1 DCTA Project Update Thomas M. LeBeau Vice President Capital Projects

2 Agency Background Formation 2002: (HB 3323/Chapter 460) Formation 2002: (HB 3323/Chapter 460) –Initial Service Plan Development Fixed Route Bus ServicesFixed Route Bus Services University of North TexasUniversity of North Texas Rail ServiceRail Service –A-train: Phase I (In service 2011)Phase I (In service 2011)  10 miles from Carrollton to Lewisville Lake  Cross platform transfer to DART (Trinity Mills)  Three Stations: Hebron, Old Town & Highland Village/Lewisville Lake.

3 Agency Background Phase II (In service 2012) Phase II (In service 2012)  11.5 miles from Lewisville Lake to Downtown Denton  Two Stations: MedPark & Downtown Denton Transit Center (DDTC)  DDTC Bus and Rail Current Plan Current Plan  Revenue Service June 2011 o 21.3 miles, Carrollton – Denton o All five Commuter Rail Stations o 100% Locally Funded Regional Toll Revenue Funds

4 Corridor Challenges 21.5 Miles 21.5 Miles I35E I35E Missouri, Kansas, Texas Missouri, Kansas, Texas Rails to Trails Rails to Trails DART/Denton Owned DART/Denton Owned Utility Relocations Utility Relocations  19 Mile Fiber  30” RAW Waterline Existing Freight Service Existing Freight Service  DGNO Short-line  4 Customers  3 – 5 Trains per week

5 Station Challenges Site Selection Site Selection –Fixed Route Bus and Rail System Integration Design Approvals Design Approvals –Municipal and Community Input –Simple –Cost Effective –Aesthetically Consistent Jurisdictional Multi-Use Agreements Jurisdictional Multi-Use Agreements Two Vehicle Types: Two Vehicle Types: –Budd Rail Diesel Cars (Start-up) –Diesel Multiple Unit (Ultimate)

6 Hebron Station 9.266 Acres 9.266 Acres  Phase I – 6.06 Acres  Phase II – 3.026 Acres Parking Parking  Phase I – 393/13ADA  Phase II – 267 Total – 610 / 13ADA Total – 610 / 13ADA

7 Old Town Station 9.085 Acres 9.085 Acres  Phase I – 5.285 Acres  Phase II – 3.80 Acres Parking Parking  Phase I – 357 / 12 ADA  Phase II – 240 Total – 587 / 12 ADA Total – 587 / 12 ADA

8 HV/LL Station 2.805 Acres 2.805 Acres  Phase I Parking  133 spaces / 5 ADA  Phase II Parking  467 spaces / 10 ADA  TxDOT (I35E) Total – 600 / 15 ADA Total – 600 / 15 ADA

9 MedPark Station 12.805 Acres 12.805 Acres  Single Phase Opening  Total – 705/ 18 ADA  Medical Center Access

10 Downtown Denton TC 2.5 Acres 2.5 Acres  Parking – 60 / 13 ADA  Direct Access to DCTA Fixed Route Bus Service  6,000SF of DCTA Bus Op’s and Retail Space  Enhanced Passenger Amenities

11 Delivery Method Construction Manager General Contractor (CMGC) Construction Manager General Contractor (CMGC)  Pre-Construction Services  Guaranteed Maximum Price (GMP)  Cost Plus Fixed Fee Lessons Learned Lessons Learned  Pre-Construction Start  NTP Early in Design  Design Completion (Validation)  Prior to GMP Negotiations  Value Engineering  Teamwork Mindset Critical  Agency + Designer + Contractor = Success  Transparency by all parties

12 Vehicle Procurement Budd RDC vs. Stadler GTW Budd RDC vs. Stadler GTW  Challenges  Extended Vehicle Procurement  Clearance  ADA Compliant Level Boarding  Limited Re-work at Fleet Conversion  FRA Compliant vs. Non-Compliant

13 Vehicle Procurement Budd RDCs (Start Up) Budd RDCs (Start Up)  Stations Constructed to Stadler GTW Boarding Requirements o Significant Step Difference During RDC Operations o ADA Compliance o Step Filler Solution o Temporary Mini High ADA Platforms

14 Vehicle Procurement Stadler GTW (Swiss Manufacturer) Stadler GTW (Swiss Manufacturer)  Positives o Provides ADA Level Boarding o Sleek Aesthetically Pleasing Design o Fuel Efficient o Environmentally Friendly o Enhanced Performance o Crash Energy Management  Negatives o Currently FRA Non-compliant

15 Vehicle Procurement Alternative Vehicle Technology Alternative Vehicle Technology  Railroad Safety Advisory Committee (RSAC) Engineering Task Force  Crashworthiness Guideline Development  FRA, APTA, Car Builders and Agencies  DCTA and Stadler Active Role with FRA toward Implementation

16 Vehicle Procurement Alternative Vehicle Technology Alternative Vehicle Technology  DCTA Vehicle Modifications  11 Stadler GTWs Under Production to Fully Comply with FRA AVT Guidelines  End, Side, Corner, Rollover and Coupler Strength Requirements  Passenger and Operator Seat Standards

17 Vehicle Procurement Alternative Vehicle Technology Alternative Vehicle Technology  Why?  Increased Safety  Regional flexibility  Operate with compliant equipment  No temporal separation  Increased competition

18 Construction Progress At-Grade Crossings At-Grade Crossings  Total of 43  Quiet Zone Design  Civil Upgrades  Crossing Warning Protection  FRA QZ Approvals  50% Complete  Keys to Successful Completion  Jurisdictional Coordination  Public Involvement and Notification

19 Construction Progress Structures Structures  Total of 26  Bridge and Culvert Crossings  Elm Fork and Lewisville Lake  Major Rehabilitation  Loop 288 Grade Separation  Rail from Vehicle Traffic  Improve Safety  Traffic Congestion Relief  81% Complete

20 Construction Progress Facilities Facilities  Five Stations  Trinity Mills – 95% Complete  Hebron – 95% Complete  Old Town – 90% Complete  HV/LL – 70% Complete  MedPark – 40% Complete  DDTC – 60% Complete  O&M Facility  25% Completion  Commissioning August 2011

21 Construction Progress Track and Civil Track and Civil  77% Complete  South to North Heading Focus  Two-Thirds Under Construction  Noise Wall Construction  Utility Relocations  19 Mile Verizon FO – 100%  30” Raw Waterline – 75%  DME Power Line – 100%

22 Construction Progress Systems and Communications Systems and Communications  65% Complete  New Crossing Warning Protection  Preemption and Traffic Signal Upgrades  New Wayside Signal Upgrades  Fiber Optic Backbone Communication System  Full Communications Dispatch Center