Presentation is loading. Please wait.

Presentation is loading. Please wait.

Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20.

Similar presentations


Presentation on theme: "Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20."— Presentation transcript:

1 Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20 years, added Home Appliances, Kitchen tools, Furniture and Leisure tools Leading market player in Russia for Home appliances, now in India market too Started Infrastructure focussed business in 2010 through the new group company STAR PLUS GLOBAL Star Plus Group : Introduction

2 Group Companies: Star plus HK Limited:- Flag Ship, Specialising in Home Electronics & Appliances for Russian market Star Line Traders Limited:– Merchandisers & Traders, Sourcing specialists for small appliances, machine parts & paper products Star plus Global Limited – Focussed on Infrastructure needs  Pre-engineered steel structures & Pre engineered buildings  Solar Panels, Panel support structures  Steel & Aluminium formed members  Equipment supplies to Power & Infrastructure projects Star Plus Group : Introduction

3 Businesses focussed on delivering customised solutions to the steel, steel structure and metal forming needs of Infrastructure Companies involved in  Power projects – Thermal, Gas & Solar  EPCs  Refinery & Chemical Industry project  Road/Bridge projects  Transmission line Towers Relationship with some of the largest Chinese steel fabricators for – Heavy structures suitable for Power, steel plant construction – Light structures for commercial & residential High rises Star Plus Group : Introduction

4 Steel Fabricators in China have evolved over the last 15 years to attain International Quality standards and scale Fabricators posses capabilities to successfully execute large project orders for heavy structures like Trusses, Build up Sections (Beams, Columns) SPG is in regular engagement with many large fabricators in China Together these suppliers have capability to deliver for practically any form of fabricated steel/sheet metal structure for all Infrastructure projects Quality Monitoring and Testing to ensure “What we get is what we ordered” Star Plus Global: Fabrication in China

5 Backed by the most competitive and dynamic domestic market in the world for Steel raw material and skilled work force:- Steel Raw Material makes upto 70% of the total cost for Heavy fabricated structures, even higher % Light/Medium strictures China is the largest producer and consumer of steel in the world, produces over 50% of world’s steel Supply far in excess of demand for products like HR Plates, H- Beams and sections, allowing fabricators access to one of the cheapest steel prices for all parts of the year, for years to come Large Fabrication capacities established during the last decade, per ton fixed costs are the lowest in the world Powering Chinese infrastructure growth in the last 20 years have made many of the top fabricators world class in Quality and execution of orders Competitive advantage

6 Arbitrage through Competitive Imports Significant cost saving with reliability of supply will be crucial to capturing maximum value Project Pricing Average price for the full length of supplies Comprehensive Supply Advantage Regular tracking of International & China steel prices enables us to tap price advantages at right times from China Index based pricing possible for hedging raw material and currency fluctuations Quality Control & Shipping to destination by arranging suitable vessel Star Plus Global Edge

7 Supplying pre-fabricated steel structures to large Indian Power/Infrastructure projects Heavy & Medium Structures – Lanco International Pte Limited » Babandh (2 x 660 MW) - 22,500 MT, 70% Completed » Vidharba (2 x 660 MW) - 22,500 MT, 70% Completed » MB Power, Annupur (2 x 600 MW) Successfully completed – Abir Engineering, Hyderabad » East Coast Power (2 x 660 MW) - 19,100MT; Started deliveries » Singhitarai TPP (2 x 660MW)- 22,000MT; Successfully completed Star Plus Global: Credentials

8 Trial Assembly at Chinese Factory before port dispatch

9 Star Plus Global: Credentials Packing & Storage at Load port

10 Light & Medium Structures – Lanco International Pte Limited » Babandh (2 x 660 MW) – 5,000 MT Structures of Pipe Racks, ESP control room, CHP structures & Pump Houses » Vidharba (2 x 660 MW) – 5,000 MT, Structures of Pipe Racks, ESP control room, CHP structures & Pump Houses Star Plus Global: Credentials Local Knowledge and relationships in China  Over a decade of close working with Suppliers for various engineering products  75+ cumulative years of working with China by Star Plus Group’s Key Executives  Well versed with Chinese business culture, local environment & integrating the differing working styles of factories & the project team

