Presentation is loading. Please wait.

Presentation is loading. Please wait.

Adoption of the 2010 California Codes A brief look at what’s ahead Presented by: Stuart Tom LA Basin Chapter/ICC.

Similar presentations


Presentation on theme: "Adoption of the 2010 California Codes A brief look at what’s ahead Presented by: Stuart Tom LA Basin Chapter/ICC."— Presentation transcript:

1 Adoption of the 2010 California Codes A brief look at what’s ahead Presented by: Stuart Tom LA Basin Chapter/ICC

2 … Didn’t we just adopt a new code ??? Yes, but we love the code adoption process. Yes, but we love the code adoption process.

3 … Didn’t we just adopt a new code ??? Yes, but we love the code adoption process. Yes, but we love the code adoption process. We get to purchase new codesWe get to purchase new codes

4 … Didn’t we just adopt a new code ??? Yes, but we love the code adoption process. Yes, but we love the code adoption process. We get to purchase new codesWe get to purchase new codes We get to hold public hearingsWe get to hold public hearings

5 … Didn’t we just adopt a new code ??? Yes, but we love the code adoption process. Yes, but we love the code adoption process. We get to purchase new codesWe get to purchase new codes We get to hold public hearingsWe get to hold public hearings We get to practice cut & paste; strikeout & underline; renumbering sectionsWe get to practice cut & paste; strikeout & underline; renumbering sections

6 … Didn’t we just adopt a new code ??? Yes, but we love the code adoption process. Yes, but we love the code adoption process. We get to purchase new codesWe get to purchase new codes We get to hold public hearingsWe get to hold public hearings We get to practice cut & paste; strikeout & underline; renumbering sectionsWe get to practice cut & paste; strikeout & underline; renumbering sections We get to make up reasons why climate, topography and geology are so importantWe get to make up reasons why climate, topography and geology are so important

7 … Didn’t we just adopt a new code ??? Yes, but we love the code adoption process. Yes, but we love the code adoption process. We get to purchase new codesWe get to purchase new codes We get to hold public hearingsWe get to hold public hearings We get to practice cut & paste; strikeout & underline; renumbering sectionsWe get to practice cut & paste; strikeout & underline; renumbering sections We get to make up reasons why climate, topography and geology are so importantWe get to make up reasons why climate, topography and geology are so important Now we’ll even get a chance to make up reasons why one shade of green is better than another shade of greenNow we’ll even get a chance to make up reasons why one shade of green is better than another shade of green

8 HSC 17958.5 & HSC 18941.5 Local jurisdictions may amend building standards to be more restrictive than Title-24, if such amendments are justified on the basis of a local geologic, topographic or climatic condition. Local jurisdictions may amend building standards to be more restrictive than Title-24, if such amendments are justified on the basis of a local geologic, topographic or climatic condition. AB 210 (Hayashi) recently added green building standards to the regulations that may be amended by a local jurisdiction pursuant to both HSC 17958.5 & HSC 18941.5. AB 210 (Hayashi) recently added green building standards to the regulations that may be amended by a local jurisdiction pursuant to both HSC 17958.5 & HSC 18941.5.

9 Local Amendments Justification for a local amendment may be used repeatedly. Justification for a local amendment may be used repeatedly. The use of a “Justification Matrix” is acceptable. The use of a “Justification Matrix” is acceptable. A local condition does not need to be unique to your jurisdiction. A local condition does not need to be unique to your jurisdiction. Amendments and justifications must be adopted by the governing body after a properly noticed public hearing. Amendments and justifications must be adopted by the governing body after a properly noticed public hearing. Local amendments may not reduce a building standard below the model state code requirement. Local amendments may not reduce a building standard below the model state code requirement. Local amendments and justifications must be filed with the California Building Standards Commission (CBSC). Local amendments and justifications must be filed with the California Building Standards Commission (CBSC). Building Standards Commission 2525 Natomas Park Drive, Suite 130 Sacramento, CA 95833Building Standards Commission 2525 Natomas Park Drive, Suite 130 Sacramento, CA 95833 Attention: Tom Morrison Local amendments do not take effect until such amendments and justifications are filed with the CBSC. Local amendments do not take effect until such amendments and justifications are filed with the CBSC. CBSC does not review, approve or reject local amendments and/or justifications. CBSC does not review, approve or reject local amendments and/or justifications.

