Presentation is loading. Please wait.

Presentation is loading. Please wait.

ESA UNCLASSIFIED – For Official Use SENTINEL-1 OVERVIEW AND RELATED ACQUISITION PLANS: FORESTS AND AGRICULTURE Johannes Roeder / Pierre Potin ESRIN 26/02/2014.

Similar presentations


Presentation on theme: "ESA UNCLASSIFIED – For Official Use SENTINEL-1 OVERVIEW AND RELATED ACQUISITION PLANS: FORESTS AND AGRICULTURE Johannes Roeder / Pierre Potin ESRIN 26/02/2014."— Presentation transcript:

1 ESA UNCLASSIFIED – For Official Use SENTINEL-1 OVERVIEW AND RELATED ACQUISITION PLANS: FORESTS AND AGRICULTURE Johannes Roeder / Pierre Potin ESRIN 26/02/2014

2 ESA UNCLASSIFIED – For Official Use I. Sentinel-1 mission overview Sentinel-1 Mission Facts Constellation of two satellites (A & B units) C-Band Synthetic Aperture Radar Payload (at 5.405 GHz) 7 years design life time with consumables for 12 years Near-Polar sun-synchronous (dawn-dusk) orbit at 698 km 12 days repeat cycle (1 satellite), 6 days for the constellation Both Sentinel-1 satellites in the same orbital plane (180 deg phased in orbit) Optical Communication Payload (OCP) for data transfer via laser link with the GEO European Data Relay Satellite (EDRS) Launch of Sentinel-1A scheduled for 03 April 2014 (Sentinel-1B ready for launch by end 2015)

3 ESA UNCLASSIFIED – For Official Use Sentinel-1A major milestones QAR KO (Satellite Qualification Review)  January 13 th, 2014 QAR Conclusion  February 18 th, 2014 Arrival in Kourou and start of Launch Campaign  February 24 st, 2014 Launch  April 3 th, 2014 I. Sentinel-1 mission overview Sentinel-1 Mission Facts

4 Slide 4 ESA UNCLASSIFIED – For Official Use 4 mutually exclusive SAR modes with different resolution and coverage Polarisation schemes for IW, EW & SM: single polarisation: HH or VV dual polarisation: HH+HV or VV+VH Wave mode: HH or VV SAR duty cycle per orbit: up to 25 min in any of the imaging modes up to 74 min in Wave mode Main modes of operations: -IW over land and coastal waters (normally VV or VVVH polarization) -EW over extended sea (VV or VVVH) and sea-ice (HH or HHHV) areas -WV over open oceans I. Sentinel-1 mission overview Sentinel-1 SAR imaging modes

5 ESA UNCLASSIFIED – For Official Use In line with the Sentinel operations strategy objectives:  Implement pre-defined and conflict-free observation plans, aiming at fulfilling,. to the best extent, the observation requirements from: - the Copernicus services - the use by ESA / EU Member States  In addition, on a best effort basis: -ensure continuity of ERS/ENVISAT -implement requirements from the science community -contribute to international cooperation activities. During the ramp-up phase: Start serving selected project needs located outside already established observation zones on a best effort basis  Need to find a priori the solutions for potential conflicts among users (e.g. different SAR operation modes / polarisation required over the same geographical area)  Build substantial archives - II. Sentinel-1 acquisition plans Sentinel-1 observation scenario objective

6 ESA UNCLASSIFIED – For Official Use Slide 6 II. Sentinel-1 acquisition plans Sentinel-1 gradual capacity increase (ramp-up) triggers: Data download & sensing time

7 ESA UNCLASSIFIED – For Official Use II. Sentinel-1 acquisition plans Basic observation characteristics (excerpt) ModeSwath Wide Stripmap (SM)80 km Interferrometric Wide Swath (IWS) 250 km Extra Wide Swath (EWS) 400 km Wave (WV)20 x 20 km Standard production PRODUCTRESOLUTION (rg. X az.) No. of looks GRD-MR88 x 87 m22 x 5 GRD-HR20 x 22 m5 x 1 SLC (selected areas only) 2.7-3.5 x 17.4 m1 x 1 Standard mode – polarization combinations Over land*IWS VV or VVVH Major ice-capsIWS HH Sea-ice*EWS HH or HHHV (European) marginal seas* IWS or EWS VV or VVVH * Some exceptions

8 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 8 ESA UNCLASSIFIED – For Official Use  Consistent European coverage  Sea-ice, -state, maritime surveillance  Major risk areas (tectonic and volcanic activity)  Based on requests by COPERNICUS services and EU/ESA member-states II. Sentinel-1 acquisition plans Sentinel-1 major observation scenario constituents for the first 6 month  High frequent two-pass coverage of tectonically.. and volcanic active areas  Served bi-cyclic  Based on requests by EU/ESA member-states and science  Zonal global background mapping  Drought zones taken from FAO global climate map, extrapolated to countrywide wall-to-wall coverages  IWS mode, VVVH polarization  One pass  Following multiple requests, main trigger flood reference mapping  Various further requests for smaller local to regional zones to be acquired  during repetitive campaigns (e.g. ice- shields)  with medium frequency  with seasonality  to be gradually intro- duced into the routine observation scenario