11 Network of owned offices » Over 50 team members in Shenzhen, in Southern China & » Ningbo, Zhejiang province. » Centrally located in the Yangtze River economic region » Project offices located at Factories in PR China » Hefei, Anhui » Suzhou, Jiangsu » Jinan, Shandong Management, Business and Financial Head Quarter based at Hong Kong Working with leading International bankers in Hong Kong  HSBC  Standard chartered  ICICI  Indian Overseas Bank Star Plus Group: Credentials

12 Dedicated team of technically qualified front line executives in China » Design Drawing & Detailing for Fabricator/Project Liaison » Team of Quality Assurance (QA) experts with hands-on experience in Welding, Fabrication, painting and packing Inspection, including Radiography, UT Organise Internal and ocean Logistics to provide CFR Indian port offer for project cargo requirements, including discharge onto Wharf at Indian Port Competitiveness further enhanced by the Group's presence in steel products exports /imports in China, SE Asia and India, which allows SPG to closely study, forecast near term supply/demand conditions to customers and add value to their purchase decisions Star Plus Global: Credentials

13 Hopper Fabrication for 2 x 600 MW Sub- Critical Power Plant in India

14 Star Plus Global: Credentials Hopper Fabrication for 2 x 600 MW Sub- Critical Power Plant in India

15 Star Plus Global: Credentials Hopper segment trial assembly, real time Inspection by SPG at Factory shop

16 Remarks: SPG DAILY FLASH REPORT Star Plus Global: Client Reports Project: 2 X 600 MW THERMAL POWER PLANT INDIA Ref No : Date 07.05.2013 Client : ………… Manufacturer :Jinan Lai gang Steel Structure. Place of Inspection: XXXX,Jinan Inspection Request By: XXX Factory, PR China Sl.NoStage of InspectionDescriptionDrawing No/Part No Qty 1Welding InspectionBunker beamSTPP-U2BM-31B91 2 Welding InspectionBunker columnSTPP-U2AM-2CF-21 1 3 UT testBunker column STPP-U2AM-2CF-211 Sl.NoDate Scope of work Findings Action Required Manufacture responseResult 107.05.2013 Welding Inspection Surface of the weld checked & found ok.Dimension checked & found ok. Ok 207.05.2013UT test UT test was done on the column & the result was found ok. Ok

17 Remarks: Star Plus Global: Detailing Support Due to site welding of Hopper- BURP1 in Segment - 1, we suggest double groove spot weld instead of Single groove. Snapshot and detail drawing is attached for reference. Please kindly check and confirm (After discussions with production unit in China by our site team)

18 Star Plus Global: Detailing Support Stub Columns is shop welded to heavy part of Hopper- segment-1 While erecting it to beam the bolt clearance is just 2 mm, which will cause alignment difficulty in erection. The vertical bracings in between the Stub Columns have insufficient space for erecting at site Likely problem during site erection Suggested Solution Shell Supporting Stub Columns in Hopper for Site welding After erecting the beams the Stub Columns may be bolted easily Vertical bracings can be erected. Finally the Hopper segment -1 can be erected to the stub columns and welded at site Punch marks of stub column numbers will be provided at the bottom of segment -1 for easy identification and alignment Suggested site welded procedure

19 Star Plus Global: Logistics Can offer the product CFR Indian Port basis to all major ports in India, delivered to Wharf or to port warehouse Ability to offer smaller lots by container wherever it makes more commercial value for the project Advantage of working directly with major carriers & operators in China/India trade Over 100,000 CBM of project cargoes shipped in last 6 months to East India Port (s), some of the vessels handled by us include  MV Joyful Fortune  MV Han Ren  MV Wise  MV Paragon Pescadores  MV Ocean Concord Advantage of daily, real time monitoring of internal transportation, port storage and loading at load port


Download ppt "Started in 1993 based out of Hong Kong Group Turn Over in last 3 years US$ 150 Million FY 11 US$ 200 Million FY 12 US$ 250 Million FY13 Over the last 20."

Similar presentations


Ads by Google