Presentation is loading. Please wait.

Presentation is loading. Please wait.

ICT for People’s empowerment

Similar presentations


Presentation on theme: "ICT for People’s empowerment"— Presentation transcript:

1 ICT for People’s empowerment
Orissa Experience Presented by – S. K. Lohani Director (Spl.Projects)

2 MG NREGS - ORISSA 2

3 ICT – Institutional Structure
e-Governance Resource Team at State level Headed by Director , Special Projects and Additional Secretary to Govt. Deputy Secretary (E-Gov), Technical Director, NIC, IT Specialists, Project Director, DRDA, Addl. Project Director, DRDA (Technical), Addl. Project Director(Finance), Assistant Project Director (MIS), Programme Officers, Block Development Officers, Civil Engineers 3

4

5 MG NREGA Online MIS Achievement
State Govt. have made mandatory online reporting since 1st January, 2008. Only online figures for physical and financial progress from the field is accepted by State. M.P.R. is generated from online MIS. Proactive disclosure of information to all stakeholders through 5

6 HARDWARE ICT infrastructure Zilla Panchayat Level (30 DRDAs)
4-5 Nos. of Computers, 3-5 Nos. of printers Intermediate Panchayat Level (314 Blocks) 3 Nos. of Computers, 2-3 Nos. of Printers Gram Panchayat level (6234 GPs) One Desktop/ Laptop with one printer have already been provided to each GP . 6

7 ICT Infrastructure SOFTWARE Zilla Panchayat Level (30 DRDAs)
WinXP, MS Office, Oracle 9i, D2K, SQL Server7, Visual Studio6. PAMIS, BETAN, PRIAsoft, Ruralsoft, NPP, NREGA online etc. Intermediate Panchayat Level (314 Blocks) WinXP, MS Office, Oracle9i, D2K Gram Panchayat level (6234 GPs) MS Office, PRIAsoft, Ruralsoft, NPP, NREGA online at Block N.B. : e-Despatch : All letters those are dispatched from PR Deptt is in real time posted on the website and sent through fax, simultaneously. e-Space for all Collectors, DRDAs, Blocks are created in PR website to download the latest instructions and guidelines. 7

8 ICT Infrastructure CONNECTIVITY Zilla Panchayat Level (30 DRDAs)
V-SAT, Broadband, Dialup DRS –TV Teleconferencing NIC Video Conferencing BSNL-VPN Broadband Intermediate Panchayat Level (314 Blocks) Other Available ISPs Gram Panchayat level (6234 GPs) DRS-TV Teleconferencing in KBK District GPs All GPs have been allowed to have internet connectivity from available ISPs. 8

9 Own Network ICT infrastructure
All the District Panchayats and Block Panchyats are connected through BSNL Broadband Virtual Private Network tunnel. Network Management Center at the State Hqrs. 9

10 ICT Infrastructure MANPOWER State Hqrs
NREGS Cell is functional with Specialists in their respective domain. Zilla Panchayat Level (30 DRDAs) Experienced IT professionals Young and energetic IT professionals – B.E./MCA Intermediate Panchayat Level (314 Blocks) Additional IT man power – DOEACC ‘O’level/DCA Trained non-IT professionals Gram Panchayat level (6234 GPs) Gam Rozgar Sevaks having working knowledge in IT or ‘O’level qualification. Rs.2000/- per GP has been allowed for content management of GP and uploading to websites. 10

11 Electronics Benefit Transfer (EBT)
MoU signed with SBI for implementation of Electronics Benefit Transfer (EBT) for payment of wages through Business Correspondent (BC) model. In the 1st phase 1000 GPs are operating through “Banking Outposts” at GP hqrs. of 3 Districts namely Ganjam, Gajapati and Mayurbhanj. Other 8 districts allowed to Union Bank of India. ICICI has proposed for another 3 districts.

12 EBT - Process BC appoints Customer Service Providers (CSPs) in each GP. Each CSP is provided with a Mobile phone –GPRS and a hand held device by BC. Each GP/CSP is attached to a Link Branch (Nearest Branch). The ID to the CSP is provided by the BC . The CSP does the enrolment of all MGNREGA beneficiaries in the GP with bio-metric devices and sign the account opening form (no frills account) Link Branch updates MGNREGS wage earner account by getting wage list from Block. CSP disburses the wages to the MGNREGS wage earners in “Banking Outpost” located in GP HQs. through Bio-metric authentication.

