Turn-key project Key-Personnel Organisation chart
Director, Projects Danieli Engineering (DE) Project Manager Client Project Manager & Project Management Staff Sales Manager Export Finance & L/C Manager Project Planning & Control Contract Administr. Legal Dept. Manager Procurement Manager P.M. DE P.C. WTP process P.E. Civil & structural des. P.E. Interconnecting piping P.E. Instrumentation P.E. HVAC P.E. Firefighting system P.E. Compressed air system P.C. Workshop laboratory eq. P.C. Cranes P.M. DA Process Coordinator P.E. Substation, HV - LV power distrib. P.E. Interconnecting cabling P.C. Automation system level 1 P.C. Automation system level 2 P.M. DCM P.E. Meltshop process P.E. Mech. Equipment engin. P.E. Hydraulics lubrication P.E. Piping utilities P.E. Instrumentation Danieli Construction & Commissioning (UMAC) Client Site manager & Staff Quality Manager P.M. Construct Erection & Commiss. Safety Officier P.M. DMH P.E. Rolling process P.E. Mech. Equipment eng. P.E. Hydraulics Lubrication P.E. Piping Utilities P.E. Instrumentation P.M. DCC P.E. Combustion process P.E. L.V. Distribution P.E. Automation Site Manager Planning & quantity Survey Deputy Site Manager Material Man Quality Assurance Eng. Accounting & Cost control Site Technical Office Field Engineers Civil and infrastructure construction Supervisor Erection Supervisors Startup and commissioning Team Building erection Mechanical Mechanical equipment Electrical Reheating furnace Piping P.C. Procurement cc P.C. Manufacturing & expediting Piping and aux. Systems Aux. Systems Automation HV / LV power distribution & Automation system P.C. Packing & Shipping P.C. Spare parts P.C. Training P.C. Operation, maintenance & safety manuals P.C. Expediting / testing (E LE) P.C. Quality Control
2
General Management Flow Chart (part 1)
CONTRACT & FINANCING TOOLS REQUIREMENTS CONTRACT SCHEDULE TECHNICAL SPECIFICATION PAYMENT METHOD/FORMALITIES PICS (PROJECT INTEGRATED CONTROL SYSTEM) MASTER PLANT LIST WORK BREAKDOWN RESPONSIBILITY PRICE BREAKDOWN SCHEDULE (LEV. III) CASH FLOW JOB POSITION (TPC/JET) INSPECTION TEST SCHEDULE (ITS) (PART 2) (PART 3)
3
General management Flow Chart (part 2)
JOB POSITION (TPC / JET) from part 1 ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS) MATERIAL REQUIR. TECHN. DOCUMENTS PROCUREMENT PURCHASE & ORDERS MANUFACTURING OUTSIDE (E/LE) INSIDE (I) (PART 3)
4
General management Flow Chart (part 3)
MANUFACTURING (FROM PART 2) INSPECTION TEST SCHEDULE (ITS) (FROM PART 1) OUTSIDE (E) INSIDE (I/LE) INSPECTION & TESTING (NOI/IRE/LOC/QCTM) INSPECTION PLANNING NOTICE OF INSPECTION (NOI) CERTIFICATIONS (IRE) RELEASE CERTIFICATE (RC) PACKING CERTIFICATION (IRP) PACKING LIST INSPECTION PLANNING NOTICE OF SURVEILLANCE (NOS) JOB POSITION (TPC/JET) (FROM PART 1) PRICE BREAKDOWN (FROM PART 1) SHIPPING & INVOICING CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM) COMMISSIONING
5
Master Plant List (esempio)
6
Estratto Livello 3: Plant Unit 31 (Typical)
7
Programmazione di Livello 3 (Typical)
8
Programmazione di Livello 4 (Typical)
9
Cut-off date: Progress (Typical)
10
Valide per tutte le discipline e attività
Curve pianificate di avanzamento (typical) % 100 90 80 70 60 50 40 30 20 10 N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A 2001 2002 2003 2004 planned progress Valide per tutte le discipline e attività