10 Timeline

11 How much time do we REALLY have? a) 278b) 192c) 134d) 94

12 So what does this mean??? Each city throughout California enforces a slightly different version of the same code. Each city throughout California enforces a slightly different version of the same code. Each city amends its code every three years. Each city amends its code every three years. Sometimes the triennial adoption of new code results in substantial changes. Sometimes the triennial adoption of new code results in substantial changes. Most changes fall into these categories: Most changes fall into these categories: Energy Conservation/Green Building StandardsEnergy Conservation/Green Building Standards Disabled Access RegulationsDisabled Access Regulations Structural Design StandardsStructural Design Standards Fire SafetyFire Safety

13 So Which Codes …??? 2010 California Codes 2010 California Codes 2009 International Building Code2009 International Building Code 2009 International Residential Code2009 International Residential Code 2009 International Fire Code2009 International Fire Code 2009 Uniform Mechanical Code2009 Uniform Mechanical Code 2009 Uniform Plumbing Code2009 Uniform Plumbing Code 2008 National Electric Code2008 National Electric Code

14 State Agency Amendments Which state agencies will affect me the most?? Which state agencies will affect me the most?? HCD-1HCD-1 HCD-2HCD-2 SFMSFM DSA/ACDSA/AC OSHPD3OSHPD3

15 State Agency Amendments Which state agencies will affect me the most?? Which state agencies will affect me the most?? HCD-1 (Hotel, Apartment, Condo, SFD)HCD-1 (Hotel, Apartment, Condo, SFD) HCD-2 (Mobilehome Parks)HCD-2 (Mobilehome Parks) SFM (A,E,I,H,L,R, High-Rise, other)SFM (A,E,I,H,L,R, High-Rise, other) DSA/AC (Disabled Access)DSA/AC (Disabled Access) OSHPD3 (Licensed Clinic & Outpatient Svc)OSHPD3 (Licensed Clinic & Outpatient Svc)

16 Key areas PEX PEX Gray Water Gray Water Green Building Standards Green Building Standards Fire Safety Fire Safety Wildland Urban Interface (WUI) Wildland Urban Interface (WUI) IRC IRC Disabled Access Disabled Access Energy Conservation Energy Conservation

17 PEX January 22, 2009 January 22, 2009 CBSC approved PEX for statewide use.CBSC approved PEX for statewide use. Effective Date – August 1, 2009Effective Date – August 1, 2009 December 30, 2009 December 30, 2009 Alameda County Superior Court overturned approval of PEX by rejecting the EIR on the basis that it failed to:Alameda County Superior Court overturned approval of PEX by rejecting the EIR on the basis that it failed to: Evaluate cancer and other health risks from chemicals leaching from PEX; Evaluate cancer and other health risks from chemicals leaching from PEX; Evaluate drinking water taste and odor impacts; Evaluate drinking water taste and odor impacts; Evaluate the risk of premature failure of PEX in certain applications. Evaluate the risk of premature failure of PEX in certain applications. Requires preparation of a new EIRRequires preparation of a new EIR BSC website still indicates that PEX is allowed for state-wide application. BSC website still indicates that PEX is allowed for state-wide application. So what’s the bottom line?? So what’s the bottom line??

18 Gray Water “Single-Fixture” gray water systems eliminated from the code. “Single-Fixture” gray water systems eliminated from the code. “Clothes Washer” gray water systems may be installed without a construction permit if no cutting of existing plumbing piping is necessary. “Clothes Washer” gray water systems may be installed without a construction permit if no cutting of existing plumbing piping is necessary. 12 conditions to ensure public safety12 conditions to ensure public safety Discharge to be contained on-site & may not pool Discharge to be contained on-site & may not pool Min. 2” cover of mulch/rock/soil or solid shield Min. 2” cover of mulch/rock/soil or solid shield “Simple” and “Complex” gray water systems both require construction permits. “Simple” and “Complex” gray water systems both require construction permits. Strict conditions applyStrict conditions apply Most jurisdictions support the use of gray water. Most jurisdictions support the use of gray water.

