Download presentation
Presentation is loading. Please wait.
Published byJewel Benson Modified over 9 years ago
1
IRMIS3 Status and Plans Gabriele Carcassi 10/11/2010
2
IRMIS3 modules Module nameGoalStatus Infrastructure Components (Lightweight) inventory Cabling eLog Lattice Save Restore Magnet measurement PV Crawler Epics DB generation NothingPrototypeAlphaBetaProduction
3
Infrastructure Requirements Build/packaging – production Logging – production Security (AuthZ/AuthN) – prototype TBD Improve logging Not covered Nothing that we are aware Available in the distribution with general support Maintainer: Gabriele Carcassi
4
Component module Requirements Ability to edit component types – production Ability to edit components (installations) in hierarchy – production TBD Final UI touches Not covered Nothing that we are aware Available in the distribution with general support Maintainer: Gabriele Carcassi
5
Cabling module Requirements Ability to edit cable types – production Ability to edit cable tray/partition/paths – production Ability to edit cables – production TBD Load test (missing data) UI consolidation Not covered Nothing that we are aware Available in the distribution with general support Maintainer: Gabriele Carcassi
6
Lightweight inventory module Requirements Ability to track parts – production Ability to install/uninstall parts – production TBD Installation/uninstallation history – will export to the eLog Not covered Shipping and receiving – not planned Components lifecycle – not planned Travelers – not planned Available in the distribution with general support Maintainer: Gabriele Carcassi
7
eLog module Requirements Data model – prototype UI – prototype API – nothing TBD Requirement verification and implementation Not covered Not available Maintainer: Don Dohan
8
Lattice module Requirements Data model – prototype PVAccess service/API – prototype TBD Requirement verification and implementation Not covered Multiple lattices using different “as-built” parameters Not available Maintainer: Don Dohan Old version available in the distribution as is Maintainer: Gabriele Carcassi
9
Save restore module Requirements Data model – prototype PVAccess service/API – prototype TBD Requirement verification and implementation Not covered Not available Maintainer: Don Dohan
10
Magnetic measurement module Requirements Data model – prototype TBD Requirement verification and implementation Not covered Not available Maintainer: Don Dohan
11
PV Crawler module Requirements PV Crawler – production in IRMIS2 API – alpha UI – nothing TBD Test and bundle the crawler with IRMIS3, finalize API and implement UI Not covered Nothing that we are aware Not available Maintainer: ?
12
EPICS db generation module Requirements Channel description for component types – prototype Control hierarchy can be mined to guide/validate db ? TBD ?? Not covered ??? Not available Maintainer: ????
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.