Download presentation
Published byAlexina Norris Modified over 9 years ago
1
BAE Systems Military Air & Information Overview
1 1
2
Military Air & Information
Key facts - Approx 15,500 people Turnover of c£4bn - Organised as 2 “lines of business” Combat Air Information Superiority & Services Our Mission: Working as an integral part of the team delivering information superiority and effective air power, our aim is to give real advantage to our customers worldwide. Trusted to deliver - always
3
Military Air & Information - Footprint
4
Warton Site Overview
5
This photograph showing Warton under construction dates from July 1942
Warton Site History Origins of the Site Origins goes back to May 1939 Original requirement was for a satellite airfield for RAF Squires Gate (Blackpool Airport) Taken over by the USAAF in 1942 as a maintenance and modification centre - known as B.A.D.2. This photograph showing Warton under construction dates from July 1942
6
Warton Site Overview Approx 7,500 employees on site.
Site approx 283 hectares with a runway of 2422 metres. Main Projects: Hawk, Typhoon, Tornado, Harrier, F-35 Lightning II, Nimrod MRA4, Autonomous Systems and Future Capability Specialist Capabilities: Flight test and development, electronic warfare and wind tunnels, avionic systems engineering, flight simulation, radar cross-section range, engine running hush house, support engineering, training solutions .
7
Samlesbury Site Overview
8
Samlesbury Site Overview
Approx 5,000 employees on site. Site approx 142 hectares Main Projects: Typhoon and F-35 Lightning II Specialist Capabilities: Advanced manufacturing technology, carbon fibre composites facility and advanced tooling manufacture, supply chain expertise Samlesbury Development: Continuing expansion of presence on-site Viability of Regional Aerospace Business Park being developed Other businesses on site: BAE Systems Saudi Arabia Logistics & Information Systems
9
Samlesbury Site Heritage
Municipal airfield proposed in 1922 to serve Blackburn and Preston. Construction didn’t begin until Flight Shed No.1 built as flight test facility for English Electric. By Dec 42 all 5 main hangars and 3 runways completed. By end of war, 3,000 bombers built and flown from Samlesbury. Canberra production commenced in 1949 and early 50’s saw Samlesbury begin final assembly of the Lightning. End of 1960’s Jaguar production started and 70’s saw Concorde and Tornado production at Samlesbury. Tornado, T-45 Goshawk and Airbus produced through the 80’s. Eurofighter Typhoon and F-35 most recent additions to Samlesbury’s proud history.
10
Samlesbury Site Master Plan - 2007 to 2015
F-35 Supply Marshalling facility Ph 1 & 2 Phased expansion of F-35 Machining Facility Phased expansion of F-35 major units assembly facility Phase 1 F-35 Machining Facility (2010) Potential new Products Centre (2016) MEST Facility (2009) Welfare Facility (2012) Phase 1&2 Flexible office buildings (2009) Site wide rationalisation and resilience activities AFAF Extension (2010) Reception, New site entrance and associated Local Highways infrastructure (2008/9)
11
Military Air & Information The Products
11 11
12
Unmanned Aircraft Systems
13
Unmanned Aerial Systems
HERTI HERTI is a low cost, high endurance Unmanned Air System (UAS), providing solutions to a wide range of military and civil operational needs HERTI offers a fully autonomous flexible solution, providing high quality imagery using safe, reliable platforms, able to integrate seamlessly with current and future information networks MANTIS An indigenous UK programme to integrate technologies and capabilities necessary for deep and persistent ISTAR (Intelligence, Surveillance, Target Acquisition and Reconnaissance) onto an unmanned autonomous system TARANIS Provide the UK MoD with experimental evidence on the potential capabilities and help to inform decisions on the future mix of manned and unmanned fast jet aircraft Taranis aims to push the boundaries of technology by providing advancements in low observability capability and autonomous mission systems operations demonstrating the feasibility and utility of UAVs Sample text slide with imagery
14
F-35 Lightning II
15
F-35 Lightning II The world’s most advanced combat aircraft and the first and only stealthy supersonic, multi-role fighter Partnered with Lockheed Martin and Northrop Grumman BAE Systems' experience and expertise in military aircraft is key to the development of the airframe, vehicle and mission systems The aft fuselage and the vertical and horizontal tails are designed, manufactured and assembled by BAE Systems The System Development and Demonstration phase is estimated to be worth more than £1.3bn to BAE Systems First flight of the Conventional Take-Off and Landing aircraft took place in December 2006 First flight of Short Take-Off and Landing aircraft took place in June with BAE Systems test pilot Graham Tomlinson at the controls The UK MoD has selected the carrier variant of F-35 .