19 Green Building Standards Title 24 C.C.R. – Part 11 Title 24 C.C.R. – Part 11 2008 California Green Building Code 2008 California Green Building Code Effective Date: August 1, 2009Effective Date: August 1, 2009 Almost entirely voluntary.Almost entirely voluntary. 7 mandatory requirements that were essentially required through various other code provisions.7 mandatory requirements that were essentially required through various other code provisions. Not significant in terms of establishing new mandatory minimum standards.Not significant in terms of establishing new mandatory minimum standards. But it was a starting point.But it was a starting point.

20 Code vs. Rating System What is the difference between a “code” and a “rating system”? What is the difference between a “code” and a “rating system”? Why are both codes and rating systems important? Why are both codes and rating systems important? What are the implications of various Green Construction codes/rating systems on your jurisdiction? What are the implications of various Green Construction codes/rating systems on your jurisdiction? Who will be responsible for verifying compliance? Who will be responsible for verifying compliance? How will jurisdictions pay for additional staff and/or training to evaluate compliance? How will jurisdictions pay for additional staff and/or training to evaluate compliance? LEEDLEED LEED-IntentLEED-Intent Green-Point RatedGreen-Point Rated Local ProgramsLocal Programs

21 Green Building Standards “Cal-Green” Code “Cal-Green” Code Minimum Mandatory StandardsMinimum Mandatory Standards Tier 1Tier 1 Tier 2Tier 2 Significantly more robust than 2008 standard. Significantly more robust than 2008 standard. Part of a comprehensive program to establish state-wide green building standards: Part of a comprehensive program to establish state-wide green building standards: State-wide consistencyState-wide consistency Continuous, incremental improvementContinuous, incremental improvement Subject to 9-point criteriaSubject to 9-point criteria Intent to “migrate” many green standards into appropriate other portions of Title-24Intent to “migrate” many green standards into appropriate other portions of Title-24 May be amended locally if reasonably necessary as a result of a local geologic, topographic or climatic condition.May be amended locally if reasonably necessary as a result of a local geologic, topographic or climatic condition.

22 Fire Safety Residential Fire Sprinklers (R313) Residential Fire Sprinklers (R313) Required in every dwelling unit, including SFDsRequired in every dwelling unit, including SFDs NFPA 13D (P2904)NFPA 13D (P2904) Not required in unoccupied concealed spaces, unless such space includes fuel-fired equipment.Not required in unoccupied concealed spaces, unless such space includes fuel-fired equipment. Not required in bathrooms up to 55 sqftNot required in bathrooms up to 55 sqft Not required in closets/pantries up to 24sqft, provided smallest dimension is limited to 3’0” and walls & ceiling protected by gypsum board.Not required in closets/pantries up to 24sqft, provided smallest dimension is limited to 3’0” and walls & ceiling protected by gypsum board. Not required in detached garages, carports or exterior porches that do not have habitable space above. (R309.6)Not required in detached garages, carports or exterior porches that do not have habitable space above. (R309.6) Additions, alterations or repairs (R313.2 Exception)Additions, alterations or repairs (R313.2 Exception) “An automatic residential fire sprinkler system shall not be required for additions or alterations to existing buildings that are not already provided with an automatic residential sprinkler system.”

