Download presentation
Presentation is loading. Please wait.
Published byDavid Taylor Modified over 9 years ago
1
Operate a Manufacturing Company (Case Study 2) (Rounds 2 and 4) EGN 5621 Enterprise Systems Collaboration Fall, 2011
2
Tasks for the Manufacturing Case Study (Rounds 2 and 3) NoRolesFunctionsTransaction Code 1CEOFinancial statementF.01 Price market reportZMarket Summary sales reportZVC2 Sales & MarketingSales order reportZVA05 Summary sales reportZVC2 Price market reportZMarket Marketing expenseZADS Change priceVK32 3Production & PlanningForecast – create planned independent Requirements MD61 MRP runMD01 Release production ordersCO41 Monitor production scheduleZCOOIS Product cost analysisZCK11 Check RM cost per Prod. orderZKSB1 4Procurement ManagementAutomatic generate of POsME59 Track PO reportZME2N MRP results displayMD07 Warehouse ManagementCheck stock levelMD04 Inventory reportZMB52 2
3
Cost, inventory & initial pricing Material$$-F01$$-F02$$-F03$$-F04$$-F05$$-F06 Name Nut Muesli 1.0 kg. Blueberry Muesli 1.0 kg. Strawberry Muesli 1.0 kg. Raisin Muesli 1.0 kg. Original Muesli 1.0 kg. Mixed Fruit Muesli 1.0 kg. Raw material Cost€ 1.53€ 1.97 € 1.38€ 1.36€ 1.76 Standard cost€ 2.48€ 3.09 € 2.50€ 2.65€ 2.89 Initial price 10 12 € 4.24 € 4.49 € 5.18 € 5.43 € 5.18 € 5.43 € 3.92 € 4.17 € 3.87 € 4.12 € 4.75 € 5.00 Initial stock100,000
4
Parameters of the Operation
5
Introductory Game: Round 2 30 steps 30 min
6
Participant’s job aid & Menu
7
Create Independent Requirement Pland for 6 Finished Products (MD61)
8
Create Independent Requirement Plan for 6 Finished Products (MD61)
9
Run MRP (MD01)
10
Conversion of Planned Order (CO41)
11
Release production order
12
Release Production Orders (CO41)
13
Check Production Schedule
14
Automatic Creation of Purchase Orders from Requirement (ME59)
16
Purchase Order Tracking(ZME2N)
17
Introductory game: Round 2 (30 steps - days) Now start the simulator for 30 steps
18
Introductory Game: Round 3 - 4 30 steps 30 min
19
Participant’s job aid & Menu
20
Raw material cost per PO
21
Forecasting
22
Execute MRP
23
After the MRP run
24
Convert purchase requisitions into purchase orders
25
Introductory game: Round 3 (30 steps – 30 days) Now start the simulator for the last 30 steps
26
Track purchase orders
27
Profit center analysis
28
Liquidity planning
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.