16
F-35 Lightning II BAE SYSTEMS - Military Air & Information
LOCKHEED MARTIN - Palmdale LOCKHEED MARTIN - Aeronautics NORTHROP GRUMAN – Air Combat Systems
17
Hawk
18
Hawk Hawk is the world’s most successful trainer with 18 customers worldwide The Hawk provides a seamless transition between basic flying training and operational conversion to both current, and projected, front line combat aircraft types Hawk is a critical part of an integrated training system Largest 2 programmes currently UK & India 18 18
19
Typhoon 19 19
20
Typhoon Typhoon is the world’s most advanced new generation multi-role / swing-role combat aircraft available on the market. It has been ordered by six nations: UK, Germany, Italy, Spain, Austria and Kingdom of Saudi Arabia It is Europe’s largest military collaborative programme employing over 100,000 jobs in 400 companies across Europe Eurofighter GmbH is the consortium set up to manage the development and production of the complete Typhoon weapon system 559 Typhoons are currently under production contract Typhoon Tranche 3A contract was signed in July 2009 Signature of an agreement between the Kingdom of Saudi Arabia and the UK Government covers the supply of 72 Typhoon aircraft to the kingdom. Deliveries commenced in June 2009 Current export campaigns include Japan (BAE Systems/Alenia led) and India (Cassidian led) 20 20
21
Typhoon Workshare BAE Systems (Germany Cassidian) Alenia
(Spain Cassidian) Based upon - Baseline U.K. 232 37.5% Germany 180 30% Italy 121 19.5% Spain 87 13% Total = 620 21 21
22
Copyright © 2005 BAE Systems. All rights reserved.
BAE Systems in the North West Economic Importance and Community Links Sample title slide Copyright © 2005 BAE Systems. All rights reserved.
23
BAE Systems’ economic importance to the North West
North West is the region in which BAE Systems’ presence is most critical to the regional economy BAE Systems’ considerable presence in NW of particular importance to Government policies aimed at reducing regional disparities and developing a ‘knowledge economy’ The North West is by far the most important region for BAE Systems in the UK, accounting for about half of its 35,000 UK employees These include 9,300 skilled technical jobs, and 6,000 managerial and professional jobs For every 10 jobs directly supported by BAE Systems in the NW another 13 are created in the supply chain Source : The Economic Contribution of BAE Systems to the UK in 2006, Oxford Economics/Geo Economics, April 2008
24
BAE Systems’ economic importance to the North West
Just under 3% of all knowledge intensive private sector jobs and 12% of knowledge intensive production sector jobs (nearly one job in eight) in the NW are directly generated by BAE Systems In the Central Lancashire City Region BAE Systems accounts for a third of direct employment in knowledge intensive manufacturing More suppliers in the North West (1,200) than any other region Support from BAE Systems (e.g. in mentoring schemes) has been critical to developing and maintaining supply networks in the region Source : The Economic Contribution of BAE Systems to the UK in 2006, Oxford Economics/Geo Economics, April 2008
25
BAE Systems’ economic importance to the North West
Military Air Solutions in the NW recruits 100 graduates a year, investing £80,000 in each for salary, skills and learning over a two year development programme BAE Systems Training Centre in Preston trains up to 200 apprentices a year (to NVQ Level 3 equivalent), with a completion rate of 80% plus Significant investment at BAE Systems’ Samlesbury site to expand footprint and consolidate activity Source : The Economic Contribution of BAE Systems to the UK in 2006, Oxford Economics/Geo Economics, April 2008
26
BAE Systems – Part of the community
27
BAE Systems in the local community
Community sponsorship activities Charity Challenge programme Site based partner charities Volunteering projects Local site community liaison groups Public Forums to explain substantive issues or developments at sites
28
BAE Systems in the local community
Annual education road show for local schools Ambassadors – Engineers into Schools Partnership school programme Take Your Sons and Daughters to Work Day .
29
REAL PERFORMANCE. REAL ADVANTAGE.
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.