Presentation is loading. Please wait.

Presentation is loading. Please wait.

Process Analysis 流程分析.

Similar presentations


Presentation on theme: "Process Analysis 流程分析."— Presentation transcript:

1 Process Analysis 流程分析

2 Fang Aihua Wuhan University
Process Analysis Process Analysis 流程分析 Process Flowcharting 流程图的绘制方法 Types of Processes 流程类型 Process Performance Metrics 流程绩效评 价 Fang Aihua Wuhan University 2

3 Process Analysis Terms 基本术语
Process: Is any part of an organization that takes inputs and transforms them into outputs. Cycle Time: Is the average successive time between completions of successive units. Utilization: Is the ratio of the time that a resource is actually activated relative to the time that it is available for use. 流程/步骤 节拍/周期 时间利用率 Fang Aihua Wuhan University 4

4 Other Process Terminology
Bottleneck Occurs when the limited capacity of a process causes work to pile up or become unevenly distributed in the flow of a process If an employee works too slow in a multi-stage process, work will begin to pile up in front of that employee. In this case, the employee represents the limited capacity causing the bottleneck. Pacing Refers to the fixed timing of the movement of items through the process 瓶颈 节拍(?) / 定时 4

5 Process Flowcharting 流程图的绘制方法
Process flowcharting is the use of a diagram to present the major elements of a process. The basic elements can include tasks or operations, flows of materials or customers, decision points, and storage areas or queues. It is an ideal methodology by which to begin analyzing a process. Fang Aihua Wuhan University 4

6 Flowchart Symbols 流程图符号
Tasks or operations 任务或操作 Examples: Giving an admission ticket to a customer, installing a engine in a car, etc. Examples: How much change should be given to a customer, which wrench should be used, etc. Decision Points 决策点 Fang Aihua Wuhan University 4

7 Flowchart Symbols (Continued)
Storage areas or queues 库存或排队 Examples: Sheds, lines of people waiting for a service, etc. Examples: Customers moving to the a seat, mechanic getting a tool, etc. Flows of materials or customers 物流或顾客流动 Fang Aihua Wuhan University 4

8 Example: Flowchart of Student Going to School
Yes Go to school today? Drive to school Walk to class No Goof off Fang Aihua Wuhan University 4

9 Multistage Process 多阶段的流程
Fang Aihua Wuhan University 4

10 Multistage Process with Buffer 具有库存的多阶段流程
缓冲器 Stage 1 Stage 2 Starving Blocking Bottleneck Fang Aihua Wuhan University 4

11 Fang Aihua Wuhan University
A buffer refers to a storage area between stages where the output of a stage is placed prior to being used in a downstream stage Blocking Occurs when the activities in a stage must stop because there is no place to deposit the item just completed If there is no room for an employee to place a unit of work down, the employee will hold on to it and not able to continue working on the next unit Starving Occurs when the activities in a stage must stop because there is no work If an employee is waiting at a work station and no work is coming to the employee to process, the employee will remain idle until the next unit of work comes Fang Aihua Wuhan University

12 Types of Processes 流程类型
Conversion Fabrication Assembly Testing 转化(如:冶炼) 制造(如:机械切削) 装配 测试 11 11

13 Types of Processes 流程类型
Make-to-order 为订单生产(MTO) Only activated in response to an actual order. Both work-in-process and finished goods inventory kept to a minimum. Make-to-stock 为库存生产(MTS/MTI) Process activated to meet expected or forecast demand. Customer orders are served from target stocking level. Hybrid processes 混合 combine the features of both MTO and MTS. Fang Aihua Wuhan University 4

14 Process Flow Structures 工艺流程结构
A process flow structure refers to how a factory organizes material flow using one or more processes technologies. Robert Habert Hayes(贺氏) and Steven Wheetwright(威尔莱特). Restoring out competitive edge:competing through manufacturing(New York: John Wiley & Sons ). P209.. 12 12

15 Process Flow Structures Hayes & Wheelwright 贺氏/威尔莱特
Job shop Batch Assembly Line Continuous Flow 单件小批量生产 / 工艺专业化(宋国防译) 批量生产 装配线生产(大量) 连续流程生产(大量) 12 12

16 Fang Aihua Wuhan University
生产类型的划分 (按生产的连续程度) 连续型:炼油厂24小时 重复型: 汽车流水线(零配件) 间断型:(零活混杂型 、 单项工程) Fang Aihua Wuhan University

17 生产类型的划分-I (按产品品种和数量的需求)
大量大批生产 批量生产 单件小批量生产 Fang Aihua Wuhan University

18 生产类型的划分-II (按产品品种和数量的需求)
大量连续生产 订货间断生产系统 单项工程 Fang Aihua Wuhan University

19 Process Performance Metrics 流程绩效评价 (基本时间)
Operation time = Setup time + Run time 运营时间 调整时间 作业时间 Throughput time = Average time for a unit to 全过程生产周期 move through the system Cycle time = Average time between 节拍 completion of units Fang Aihua Wuhan University 17

20 Process Performance Metrics (Continued)
Throughput rate = Cycle time The output rate that the process is expected to produce during a period time Process Velocity = Throughput time (throughput ratio) Value-added time 产出率(生产速度) 工艺周转率 (任建标译) Fang Aihua Wuhan University 17

21 Process Performance Metrics (Continued)
Efficiency = Actual output Standard Output Productivity = Output Input Utilization = Time Activated Time Available 生产效率 生产力 时间利用率 Fang Aihua Wuhan University 17

22 Fang Aihua Wuhan University
Cycle Time Example Suppose you had to produce 600 units in 80 hours to meet the demand requirements of a product. What is the cycle time to meet this demand requirement? Answer: There are 4,800 minutes (60 minutes/hour x 80 hours) in 80 hours. So the average time between completions would have to be: Cycle time = 4,800/600 units = 8 minutes. Fang Aihua Wuhan University 17

23 Process Throughput Time Reduction 降低生产周期的方法
Perform activities in parallel. 平行作业 Change the sequence of activities. 变换次序 Reduce interruptions. 减少停顿 20

24 Fang Aihua Wuhan University
Little’s Law 利特法则 Throughput time=WIP/Throughput rate 总生产周期=在制品数量/生产速度 Fang Aihua Wuhan University

25 补充术语 LT (Lead time) WIP (work-in-process) Lot size / batch size 提前期
MLT: manufacturing lead time WIP (work-in-process) Lot size / batch size 提前期 在制品 批量


Download ppt "Process Analysis 流程分析."

Similar presentations


Ads by Google