9 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 9 ESA UNCLASSIFIED – For Official Use  13 reference data sets  One especially dedicated to forestry (Sumatra)  public available shortly after IOCR  high frequency (<=12 d)  to be continued throughout whole mission II. Sentinel-1 acquisition plans Sentinel-1 - Focus forest (reference data set)

10 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 10 ESA UNCLASSIFIED – For Official Use Polarization switch 4 times / a during ramp up II. Sentinel-1 acquisition plans Sentinel-1 - Focus forest (South America) Tectonically active areas & volcanoes monitoring Sentinel-1 – GFOI support South America - regular interferometry campaign - Tectonically active areas & volcanoes monitoring Sentinel-1 – GFOI support South America - During forestry campaign -

11 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 11 ESA UNCLASSIFIED – For Official Use Polarization switch 4 times / a during ramp up II. Sentinel-1 acquisition plans Sentinel-1 - Focus forest (East Africa) Tectonically active areas & volcanoes monitoring Sentinel-1 – GFOI support East Africa - regular interferometry campaign - Tectonically active areas & volcanoes monitoring Sentinel-1 – GFOI support East Africa - During forestry campaign -

12 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 12 ESA UNCLASSIFIED – For Official Use Support to GEOGLAM Phase 1a:  4 rice test-beds  Every 24 days  IWS mode, VVVH polarization II. Sentinel-1 acquisition plans Sentinel-1 - Focus agriculture (SE - Asia)

13 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 13 ESA UNCLASSIFIED – For Official Use II. Sentinel-1 acquisition plans Sentinel-1 - Focus SE-Asia  Overpass (UTC):  ASC: ca. 11:00-11:30  DESC: ca. 23:00-23:30  Only small swath overlap due to equator closeness

14 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 14 ESA UNCLASSIFIED – For Official Use Perspective SE-Asia Potential for a frequent-revisit zone On the SE-Asian Peninsula:  Clustering of requirements in the region  Sufficient resources may become available last quarter 2014  Potentially one-pass coverage, dual polarization (VVVH)  Under discussion and evaluation

15 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 15 ESA UNCLASSIFIED – For Official Use Sentinel-1 acquisition plans Sentinel-1 observation scenario constituents Keep updated - follow Sentinel-1 on the web: Further information on Sentinel-1 observation scenarios will become available at ESA`s ‘Sentinel online’ website including:  A detailed description of the Sentinel-1 observation scenario for the ramp-up phase before launch (HLOP already present)  Consolidated observation plans (will allow to browse through strips) successively for the ramp-up phase published during the commissioning THANK YOU!

16 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 16 ESA UNCLASSIFIED – For Official Use  Consistent European coverage  Sea-ice, -state, maritime surveillance  Major risk areas (tectonic and volcanic activity)  Based on requests by COPERNICUS services and EU/ESA member-states II. Sentinel-1 acquisition plans Sentinel-1 major observation scenario constituents for the first 6 month

17 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 17 ESA UNCLASSIFIED – For Official Use II. Sentinel-1 acquisition plans Sentinel-1 major observation scenario constituents for the first 6 month  High frequent two-pass coverage of tectonically and volcanic active. areas  Served bi-cyclic  Based on requests by EU/ESA member-states and science

18 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 18 ESA UNCLASSIFIED – For Official Use II. Sentinel-1 acquisition plans Sentinel-1 major observation scenario constituents for the first 6 month  Zonal global background mapping  Drought zones taken from FAO global climate map, extrapolated to countrywide wall-to-wall coverages  IWS mode,  VVVH polarization  One pass  Following multiple requests, main trigger flood reference mapping

19 ESA Presentation | Johannes Roeder / Pierre Potin | ESRIN | 26/02/2014 | Slide 19 ESA UNCLASSIFIED – For Official Use Sentinel-2: Possible steps during ramp-up scenario (under consolidation) - Phase 1: ~3-4 months, Phase 2: ~4-5 months 1) 1) -2) transition 2a)2b)

20 ESA UNCLASSIFIED – For Official Use Sentinel Data Access Different infrastructures adapted to different user typologies ESA Collaborative Access Copernicus Services Access Copernicus Services Access Data Access Layer Scientific / Other Access Scientific / Other Access ESA funded R&D projects Scientific / Other users Copernicu s Services ESA MSs Collaborative Users International users The Sentinel Data Policy and the funded operational accesses offer a dedicated access per user type potentially complemented by additional data retrieval points Operated by ESA MSs National Mirrors (Inc local station) National Mirrors (Inc local station) National Mirrors (Inc local station) National Mirrors (Inc local station) National Mirrors Internation al Mirrors (Inc local station) International Mirrors (Inc local station) Operated by int. partners International Mirrors EU International Agreements Infrastructure


Download ppt "ESA UNCLASSIFIED – For Official Use SENTINEL-1 OVERVIEW AND RELATED ACQUISITION PLANS: FORESTS AND AGRICULTURE Johannes Roeder / Pierre Potin ESRIN 26/02/2014."

Similar presentations


Ads by Google