Presentation is loading. Please wait.

Presentation is loading. Please wait.

DANVERS ELECTRIC DIVISION

Similar presentations


Presentation on theme: "DANVERS ELECTRIC DIVISION"— Presentation transcript:

1 DANVERS ELECTRIC DIVISION
Presented by: Hamid Jaffari, Director of Engineering and Operations

2 Overall Short -Term / Long -Term Planning Objectives
Long-term Reliability Goals: (0-25 years) Provide adequate substation capacity to support town load Provide redundancy for all substations Replace all open wires & bundled cables with Hendrix wires Short-term Reliability Goals: (0-10 years) Create engineering grade GIS System Utilizing GIS, develop short/long term design plans Provide proper protection and coordination of system protective devices (i.e. Relays, Reclosers, Interrupters, Fuses, etc) Back-up stranded loads (Folly Hill, Elliot street, Locust Street, Summer street) Upgrade substation underground getaways (Pond, Conant, Hylands, etc) Establish system wide power factor correction

3 23kV Supply Loop

4

5 Major Reliability Projects Completed
Year Project Cost 1996 4th Feeder 23 kV Construction $1,200,000 1997 Preliminary Reliability Design and Initial Development of GIS $850,000 1998 SCADA System $240,787 1999 North Street 23 kV Conversion $10,313 2000 S. Danvers Sub 42 & N Line Tap  $1,692,018 Summer Street 23 kV Conversion $343,526 2002 5th Feeder 23kV & 5kV $1,248,394 2003 Pond Street Substation Expansion $1,199,090 2005 Conant East & Elliott St. 23kV & 5kv  $1,000,155 GIS & SCADA Upgrade $102,000 2006/08 2007/2008 Cabot RD Substation Station 39 Construction $3,500,000 $70,000 TOTAL COSTS: $11,456,283

6 Other Reliability Projects Completed
Upgraded Underground Utilities ( ) Highland substation getaways Pond street substation getaways Conant street substation getaways Treetops underground distribution Schools underground services Retired antiquated substations ( ) Adams Street Burroughs Street Upgraded 5 kV circuit backbones ( ) Pickering street, Beaver Park, Summer street Worthington street Center street, Dayton Street, and West Street Pine Street Elliot Street Conant Street Liberty Street Burley St Foster St Cabot Rd RR R.O.W from Chestnut St to High School

7 Other Reliability Projects Completed
Upgraded secondary services & connections Balanced load on 23 kV & 4.16 kV feeders Installed 23 kV/4.16 kV step-down Xfmrs for stranded loads Seneca Dr/Lobao Dr/Strawberry Hill Lane Locust street beyond North Street Newbury Street extension Nike Site Elliot Street Folly Hill area Priston St Dayton Street Armory Rd Installed 23 kV ckts New 2355 Feeder form sub 42 to Cherry Hill Summer Street North Street Burley St Cabot Rd Constructed New 23 kV/ 4.16 Cabot Rd Substation

8 Reliability Programs - Finite
Open Wire/Bundled Cable Replacement Program: Replaced/Installed since Remaining: 5kV along 5th Feeder route miles 6.2 mi phase open wire mi Dayton/Green/Centre Streets 2.4 mi. Bundled cable mi Pine Street 1.5 mi. Total mi Pickering Ckt/Summer/North 3.8 mi 5 kV & 23 kV along Cabot & Burely-S3 CKT 2.4 mil 5 kV Cabot Rd to Chestnut St 0.7 mi 5 kV Cabot Rd to Cole Rd 0.6 mi 5 kV along Burley St-P m Total mi 23 kV/15 kV Padmount Switch Replacement Replaced in Replaced for Planned for 2008 Chili's Restaurant Electronics Ave Endicott St Rosewood Industrial Park Friday’s Restaurant Inspection of OH/UG Devices (Infrared Scanning) ongoing Substation OH Line Equipment

9 Reliability Programs - Finite
Radio Controlled Sectionalizing A) Benefits Reduces the duration of outages during restoration activities Features automatic sectionalizing Features time delay / line tag for safety How Many ? Installed kV ABB Reclosers Installed kV Gang Operated Air Break (GOAB) switches Installed 8-23 kV Capacitor Banks Where the new Reclosers will be installed? Poplar Street Electronics Ave Rt 1 South Collins Street RR tracks (2371 Line)

10 Reliability Programs - Continuous
Tree Trimming: 3 year cycle Substation Testing: ongoing TLM – Transformer Load Management: ongoing Pole Inspection: ongoing 1009 poles upgraded since 2000

11 Distribution Automation
Automatic Meter Reading (AMR/AMI) Automatic Power Restoral Scheme Automatic Power Factor Correction SCADA Control Outage Management System (OMS)

12 AMR Mesh Network A1800 ALPHA Meter/Collector Public WANs Level 5

13 Distribution Technology Integration
GIS SCADA Analysis Software Power Engineering

14 2008-2009 Capital Authorization Projects
Wood Electric $1,200,000 $2919,692 Cabot Rd $200,000 ___ AMR $2,500,000 $200,000 Plains Park Lighting $224,741 $230,000 Station 39 $60,000 ___ Conant Sub $70,000 ___ Spacer Installation $350,000 $300,000 Traffic Signals $200,000 $200,000 Storage Facility $150,000 $1,100,000

15 Automation: Station 39 Construction
Project Owner: Niles Tasks Completion Status Design % Equipment Bid Specification 100% Civil Construction % Equipment Installation & Testing 90%

16 Automation: Conant Sub Auto Transfer Scheme
Project Owner: Niles Tasks Completion Status Design % Equipment Bid Specification 100% Civil Construction Equipment Installation & Testing ----

