON, low test coverage per release cycle 60-75% effort of new releases goes into validation of quotations Long cycle time for Manual Test Runs of highly business-critical system Complete manual regression testing of SCON not achieved usually 6 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

7 Proposed Solution Phased approach towards automation of SCON regression testing Phase1 Pre-POC Understand the requirements in detail and develop automation plan Phase2 POC Develop a proof-of- concept demonstrating the identified test cases Phase3 Project Develop the test automation framework and deliver the complete solution for regression testing of SCON 7 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

8 Project Requirements Understand the ecosystem involving SAP-MCM-Share-SCON Develop understanding of quotation logic using onsite interactions and documentation Identify complete list of test scenarios with prioritiesValidate existing order management systemDesign automation solution for regression tests of SCON Deploy data generation for quotation module, which is complex and has extensive testing cycles Handover of automation solution to Siemens with detailed training artefacts

9 Our Approach: Pre-POC to Project Initiation Pre-POC (2-3 consultants working onsite for 3 weeks) Study the requirements, environment and identify tests to be automated Will cover requirement analysis and designing the approach for POC Deliverable: Proposal presented for the POC phase Proof Of Concept (offshore team over approx. 10 weeks) Automation solution development of identified POC tests Test automation environment set up, and automation approach finalized Deliverable: Demonstration of identified paths for automation Project (offshore team with onsite coordinator) Implementation of automation for complete set of test cases Cost of consulting plus expenses Deliverable: complete solution with extensive training videos

10 Our Approach: Pre-POC to Project Initiation 10 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

11 Proposed Pre-POC phase schedule 11 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

12 Assumptions and Risks Assumptions Current state of defects to be provided along with the system Parallel development will be minimum during automation development Availability of SMEs, documentation and stage data for automation development Risks Variations in planned scope of POC or project can impact timelines Access to Siemens environment for offshore team Availability of Siemens team for regular review of progress 12 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

13 Deliverables Summary Pre- Phase Complete requirement analysis Identification of apt automation tool Identification of automation methodology Identification of test cases for POC Definition of POC objectives and scope POC Demonstration of test scenarios identified Methodology for complete automation Project Plan with estimates and list of identified test cases Project Complete automation of identified scenarios Documentation of automation usage 13 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

14 Deliverables from Siemens Training/ demonstration on: SCON functionalities Logic of quotation- generation Integration with SHARE and other systems Availability of:Availability of: Subject Matter Experts Documentation Source code Top management buy-in for: Automation tool to be used Automation approach 14 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

15 Case Study 15 Copyright Anantara Solutions Private Limited 2007. All rights reserved. SIMILAR BUSINESS CHALLENGE Configuration driven AUT - 3 million test flows - New flows with every new customer/study - Manual testing causing business loss - Complete coverage through manual testing impossible - Long regression test cycles SIMILAR BUSINESS CHALLENGE Configuration driven AUT - 3 million test flows - New flows with every new customer/study - Manual testing causing business loss - Complete coverage through manual testing impossible - Long regression test cycles TEST AUTOMATION DESIGNED FOR AUTReduced testing cycle from 6 weeks to 5 days per releaseSaves 3 person years of test effort per yearTotal savings in testing costs USD 1.2 million at current rateSolution adapts to customizations (Self-navigation feature)Executes test-flows automatically for all regression/study testsGenerates test data on the flyCovers both positive and negative testsExecutes comprehensive workflow branches and conditional testsCreates XML based reports – compatible with web/MS * References available on request

16 Our Team for Pre-POC Deepak Mehta Principal Consultant 16+ years experience in test strategy design, planning and execution PMP Certified, rich experience in Consulting, project planning and execution Hands-on with multiple technologies with specific expertise in systems integration, test automation, & system design 16 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

17 Our Team for Pre-POC Amit Kulshrestha Senior Consultant 11+ years experience in test strategy design, planning and execution Adept in requirement analysis and solution designing Expertise in functional test automation, database testing, manual testing Development experience with VB 6.0 Hands-on with QTP, WinRunner, Test Complete Exposure to performance testing of web applications 17 Copyright Anantara Solutions Private Limited 2007. All rights reserved.

18 18 Thank you Helping You Compete Better ! www.anantsol.com Copyright Anantara Solutions Private Limited 2009. All rights reserved.