“National Company “KazMunayGas”: “Kazakhstan as the Main Driver of Oil Production Growth in Eurasia: Key Projects, Prospects And Challenges” Astana, October.

Similar presentations


Presentation on theme: "“National Company “KazMunayGas”: “Kazakhstan as the Main Driver of Oil Production Growth in Eurasia: Key Projects, Prospects And Challenges” Astana, October."— Presentation transcript:

1 “National Company “KazMunayGas”: “Kazakhstan as the Main Driver of Oil Production Growth in Eurasia: Key Projects, Prospects And Challenges” Astana, October 2, 2012

2 Energy Market Situation
The relationship between world economic condition and oil prices* Source: International Monetary Fund, International Energy Agency, Citi Research Growth in oil demand Growth in world GDP in % Positive dynamics IEA forecast for 2012 After the economic shocks Indicators of different years Source: BP Energy Outlook 2030 Approximation of energy intensity and a share of dominant types of fuel up to 2030 (forecast) Energy intensity Shares of dominant types of fuel Tons per thousand USD dollars China USA Rest of the world India Oil Coal Gas Water sources Nuclear power Renewables * If oil prices remain relatively stable and the world economic growth makes up 2%, then the hydrocarbon demand will have linear correlation with world GDP. 1

3 Development Strategy until 2020
The Republic of Kazakhstan: Key-takeaways, New Challenges and Development Goals Development Strategy until 2020 GDP growth – no less than 30% National Fund’s assets – no less than 30% of GDP Share of the small and medium enterprises in the GDP - 40% Growth of investments in non-resource sector of the economy - 30% Population mln. people Life expectancy – over 72 year growth against the proceeding year; GDP in billion US dollars Foreign Direct Investments (mln.US dollars) 2

4 Oil and Gas Industry of the Republic of Kazakhstan
World proved crude oil reserves, bln.barrels Kazakhstan holds 9th place in the world with regard to the proved oil reserves, with the 39,8 bln. barrels of oil Kazakhstan is the 2nd largest oil producer among the CIS countries Natural gas reserves make up 3 trln.cub.m , which is 1% of world’s gas reserves. Oil production in Kazakhstan is 1.76 mln.bbl/day or about 80 bln.tons Gas production in Kazakhstan makes up 25 bln.cub.m. Oil production is expected to Increase by 60% by 2020 Caspian Sea Shelf Projects should become the main driver of oil production growth in Kazakhstan By 2035 the Caspian Sea region will provide about 9% of the world crude oil demand Annual crude oil production in Kazakhstan, mln. tons (with forecast to 2020) 72bln. US dollars Investments in oil and gas sector 21% of oil sector in Kazakhstan’s GDP 3

5 Layout of oil pipelines
JSC NC "KazMunayGas" in Kazakhstan's Oil-and-Gas Sector KazMunayGas is Kazakhstan's national operator for exploration, production, refining and transportation of hydrocarbons, representing the state in Kazakhstan's oil-and-gas sector. 100 percent of the company's shares are owned by the SWF “Samruk-Kazyna” JSC. Key figures Share on the RoK's market, % Production of crude oil and gas condensate 21,1 mln. tons 26,4 % Gas production 4,9 bln. m3 13,1 % Oil refining 15,3 mln. tons 83,2 % Pipeline oil transportation 66,9 mln. tons 77,1 % Pipeline natural gas transportation 110,6 bln. m3 95,7 % Layout of oil pipelines Layout of gas pipelines Central Asia - Centre Bukhara - Ural Orenburg - Novopskov BGR - Almaty Kazakhstan-China 4

6 The Development Strategy of KazMunayGas
1 Oil and gas exploration and production Growth of hydrocarbon reserves and crude oil and gas production 2 Oil transportation Diversification of oil export routes, integration of oil transportation systems and ensuring a stable transportation 3 Oil refining & Oil and oil products marketing Oil refining technological development, ensuring domestic market and development of petro chemistry 4 Service and innovative technological sector Creation of competitive services, achieving the level of world oil and gas companies 5 Gas transportation and marketing Development of Kazakhstan gas market, transit potential and satisfaction of the domestic market requirements 6 Managerial improvement Financial sustainability and debt management, development and improvement of corporate governance, formation of target capital structure, implementation of personnel policy and enhancing social activity 5