13 EBT Achievements so far
Target – 1000 GP CSP functional – 972 Disbursement started – 166 GPs No. of jobseekers enrolled – 7,16,160 No. of Accounts opened – 5,79,220 No. of transactions – 43,647 Total disbursement – Rs 4.01 Cr.

14 SanjogHelpline Grievance Redressal
Orissa Govt. have set up an Integrated Grievance Redressal System (IGRS) SanjogHelpline (Toll free no and ). It addresses the grievances of following schemes. MGNREGA PMGSY RWSS Can be customized for other schemes.

15 Public Grievance Redressal System – Sanjog Helpline
Registers complaints through Toll free number ( and ). Web portal ( Fax Letters Triggers complaints to BDO-cum-Programme Officer through SMS – Instantly Fax/ /e-Space – end of each day Escalates complaints to higher quarters in desired time intervals PD, DRDA -cum- Addl. DPC Collector & DM –cum- DPC, NREGA Director(Spl. Projects) and Addl. Secy to Govt., PR Deptt. 15

16

17 ICT Pilot Project - NReGA-pay (Use of Biometric Devices)
The Biometric device captures the work demand from the jobseekers who are issued with a dated receipt instantly. Work Allocation notice within 3 days, acknowledgement recorded in the same Biometric device. The Biometric device enabled with GPS records the attendance of the jobseeker along with longitude and latitude of the worksite. According to his attendance and measurement by the JE, the muster roll and wage list is prepared and transmitted to the concerned Post/ Bank branches, for payment of wage within 15 days. The above process works with synchronization with NREGASoft. The GP is provided with two nos. of Biometric devices enabled with GPS, one laptop enabled with GPRS web access and one small dot matrix printer.

18 ICT Pilot Project (Implementation of NREGA – use of Bimetric Devices )

19 National Rural Employment Guarantee Scheme
4/20/2017 National Rural Employment Guarantee Scheme NReGA-pay THE ARCHITECTURE OF THE PROJECT:

20 Process re-engineering
4/20/2017 PRESENT SITUATION Activities 3.Job allocation 4.Attendance/photo taken at work site 5.Measurement and check measurement 6.Pass for bill 7.Wage list generation 8.Wage disbursement 2.Job demand 1.Registration Process re-engineering Use of ICT National Rural IMPACT ANALYSIS Employment Guarantee Scheme Improved governance Non traceable 2 DAYS This process approximately takes days to give outcome 7 DAYS Misleading Inflated muster rolls Delayed payment Timely transfer of wages Authenticate attendance Properly recorded Systematic 15 to 20 days POST IMPLEMENTATION EFFECT

21 NReGA-pay – Output

22 NReGA-pay – Output (Worksite Linked to Google Map)

23 CONCLUSION: National Rural Employment Guarantee Scheme
4/20/2017 National Rural Employment Guarantee Scheme CONCLUSION: The successful implementation of this pilot project would help in Improving the overall efficiency of the scheme. Effective financial inclusion of all the citizens and automated electronic wage disbursement. Setting an example for the other State Governments for successful implementation of NREGA. Creating awareness amongst People at the grassroots level about the Government’s citizen centric approach.

24

25 Gram Panchayat Computerisation
All the GPs have already been supplied with Desktop, Laptop, Printer, MS Office package etc out of 12th Finance Commission Grants, The 13th Finance Commission have emphasized on maintenance of accounts, conducting audit in each GP, entering into prescribed accounting /- per month per GP has been provisioned. Out of this, /- per month for each G.P. for operation and maintenance of computers and other consumable peripherals shall be released directly to Gram Panchayats. A 20 seated digital database management system with LAN has been setup in all the 314 blocks out of 12th Finance Commission Grant. A sum of 20,000/- per year per block is being provided for maintenance of the above infrastructure out of the present grant.

26 THANK YOU


Download ppt "ICT for People’s empowerment"

Similar presentations


Ads by Google