Adapted control systems for house service connection stations of huge performance – domestic hot water supply based on continuous flow system Faculty of Mechanical Engineering Institute of Power Engineering, Second Euroheat & Power RTD Workshop Brussels, 2-3 February 2006 Dipl.-Ing. Norbert Wünsche, Dr.-Ing. Karin Rühling TU Dresden, Institut of Power Engineering This presentation is based on a research project financially supported by the German Federal Ministry of Economy within the PROgramm “INNOvationskompetenz mittelständischer Unternehmen” (KF 0100804KMH3) Professorship of Energy System Engineering and Heat Economy
2
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 2 MOTIVATION Domestic hot water supply in the range of 100 kW to 1 MW Standard installations temporary mostly as storage systems favourable conditions for growth of Legionella Cause of high quality standards (TrinkwV, DVGW W 551) special solutions with considerable high efforts necessary Storage charging system Storage of DHW Storage system Storage of DHW
3
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 3 OBJEKTIVE Check, if continuous flow system can be applied simple hydraulic circuit primary storage for heating water domestic hot water temperature control system based on speed control of electronic pumps Continuous flow system with primary storage Storage of heating water Continuous flow system Without storage
4
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 4 Tested basic configurations on DHW side Two-stage principle – during tapping t return , as no mixing circulation/cold DW primary storage of heating water supply return DHW DW circulation
5
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 5 Basic configurations for charging the primary storage Control system without auxiliary power demand Thermo mechanical valve Three-point control Motor control valve direct charging Two-point control Motor control valve Three-point control Motor control valve indirect charging Adjusted charging temperature
6
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 6 Choice of the pump
7
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 7 Set-up of the laboratory test facility temp. HX inlet temp. DHW with sensor head trans- mitter temp. circ. return SIKA flow control switchtemp. DW nonreturn valve temp. HX outlet Single-stage realisation Q th, design = f(t storage ) = 100 …150 kW Switching the mixing valve via flow control switch 0.. 12 l/min t HX,in =65 °C > 12 l/min t HX,in = t storage Control pump Grundfos TPE 25-90R (smallest available) Plate HX SWEP B28 x 30 Rudert DW-storage 200 l
8
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 8 Key aspects of the laboratory tests Test of different hydraulic circuits Measuring the time constants of different temperature sensors Placement of DW-temperature sensor in heat exchanger Examination of the control range of the electronic pump Dimensioning the admix-quantity Choice of proper mixing valve Choice of appropriate flow control switch Optimisation of pump control parameters
9
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 9 Selected results of the laboratory tests with 72 °C storage temperature Load profile Step curve Load profile Jump function
10
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 10 Selected results of the laboratory tests Load function / storage temperature Maximum values Minimum values average positive deviation average negative deviation Step curve 72 °C+2,2 K-3,6 K+0,3 K-1,2 K Jump function 72 °C+5,5 K-3,6 K+0,7 K-1,1 K Step curve 80 °C+2,1 K-1,9 K+0,2 K-0,4 K Jump function 80 °C+6,5 K-5,7 K+0,5 K-0,7 K
11
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 11 Field test – Objectives Prove under praxis conditions uninterrupted service, dimensioning of performance, stability of control, effectiveness of primary storage (coverage of peak demands) as well as low return flow temperatures and thus function of complete system Single-stage realisation
12
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 12 Field test – Conditions of application For 53 living units two-stage DW-heating first operation period single-stage and later two-stage operation mixing loop as independent temperature control circuit no cold water flow sensor data logging 11 temperature sensors 3 flow rate sensors average value logging (2 or 5 s–pulse) 8 weeks save and convenient supply of tenants V´ DHW,max = 2,95 m³/h (Comparison: DIN 4708 4,8 m³/h)
13
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 13 Field test - Selected results – Daily average values Remarkable higher control stability in the two-stage realisation (± 2K)
14
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 14 Field test - Selected results – Daily course; two-stage
15
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 15 Field test - Selected results – Peak demand; two-stage
16
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 16 Field test - Selected results – Frequency distribution DHW demand DHW-demand only 32 % of the time only during 10 % of the time demand > 0,5 m³/h dimensioning of primary storage = f (circulation demand, operation parameter of heat exchanger, mixing loop, storage temperature..) program for dimensioning frequency distribution flow rate of area-equivalent rectangle: 0,134 m 3 /h time in % flow rate in m 3 /h
17
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 17 Field test - Selected results – Daily course; single-stage
18
Brussels, 2 February 2006Huge DHW supply based on continuous flow system Wünsche/Rühling Slide 18 Field test - Selected results – Peak demand; single-stage