Presentation is loading. Please wait.

Presentation is loading. Please wait.

Golden Lake TMDL Critique Mayank Gupta & Karla Bussen.

Similar presentations


Presentation on theme: "Golden Lake TMDL Critique Mayank Gupta & Karla Bussen."— Presentation transcript:

1 Golden Lake TMDL Critique Mayank Gupta & Karla Bussen

2 Golden Lake Description Shallow Lake o 57.2 acres; max depth=24 ft; mean depth= 8ft o 90% littoral (<15ft) Lakeshore is well developed Class 2B: supports aquatic and recreation uses o warm & cool fisheries, swimming, non-motorized boating Naturally brown tinted water due to tannin

3 Watershed Description West-central Portion of the Rice Creek Watershed District (RCWD) o Sub-watershed of Upper Mississippi Watershed Main tributary is Anoka County Ditch 53-62. 6,426 acres drain to lake through the ditch and 139 acres directly drain into the lake

4

5

6 303d: Impaired Water 1st listed in 2002 as an impaired water o Aquatic recreation standards not met due to excess nutrients/eutrophication Targeted start/completion years: 2004/2008 (September 30,2009) 5C – Impaired by one pollutant and no TMDL study plan is approved by EPA

7 Water Quality Standards ParameterGolden LakeStandard for Similar (Shallow) Lakes Total Phosphorous89 μg/L60 μg/L or less Chlorophyll-a47 μg/L20 μg/L or less Water Clarity1.1 meters [3.69 feet]1 meter [3.28 feet] or greater

8 Water Quality Standards

9

10

11 Curlyleaf Pondweed

12 Sources of Phosphorous 40% Watershed o MS4s o 14% failing septic systems 57% Internal Loading o anoxic conditions o physical disturbance (bottom- feeding fish and wind) o curlyleaf pondweed 3% atmosphere

13 Models and Methods Model used: BATHTUB

14 Margin of Safety

15 Pollution Reduction Plans Reductions designed to meet W.Q. standards from June-Sept. (growing season)

16 Implementation Plan Reduce total Phosphorous load in the watershed and improve in-lake water clarity.

17 How will this be achieved? Regulation o management rules Education o storm water article in city paper each month o full-time environmental education coordinator o Public Advisory Commitee Incentives o BMPs, shoreline restoration, native landscaping, lakeshore buffers


Download ppt "Golden Lake TMDL Critique Mayank Gupta & Karla Bussen."

Similar presentations


Ads by Google