23 Wildland Urban Interface California requirement (Chapter 7A). California requirement (Chapter 7A). Most advanced Wildfire Ignition standard in the nation. Most advanced Wildfire Ignition standard in the nation. Key: Ignition-Resistance Key: Ignition-Resistance Vents protectionVents protection Window constructionWindow construction Exterior walls & soffitsExterior walls & soffits RoofsRoofs DecksDecks Applies to all new construction within WUI area and to additions/alterations to such compliant buildings. Applies to all new construction within WUI area and to additions/alterations to such compliant buildings. Additions, remodels & TI do not need to be retrofit to comply with Chp. 7A for buildings that were constructed prior to the establishment of Chp. 7A standards.Additions, remodels & TI do not need to be retrofit to comply with Chp. 7A for buildings that were constructed prior to the establishment of Chp. 7A standards.

24 Chapter 7A - WUI Chapter 7A has been completely revised. Chapter 7A has been completely revised. IRM is defined better. IRM is defined better. Use of spray-applied coatings to achieve IRM is expressly prohibited. Use of spray-applied coatings to achieve IRM is expressly prohibited. 2x rafter tails & 2x sheathing boards may be exposed at eaves. 2x rafter tails & 2x sheathing boards may be exposed at eaves. 2x solid fascia boards will be permitted without using FRTW. 2x solid fascia boards will be permitted without using FRTW. All vents reduced to 1/16” – 1/8” or require special vents. All vents reduced to 1/16” – 1/8” or require special vents. Special under-eave vents required if located within 12’ of grade or walking surface of a porch or deck, unless the attic space is sprinklered. Special under-eave vents required if located within 12’ of grade or walking surface of a porch or deck, unless the attic space is sprinklered. Exterior door and window protection has been clarified, especially for raised-panel doors. Exterior door and window protection has been clarified, especially for raised-panel doors. Fuel modification must be verified prior to issuance of Certificate of Occupancy. Fuel modification must be verified prior to issuance of Certificate of Occupancy. Objective: Understand the Hazard to mitigate the Risk. Objective: Understand the Hazard to mitigate the Risk.

25 California Building Code Based on 2009 IBC. Based on 2009 IBC. Most state amendments were statutory provisions. Most state amendments were statutory provisions. Disabled Access and Energy Conservation merit their own discussion/training. Disabled Access and Energy Conservation merit their own discussion/training. Group I, Division 1 occupancy has been eliminated. Group I, Division 1 occupancy has been eliminated. 24-hour residential care provisions have been moved to Group R, Division 2.124-hour residential care provisions have been moved to Group R, Division 2.1 “Fire-Smoke Barrier” has been added. “Fire-Smoke Barrier” has been added. LA Basin’s “Residential Second Exit” proposal for the 2012 IBC has been incorporated into CBC “early”. LA Basin’s “Residential Second Exit” proposal for the 2012 IBC has been incorporated into CBC “early”. For dwellings regulated under the CBC, a second exit will be required if the occupant load exceeds 20 persons.For dwellings regulated under the CBC, a second exit will be required if the occupant load exceeds 20 persons.

26 Height & Area Very few changes to Height & Area from last code cycle. Very few changes to Height & Area from last code cycle. Minor adjustments to select table values in T503. Minor adjustments to select table values in T503. H-2, H-3, H-4, L of Type I construction will be limited to 20- stories.H-2, H-3, H-4, L of Type I construction will be limited to 20- stories. I-3 must be Type IA or IBI-3 must be Type IA or IB Sprinkler “Double-Dip” Sprinkler “Double-Dip” Same as last cycle: SFM amendment allows sprinkler tradeoff for either height or area (but not both).Same as last cycle: SFM amendment allows sprinkler tradeoff for either height or area (but not both). A,E,H,I,L,R, other SFM applications A,E,H,I,L,R, other SFM applications “Multi-Story” Area Increase “Multi-Story” Area Increase Same as last cycle: SFM amendment only allows area to be doubled (not tripled) in buildings 3-stories and taller.Same as last cycle: SFM amendment only allows area to be doubled (not tripled) in buildings 3-stories and taller. A,E,H,I,L,R, other SFM applications A,E,H,I,L,R, other SFM applications CTC has halted efforts to revise H/A CTC has halted efforts to revise H/A Balanced Fire Protection is on holdBalanced Fire Protection is on hold

