Presentation is loading. Please wait.

Presentation is loading. Please wait.

ESMEC-ET Electric Portfolio Report April 4, 2014 (Revised April 7, 2014)

Similar presentations


Presentation on theme: "ESMEC-ET Electric Portfolio Report April 4, 2014 (Revised April 7, 2014)"— Presentation transcript:

1 ESMEC-ET Electric Portfolio Report April 4, 2014 (Revised April 7, 2014)

2 2 Contents I. Supply Portfolio ResultsPage # A. Key Performance Measures 4 B. Electric Supply Cost Chart – FY14 5 C. Electric Supply Cost Summary – FY14 6 II. Portfolio Hedge Strategy Review A. Hedge Position Chart 8 B. Block Purchase Plan 9 C. Proforma Hedge Position Chart 10 D. Forward Market Price Reports 11-12 E. Hourly Market Price Reports 13-15 III. Portfolio Billing Rates A. Portfolio Cost and Billing Rate History 17 B. Electric Supply Portfolio vs. DPL SOS Rate Summary 18 C. Working Capital – Billing Rate Comparison 19 D. Billing Rate Alternatives 20 E. FY14 Billing Rates by Rate Schedule 21 F. Proposed FY 15 Billing Rates by Rate Schedule 22 Appendix 24-31

3 3 I. Supply Portfolio Results

4 4

5 5

6 6

7 7 II. Portfolio Hedge Strategy Review

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16 III. Portfolio Billing Rates

17 17

18 18

19 19

20 20

21 21

22 22

23 23 Appendix

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31


Download ppt "ESMEC-ET Electric Portfolio Report April 4, 2014 (Revised April 7, 2014)"

Similar presentations


Ads by Google