1 IRMIS3 Status and Plans Gabriele Carcassi 10/11/2010

2 IRMIS3 modules Module nameGoalStatus Infrastructure Components (Lightweight) inventory Cabling eLog Lattice Save Restore Magnet measurement PV Crawler Epics DB generation NothingPrototypeAlphaBetaProduction

3 Infrastructure  Requirements Build/packaging – production Logging – production Security (AuthZ/AuthN) – prototype  TBD Improve logging  Not covered Nothing that we are aware  Available in the distribution with general support Maintainer: Gabriele Carcassi

4 Component module  Requirements Ability to edit component types – production Ability to edit components (installations) in hierarchy – production  TBD Final UI touches  Not covered Nothing that we are aware  Available in the distribution with general support Maintainer: Gabriele Carcassi

5 Cabling module  Requirements Ability to edit cable types – production Ability to edit cable tray/partition/paths – production Ability to edit cables – production  TBD Load test (missing data) UI consolidation  Not covered Nothing that we are aware  Available in the distribution with general support Maintainer: Gabriele Carcassi

6 Lightweight inventory module  Requirements Ability to track parts – production Ability to install/uninstall parts – production  TBD Installation/uninstallation history – will export to the eLog  Not covered Shipping and receiving – not planned Components lifecycle – not planned Travelers – not planned  Available in the distribution with general support Maintainer: Gabriele Carcassi

7 eLog module  Requirements Data model – prototype UI – prototype API – nothing  TBD Requirement verification and implementation  Not covered  Not available Maintainer: Don Dohan

8 Lattice module  Requirements Data model – prototype PVAccess service/API – prototype  TBD Requirement verification and implementation  Not covered Multiple lattices using different “as-built” parameters  Not available Maintainer: Don Dohan  Old version available in the distribution as is Maintainer: Gabriele Carcassi

9 Save restore module  Requirements Data model – prototype PVAccess service/API – prototype  TBD Requirement verification and implementation  Not covered  Not available Maintainer: Don Dohan

10 Magnetic measurement module  Requirements Data model – prototype  TBD Requirement verification and implementation  Not covered  Not available Maintainer: Don Dohan

11 PV Crawler module  Requirements PV Crawler – production in IRMIS2 API – alpha UI – nothing  TBD Test and bundle the crawler with IRMIS3, finalize API and implement UI  Not covered Nothing that we are aware  Not available Maintainer: ?

12 EPICS db generation module  Requirements Channel description for component types – prototype Control hierarchy can be mined to guide/validate db ?  TBD ??  Not covered ???  Not available Maintainer: ????