17 Conant Sub Auto Transfer Scheme

18 Plains park lighting Project owner: Jay Tasks Completion Status Design % Equipment Bid Spec In-Progress Equipment Order July/August 2008 Construction March/April 2009

19 Major Reliability Projects 2008/2009
Year Project Cost 2008 Cabot Road Substation 100,000 Hylands Substation Reconstruction-Station 39 70,000 2008/09 #2 Burroughs Street Storage Reconfiguration 1,096,000 Wood Electric Substation Upgrade-Part 1 1,248,394 2009 Wood Electric Substation Upgrade-Part 2 2,940,000 Conant Sub Auto transfer Scheme 2008/2009 Sub 42 capacity Study TOTAL COSTS: $4,376,000

20 Town of Danvers Long-Range Planning

21 Cabot Road Substation New 9/12/ 15MVA Substation. Six (6) new 4.16 kV CKTs will enable Putnamville to be retired and provide substantial load relief to Conant Street Sub. SCADA Controlled Feeders allow remote switching from Engineering.

22

23 Cabot Rd Substation Site

24 Cabot Rd Substation

25 CABOT ROAD SUBSTATION

26 Typical R.R Tracks to Be Removed and Surface Restored

27 Cabot Rd Sub Load Transfer
CKT Date Yacht Club (Old Elliot) 12/1/2007 Woodvale II 6/1/2008 Woodvale I 6/9/2008 Putnamville 7/7/2008 Burley Street (Conant East) 7/28/2008 Putnamville Sub Demolition Starts 9/30/ 2008

28 Wood Electric Substation Project Time Line
Preliminary Design & Planning Start 1/ Finish 9/2007 Land research Survey Zoning/Permitting/Conservation Com 6/2008 Planning: Industrial Zone-No permit required Conservation Commission: State Highway: Design preparations Start 1/ Finish 6/2008 Design Bid preparation and award Design Finalization Equipment Specification preparation Equipment Bid preparation and award – Transformer and 15kV Switchgear Presentations 6/2008 Municipal Light Board DPW Director/Town Manager Abutters

29 Wood Electric Substation Construction Time Line
Tree Trimming 4/01/2008 Substation Construction Start 9/ Finish 12/2008 Phase 1 Transfer Load from 2420 line State hospital Load May 2008 Danvers Industrial Park June/July 2008 Phase 2 Preparation and Ground work September 2008 Phase 2 Transformer Installation May 2009 Phase 3 Switchgear Installation May 2009 Phase 4 Relay Testing June 2009 Phase 5 Functional Test July 2009

30 Wood Electric Substation Design

31 Wood Electric Substation Cost
Task Engineering & Design $150,000 Site Surveying $20,660 Soil Testing $1,369 Transformers $1,760,000 Switchgear $880,000 Other equipment $100,000 Groundwork & oil containment $400,000 Installation of Station $150,000 Installation of OH/UG facilities $370,000 Fence, grounding and landscaping $150,000 Misc. equipment, fencing, landscaping & tree trimming $70,000 $4,052,029

32 Customer Satisfaction -Reliability Indices
SAID – System wide outage duration Outages affecting major circuit backbones CAID – Customer average outage duration Outages affecting specific customers through lateral taps – localized storms, animal, and equipment failures SAIF – System wide outage frequency Number of outages experienced by system

33 Reliability Indices Industry Standard Measures from Y2000/2005
Customer Satisfaction and System Performance Acceptable Performance Sys Avg. Interrup Duration SAID = Cust hrs-out <1.2 (HRS) Cust served Cust Avg. Interrup Duration CAID = Cust hrs out <1.3 (HRS) Cust Interrupted System Avg. Interrup Freq SAIF = Cust interrupted < 1.12 (HRS)

34 Factors Influencing CAID - 2005
Number of localized storms & Lightning Degree of storm damage Sustained pockets of outages due to equipment failure Single customer outages Sub 42’s load tap changer paralleling scheme failure

35 Reliability Indices Note: Figures in red do not include major storms
NE Area Averages 2001 2002 2003 2004 2005 2006 2007 SAID (Hrs) <1.20 1.12 0.47 0.50 0.66 0.67 1.11 0.7 CAID <1.3 1.14 1.49 0.89 0.73 1.31 1.01 1.30 1.21 SAIF <1.12 0.98 0.31 0.53 0.69 0.83 .58 Note: Figures in red do not include major storms

36 Major Storms 6/21/2007 – 2365 Line – Lightning Strike on Purchase Street Damaged Insulators 7/28/2007 – 2420 Line– Lightning Strike on Route 1 Damaged Overhead Cable & Recloser 9/8/2007 – 2393 Line – Lightning Strike Tripped the Breaker at 20A Line Patrolled - Lightning Strike Suspected

37 Outage Causes

38 Breakdown of Equipment Failure 2007

39

40 Conclusion The Division received APPA’s RP3 Platinum Award (score of 98/100) on May 21, 2008 for its Reliability, Safety, and System Improvement programs. Electric Division has improved system performance since 1995 through employee commitments in positive work ethics, acceptance of new division procedures and policies, technical and customer service training, system ownership, increased productivity, and excellent design and maintenance standards. ITS GOOD TO BE MORE THAN YOU ARTURNED ON TURNED OFF! Narrative We continue to make great strides toward improved reliability. Again, it is important to understand that we are still in the early stages of the Big Picture. We will continue to work consistent with our new policy procedure and standards always respecting safety as #1. The key to customer satisfaction is system reliability. The Planning Studies addresses system reliability which begets Customer Satisfaction. Thank you

41 Thank You Questions?


Download ppt "DANVERS ELECTRIC DIVISION"