Presentation is loading. Please wait.

Presentation is loading. Please wait.

PROJECT AND OVERSIZED RESHIPING

Similar presentations


Presentation on theme: "PROJECT AND OVERSIZED RESHIPING"— Presentation transcript:

1 PROJECT AND OVERSIZED RESHIPING

2 PROJECT DEPARTMENT Project Department
ACEX manages global projects on delivery of oversized and heavy or non-standard cargoes to door, including performing all formalities related to crossing borders of the countries on the way to destination. Our specialists are entrusted to arrange project deliveries of high value equipment for or oil and gas industry/ aerospace engineering/ medical/ automotive industry sectors; ACEX’s broad experience allows arranging deliveries of oversized. Dangerous and other complicated goods. Specialists of ACEX provide to its clients the opportunity to monitor cargoes’ movement, as well as liability insurance and complete information about a cargo along the whole transportation route. Such complex projects as multimodal delivery of equipment for oil and gas industry, as well as for aerospace engineering, should be entrusted only to professionals and specialists who have solid background and reputation and experience in implementing complex projects. Project Department

3 Our possibilities Project Department
ACEX Group partners in project cargo distribution: Ro-Ro lines: partners worldwide. Terminals: PLP, Trans-Log, FCT (First Container Terminal), Excise Terminal, Marine Cargo terminal SPb. Delivery services through Ust-Luga Port ACEX Group renders delivery services through Ust-Luga port: -Ro-Ro units and track machines;  -vehicles;  -general cargo (equipment);  -containers (with oversized cargo);  -off-gauge load and heavy lifts (more than 25 tons);  -long loads;  -bulk cargo (carbon, carbamide, technical sulphur) etc. Project Department

4 New terminals for cargo handling
Our possibilities New terminals for cargo handling Vehicle railroad ferry complex:  The line Ust-Luga — Baltiysk — the ports of Germany ferry communication is the federal project and one of transport corridor "West-East" chains. Ust-Luga ferry complex is more than 8,8 km long and is equipped with railway park consisting of 16 platforms. Multi-purpose handling terminal Yug-2.  Multi-purpose handling complex (MPC) Yug-2 features Ro-Ro units including new imported cars, container and general cargo. Working at full capacity MPK "Yug-2" will provide cargo receipt, storage and reloading of 4,6 million tons of cargo per year. The estimated capacity of multi-purpose complex vehicle terminal is 450 thousand new foreign cars per year. The launch area of the vehicle terminal is planned for 100 thousand cars.  Warehouse logistics center is built on the territory bordering with MPC Yug-2, Ust-Luga container terminal and vehicle railroad ferry complex. Project Department

5 Project Phases Project Department 1. Preliminary Services
Transport recommendations Route study Freight ton estimate Consultation Point of origin pricing analysis Risk analysis 2. Preparation Services Recommendations for packing, containerization, marking and labeling Outlining loss & damage prevention procedures Identification of staging areas Warehouse sites and consolidation points Establishment of communication with clients, vendors & contractors 3. Pre-shipping Services Follow up Expediting and tracking Arrangement of inland transport to consolidation points Inspection of cargo Packing, containerization, crating, labeling & staging Review of documents and marine insurance requirements Project Department

6 Project Phases Project Department 4. Export Shipping Services
Freight negotiation Booking Prepayment of freight charges Loading Surveys Supervision of cargo loading Consolidation / containerization Port handling and arrangements Issuance and verification of documents Letter of credit Airfreight Chartering 5. Destination Services Port handling & preparation for arrival Application for road / rail permits Temporary import procedures Technical cargo survey Customs clearance Site delivery and unloading Arrival verification Import license procedures In-transit operations Claim handling and insurance adjustment 6. Additional Services EDI communication Expo tracking system Order Management Supply chain management Placement of personnel to jobsites Single Logistics Provider Project Department

7 RECENT PROJECTS Delivery of the mechanical equipment produced by Litz Hitech Corporation from Taiwan to Chelyabinsk via Finland in April-May 2011. Length: 552 cm Height: 335 cm Width: 351 cm Project Department

8 RECENT PROJECTS Project Department
Transportation of a batch of building rollers by sea from the United States to the port of Paldiski (Estonia), and after loading on a railway rolling stock delivery to Central Asia. In order to deliver 16 building rollers, 4 railway platforms were used. Project Department

9 RECENT PROJECTS Project Department
Delivery of 6000 tons of pipe products from TENARIS GLOBAL SERVICES, the largest supplier of equipment for oil and gas industry, to Russia from the plants located on different continents: 2100 tons – from Argentina, 900 tons – from Romania, 3,000 tons – from Italy. Multimodal delivery by different means of transport: sea, rail and automobile. Project Department

10 RECENT PROJECTS Project Department
Delivery of 36 containers for the Avantex company, leader of the Russian geotextile materials. First shipment included 9 containers of production equipment. Second shipment consisted of 27 containers containing semiautomatic line for geotextile materials production. The cargo was delivered by truck from to the sea port of Shanghai, then by sea to the port of Novorossiysk, then it was transshipped to 36 container trucks and deliver to the Vladimir region. Project Department

11 RECENT PROJECTS Project Department
Multimodal transportation of 36-ton hydraulic machine for "Pipeline Systems and Technologies" from the port of Shanghai to the port of St. Petersburg - Lobnya - Shchelkovo. The delivery can be considered as complicated due to the weight of the machine-tool exceeding 36 tons and the height amounting to 2.9 m. The dimensions and weight of the equipment did not allow moving this equipment in a standard freight container. Project Department

12 RECENT PROJECTS Project Department
Transportation of oversized machines for construction on a route Taiwan – port Vostochny(Vladivostok) – Chelyabinsk. The transportation was carried out in 40’ containers and open tops. Transit time: days. November - December 2012, January – February 2013. Project Department

13 ACEX GROUP Vitaly Apalikov +7 812 385 58 99 Project Department
Saint-Petersburg 5, Mezhevoi kanal, Saint-Petersburg, , Russia TEL: ACEX (Russia toll free) Head of Project and Heavylift Department Vitaly Apalikov Project Department


Download ppt "PROJECT AND OVERSIZED RESHIPING"

Similar presentations


Ads by Google