7 Strategic Targets of JSC NC “KazMunayGas” for 2022
Description Unit Plan for 2012 2015 2022 (Long-term strategy) Growth 2022/2012, ( %) Oil and gas condensate reserves mln. tons 779,0 817,0 1 413 1,8 times Volume of oil and gas condensate 21,9 24,0 35,4 1,6 times Volume of oil refining and gas condensate 16,4 19,0 115,9 ROACE % 9,3 > 10 >15 by 5,7 percentage point EBITDA margin 13,3 > 16 > 18 by 4,7 percentage point 6

8 Short-term plan of geological exploration (2012-2015)
Geological Exploration Performance Short-term plan of geological exploration ( ) 556 bln. KZT Geological exploration costs Total costs for geological exploration during – 2016 will make up 556 bln. KZT 4 650 lin. km 2D Seismic survey 2D seismic survey to the extent of lin. km is scheduled to be held for identifying new structures km2 3D Seismic survey 3D seismic survey to the extent of sq.km is scheduled to be held for specifying the composition of the identified structures 435 wells Prospecting and exploratory drilling  435 exploration and appraisal wells are planned to be drilled From 2015 the consolidated increment in raw hydrocarbons reserves of KMG will be ensured through geological exploration. 7

9 Exploration and Production Innovation Policy
Improving the efficiency of geological exploration (muiltifocusing, digital geological modeling) Increment in the consolidated residual recoverable oil reserves by more than twice through geological exploration based on innovative technologies by 2022 Improvement of development efficiency of the fields with depleted deposit and challenged reserves in order to increase the oil recovery factor. Ground tests in natural field conditions Development and transfer of innovative technologies Large-scale introduction of innovation on a turnkey basis in existing fields Laboratory test 15 low-margin deposits of JSC KMG E&P, remaining recoverable reserves 6570 thousand tons ADVANCED TECHNOLOGIES Nonsteady (cyclic) waterflooding with reverse filtration flow Polymer-gel system injection Alternating injection of oil and water Sidetracking Horizontal wells and horizontally branched wells Innovative effect Production tests of research and technology and development activities by Kazakh scientists and teams in the field, testing of new domestic equipment and technologies Introduction and experience of application of the new technologies by world service companies Introduction of new technologies in the existing fields 8

10 Kazakhstan Sector of Caspian Sea North-Caspian Project
Geological Prospecting Projects of JSC NC “KazMunayGas” Kazakhstan Sector of Caspian Sea Onshore Zhambay (50%) North-Caspian Project (16,81%) - 1 2 3 4 5 6 7 Zhambyl (73%) Satpayev (75%) Kurmangazy (50%) Zhemchujiny (25%) Жамбыл Khvalynskoye (25%) Project N (51%) (50%) Tsentralnaya (50%) 1 - Liman 2 - Uzen-Karamandybys 3 - Karaton-Sarkamys 4 - R-9 5 - Taysogan 6 - Teresken 7 -Temir Центральная 9

11 Diversification of Oil Transportation Routes
Over 20 years of independence of the Republic of Kazakhstan: volume of oil export increased from 13 to 71 mln.tons annually approximately km of oil pipelines constructed pipeline export capacities increased from 10 to 58 mln.tons annually | “Caspian Oil Pipeline” Pipeline Consortium In April 1996 Agreement between Kazakhstan, Russia, Oman and International Oil Consortium on construction of CPC Pipeline was concluded. Oil pipeline length:1510 km Commissioned: 2001 July – commencement of construction works on the CPC Expansion Project (up to 67 mln.tons of which 52,5 mln.tons of oil from the Republic of Kazakhstan) Existing routes Planned routes Kazakhstan-China Oil Pipeline Implementation of the Kazakhstan-China Oil Pipeline Expansion Project (Stage II) will allow increasing the output capacity up to 20 mln.tn of oil a year. Oil transportation, mln.tn CPC Oil Pipeline ,2 “Atyrau-Samara” Oil Pipeline 15,4 Kazakhstan-China Oil Pipeline 10,9 Kazakhstan Caspian Transportation System Project The need in the KCTS export capacities will arise by the moment Phase II of the Kashagan field development is implemented 10