27 California Residential Code The IRC is finally here. The IRC is finally here. Applies to 1- and 2-family dwellings up to 3-stories in height. Applies to 1- and 2-family dwellings up to 3-stories in height. Including townhouses up to 3-storiesIncluding townhouses up to 3-stories Including live/work units complying with Section 419 of the CBC.Including live/work units complying with Section 419 of the CBC. Intended to provide designers with a consolidated code that contains all regulatory provisions for most projects. Intended to provide designers with a consolidated code that contains all regulatory provisions for most projects. Chapters 1 through 10 (R)-General BuildingChapters 1 through 10 (R)-General Building Chapter 11 (N) – Energy EfficiencyChapter 11 (N) – Energy Efficiency Chapters 12 through 23 (M) – MechanicalChapters 12 through 23 (M) – Mechanical Chapter 24 (G) – Fuel GasChapter 24 (G) – Fuel Gas Chapters 25 through 33 (P) – PlumbingChapters 25 through 33 (P) – Plumbing Chapters 34 through 43 (E) – ElectricalChapters 34 through 43 (E) – Electrical Appendices – Swimming Pools, Patio Covers, Sound Transmission, PSDs, Gray Water, etc.Appendices – Swimming Pools, Patio Covers, Sound Transmission, PSDs, Gray Water, etc. R301 – Alternative provisions & Engineered design R301 – Alternative provisions & Engineered design “Engineered design in accordance with the IBC is permitted for all buildings and structures, and parts thereof, included in the scope of this code”“Engineered design in accordance with the IBC is permitted for all buildings and structures, and parts thereof, included in the scope of this code”

28 California Residential Code R302.1(2) – Exterior wall fire separation distance. R302.1(2) – Exterior wall fire separation distance. Sprinklered dwellingsSprinklered dwellings 0’-3’ requires 1-hour walls with no openings 0’-3’ requires 1-hour walls with no openings >3’ no fire protection of walls or openings >3’ no fire protection of walls or openings Non-sprinklered dwellingsNon-sprinklered dwellings 0’-3’ requires 1-hour walls with no openings 0’-3’ requires 1-hour walls with no openings 3’-5’ requires 1-hour walls & 25% openings 3’-5’ requires 1-hour walls & 25% openings >5’ no fire protection of walls or openings >5’ no fire protection of walls or openings R311.4 Vertical Egress R311.4 Vertical Egress Habitable levels more than 1-story above/below the level of an egress door may not have a point located more than 50’ from an egress stair.Habitable levels more than 1-story above/below the level of an egress door may not have a point located more than 50’ from an egress stair. Guard height increase from 36” to 42” has been maintained from last code cycle. Guard height increase from 36” to 42” has been maintained from last code cycle. Residential sprinklers are not required in detached garages, or carports which do not have occupied space above. Residential sprinklers are not required in detached garages, or carports which do not have occupied space above.

29 Are You Prepared for the 2010 CBC, CRC & CGBSC ?? Beginning on January 1, 2011, several NEW BUILDING CODES will be enforced in California. For training information, visit www.icclabc.org; www.calbo.org; or speak with your local Building Official All architects, engineers, designers and contractors MUST be familiar with the new codes, or projects will NOT be approved.

30 Important Facts about the CBC, CRC & CGBSC The 2010 CBC and CRC are based on the International Building and Residential Code (IBC and IRC). For training information, visit www.icclabc.org; www.calbo.org; or speak with your local Building Official All structures other than one and two family dwellings and townhomes will be built under the NEW 2010 California Building Code (CBC). Beginning in 2011, one and two family dwellings and townhomes will be built under the NEW 2010 California Residential Code (CRC). The 2010 CGBSC is the first-in-the- nation to enforce mandatory Green Building Standards Code (CALGreen). Homes and buildings will be more energy efficient.


Download ppt "Adoption of the 2010 California Codes A brief look at what’s ahead Presented by: Stuart Tom LA Basin Chapter/ICC."

Similar presentations


Ads by Google