Presentation is loading. Please wait.

Presentation is loading. Please wait.

Kentuckians for Better Transportation Road Fund Update Tammy S. Branham January 21, 2010.

Similar presentations


Presentation on theme: "Kentuckians for Better Transportation Road Fund Update Tammy S. Branham January 21, 2010."— Presentation transcript:

1 Kentuckians for Better Transportation Road Fund Update Tammy S. Branham January 21, 2010

2 Financial Overview I.The year in review. II.Where are we? III.What does the future hold?

3 Motor Fuels Motor Vehicle Usage Other TOTAL Change (20.9) (71.7) (12.1) (104.7) (In Millions) Revised $1,220.1 Road Fund Estimated Reduction – FY 2009 $ 640.5 340.2 239.4 Original $1,324.8 $ 661.4 411.9 251.5 * Revised CFG Estimate equates to an 8% drop from original estimate *

4 Motor Fuels Motor Vehicle Usage Other TOTAL Change $ (38.9) (75.6) (18.3) $(132.8) (In Millions) Actual $1,192.0 FY 2009 - Road Fund Actual Revenues $ 622.5 336.3 233.2 Original * 10% drop from original estimate * $1,324.8 $ 661.4 411.9 251.5

5 Motor Fuels Motor Vehicle Usage Other TOTAL Change * $ (94.7) (137.0) (32.3) $ (264.0) (In Millions) Revised 629.7 $ 1,141.1 FY 2010 - Road Fund Revenue Revision $ 288.3 223.1 Original $1,405.1 $ 724.4 425.3 255.4 *18.8% drop from official estimate

6 2009 GA Authorization of $400M Economic Development bonds AWP of Motor Fuels frozen at new floor of $1.786 Received Federal Stimulus funding - $421.1M for Highway Infrastructure Investment and $51.5M for Capital Transit The Year In Review Cont’d KYTC/obfm

7 Road Fund cash position deteriorated Unable to fund new State Construction project starts ($8.9M net authorizations calendar 2008 and 2009) The Year In Review Cont’d KYTC/obfm

8 Where Are We Now?

9 KENTUCKY GASOLINE TAX Gasoline Tax Rate MF User Tax USTTOTAL KRS 138.220(1) KRS 138.220(2) KRS 224.60 (awp * 9%) FY07 $1.476 x 9% = 13.3¢ 5¢ 1.4¢ 19.7¢ FY08 $1.624 x 9% = 14.6¢ 5¢ 1.4¢ 21.0¢ FY09 $1.786 x 9% = 16.1¢ (new floor) 5¢ 1.4¢ 22.5¢ FY10 $1.786 x 9% = 16.1¢ 5¢ 1.4¢ 22.5¢ FY10 $1.864 x 9% = 16.8¢ 5¢ 1.4¢ 23.2¢ FY10* $1.965 x 9% = 17.7¢ 5¢ 1.4¢ 24.1¢ FY11 $2.162 x 9% = 19.4¢ 5¢ 1.4¢ 25.8¢ *and 4 th Qtr Estimate FY11 Maximum Increase: (July – Sept) (Oct - Dec) (Jan - June)

10 Motor Fuels Motor Vehicle Usage Other TOTAL Change * $ 25.9 40.4 (8.2) $ 58.1 (In Millions) Revised 655.6 $ 1,199.1 FY 2010 - Road Fund Revenue Revision $ 328.6 214.9 Current $ 1,141.0 $ 629.7 288.3 223.1

11 CFG December 2009 Estimates for FY11 and FY12 increased: FY11 +$69.3M at $1,270.6M (6.0% growth over FY10) FY12 +$87.3M at $1,340.9M (5.5% growth over FY11) Preparing to sell $100M in GARVEE bonds for LSIORB Project Where Are We Now? (Cont’d)

12 Continue operating a Federal Highway Construction Program without a new authorization SAFETEA-LU expired September 30, 2009 Operating under second extension Extension expires Feb 28, 2010 Beginning to see increases in the net Road Fund cash projections for the coming 32 months Anticipate an increase in Revenue Sharing Programs - shared with local governments $12.1M in FY11 and $15.3M in FY12 Where Are We Now? (Cont’d)

13 New Biennial Budget $300M Economic Development bond authorization $112M BRAC bond authorization Potential for NEW state funded highway construction projects in mid to late FY2012 What Does the Future Hold?

14 Federal-Aid Highway Infrastructure Authorization (We hope!) Second Federal Stimulus package? House passed Jobs Bill that funds highway projects at approximately the same level as Stimulus 1. Senate to take up the measure very soon. Still many unknowns for us to deal with, but we find many positive possibilities on the horizon What Does the Future Hold?

15 Kentuckians for Better Transportation Road Fund Update Tammy S. Branham January 21, 2010


Download ppt "Kentuckians for Better Transportation Road Fund Update Tammy S. Branham January 21, 2010."

Similar presentations


Ads by Google