12 Gas-main Pipelines of Kazakhstan
Russian Federation Uzbekistan Kyrgyzstan Turkmenistan China 11

13 Reconstruction and Modernization of Refineries in Kazakhstan
Implementation of the State Program on Industrial and Innovative Development Enforcement and the Program on Development of the Petroleum Industry in the Republic of Kazakhstan for will allow: increasing an average integrity index of the Kazakhstan refineries up to 10,2 global rate increasing the depth of oil refining up to 89% enhancing the quality of motor fuels to Euro-4,5 standards Investment projects: “Construction of Aromatic Hydrocarbon Production Complex at Atyrau Refinery” “Construction of Deep Oil Processing Complex at Atyrau Refinery” “Reconstruction and Modernization of Pavlodar Refinery” “Reconstruction and Modernization of PKOP Refinery (Shymkent Refinery) «Road Bitumen Production at Aktau Plastic Mass Plant” Expected Results: thou,.tons Description Fact 2011 After reconstruction 2016 Deviation (+/-) % Oil refining 13 724 19 000 + 38 Gasoline 2 764 6 774 2,5 times Jet fuel 388 957 + 569 Diesel fuel 4 093 5 875 +1 782 + 44 Mazut 3 403 1 484 57 Refining depth 67% 89% + 22 Quality of oil products Euro - 2 Euro – 4,5 12

14 Kazakh Content (КС) KC in procurement activities of KMG Group for the year 2011 KC in major petroleum projects for the year 2011 Total volume of procurement Kazakh content 80% Total procurement level Kazakhstani content (USD mln.) 37% 62% 20% 63% 38% поменять цифры по всем компаниям Import Kazakh Content Total, GWS Goods Works Services 13

15 Service Sector- Investment Projects
Construction of the North-Caspian Environmental Response Base (NCERB) Purpose: to ensure oil spill response in case of Level 1 and 2, delivery of assistance in case of emergency situation, evacuation and rescue of people, deployment of equipment in case of Level 3 oil spill Deadline: 2012 Cost: 12,6 bln.tenge Location: Damba settlement, Atyrau oblast Status: NCERB is under construction. Месторождение Кашаган р.Урал СКЭБР Shipyard/dry dock construction Purpose: development of the shipbuilding industry in the Republic of Kazakhstan Deadline: 2013 – 2016 Cost: mln.tenge Location: Kuryk settlement, Mangistau oblast Status: feasibility study package produced, state expert review is carried out Gas turbine station construction Purpose: liquidation of energy emergency in the West –Kazakhstan oblast, security of RK energy supply Deadline : (Phase 1); (Phase 2) Cost: mln.tenge Location: West-Kazakhstan oblast Status: feasibility study package produced, state expert review is carried out 14

16 Service Sector – Innovative Cluster
Research study and development Experimental-industrial Studies Industrial Engineering Promotion of finished commodity to the market JSC “KBTU": Institute of Chemical Sciences named after Bekturov A.B. Institute of Organic Catalysis and Electrochemistry named after Sokolsky D.V. JSC “Kazakh Institute of Oil and Gas”: Research-and-Development Center in the “Information Technology Park” SEZ Polygon based on low-profit oil fields of JSC “Exploration and Production “KazMunayGas” Special Laboratory JSC “Kazakh Institute of Oil and Gas” in the “Information Technology Park” SEZ Incorporation in full-scale production at domestic enterprises Major petroleum projects: TCO, KPO, NCP etc. Export Полигон СЗМС Innovative projects on the territory of the “Information Technology Park” SEZ Завод по ремонту малых судов Creation of a showpiece complex using the latest results in the sphere of innovative technologies. Development of domestic research-and-development as well as design and experimental in the petroleum industry Researches and developments in the sphere of high-performance computing, automation, production processes, IT software application for petroleum and other fields Источники информации: 1. Программа по развитию нефтегазового сектора в РК на годы, утвержденная постановлением Правительства РК от 18 октября 2010 г. №1072. 2. АО «Информационно-аналитический центр» при Министерстве нефти и газа Республики Казахстан. Завод буровых растворов Implemented by: Students: 2000 ITP SEZ KIOG Research and Development Center KBTU Institute of Information Technologies KBTU Petroleum Engineering Institute 15

17 JSC “National Company “KazMunayGas”
JSC “National Company “KazMunayGas” The Republic of Kazakhstan, , Astana, Kabanbai-batyr str., 22 tel.: +7 (7172) fax: +7 (7172) , 16


Download ppt "“National Company “KazMunayGas”: “Kazakhstan as the Main Driver of Oil Production Growth in Eurasia: Key Projects, Prospects And Challenges” Astana, October."

Similar presentations


Ads by Google