Floodplains and your Treatment Plant How Hurricane Katrina Is Changing Your Floodplain in Michigan Daniel Schechter, P.E. Greeley and Hansen 1.

Similar presentations


Presentation on theme: "Floodplains and your Treatment Plant How Hurricane Katrina Is Changing Your Floodplain in Michigan Daniel Schechter, P.E. Greeley and Hansen 1."— Presentation transcript:

1 Floodplains and your Treatment Plant How Hurricane Katrina Is Changing Your Floodplain in Michigan Daniel Schechter, P.E. Greeley and Hansen 1

2 2 August 30, 2005 – New Orleans, LA. Aerial view of some of the damage the day after Hurricane Katrina hurricane hit August 29, 2005. This is the levee on the east or lower side of the Industrial Canal. Photo by Jocelyn Augustino/FEMA

3 3 What Does Hurricane Katrina Have To Do With My Facility? As a Result of Hurricane Katrina, 1.FEMA is modifying, digitizing nearly all floodplain maps over 2008 – 2015 2.Increased attention to construction in floodplains 3.Levees and flood control structures are requiring inspection 4.Some levees and flood control structures are being decertified

4 Importance of Floodplains  100-yr and 500-yr floodplains affect what structures can be built on site and how they are protected  Will affect flood insurance requirements for residents, business, municipalities 4

5 Construction Permit Application 5

6 Classifications 1. Facility in the 100yr Floodplain 2. Facility in the 100yr Floodplain Protected by Floodwall / Dike / Fill / etc. 3. Facility not in the 100yr Floodplain 6

7 Facility in a Floodplain 7 Facility In the 100yr Floodplain - Protected Proposed Floodwall

8 Facility in the 100yr Floodplain? 8  Is it the borders on the FEMA map?  Is it anywhere on the site at or below the flood elevation?  Is it the area that would be inundated by a flood?

9 Possible Consequences  Wastewater outfall needed to be re- designed because structure determined to be in floodplain  State now requiring floodplain permit for construction activities at site where previously not required by state  Detailed floodplain study required before construction can be permitted at site 9

10 Possible Consequences, cont’d  Portion of site no longer buildable  Buildings with “substantial improvement” will need flood protection  Need to submit Letter of Map Revision (LOMR) to FEMA  Delays associated with obtaining permits, conducting studies 10

11 Who Is In Charge?  Local Government  MI Department of Natural Resources and Environment (DNRE)  Federal Emergency Management Agency (FEMA)  US Army Corps of Engineers (USACE) 11

12 Flood Insurance Rate Maps (FIRM)  What year were they issued?  What revisions have been made?  When will they be updated?  How can I submit data for the next revision?  What datum is used? 12

13 Flood Insurance Rate Map (FIRM) 13

14 Digital FIRM Viewer 14

15 FEMA Mapping Updates 15

16 General Flood Standards  Protective structures need to be 3 feet above 100 year floodplain elevation  “New” structures need to be outside of floodplain  Flood protection for structures in floodplain  “Critical” structures outside of 500yr floodplain  Wide variation in application 16

17 Possible Endpoints  Floodplain Permit (MDNRE / ACOE Joint Permit)  Floodproofing of Structures  Letter of Map Amendment (LOMA)  Letter of Map Revision (LOMR) Investigate Ahead of Time!! 17

18 Important Resources  MI DNRE Floodplain Management www.michigan.gov/deq www.michigan.gov/deq  FEMA Map Service Center www.fema.gov www.fema.gov  U.S. Army Corps of Engineers www.lre.usace.army.mil www.lre.usace.army.mil 18

19 Questions? Daniel Schechter, P.E. Greeley and Hansen 211 W Fort St., Suite 710 Detroit MI 48226 Tel (313) 628 ‐ 0730 Email: dschechter@greeley ‐ hansen.comdschechter@greeley ‐ hansen.com 19