November meeting agenda Hood River Water Planning Study Project ScheduleNiklas2:00 – 2:10 Water Use / Water Conservation ReportsNiklas2:10 – 2:15 IFIM.

Similar presentations


Presentation on theme: "November meeting agenda Hood River Water Planning Study Project ScheduleNiklas2:00 – 2:10 Water Use / Water Conservation ReportsNiklas2:10 – 2:15 IFIM."— Presentation transcript:

1 November meeting agenda Hood River Water Planning Study Project ScheduleNiklas2:00 – 2:10 Water Use / Water Conservation ReportsNiklas2:10 – 2:15 IFIM UpdateNiklas2:15 – 2:20 Water Resource AlternativesNiklas2:20 – 2:30 GroundwaterNiklas/Mattie2:30 – 2:35 Preliminary DHSVM resultsTaylor Dixon (Reclamation)2:35 – 3:05 Water Resource Modeling (MODSIM)Taylor Dixon (Reclamation)3:05 – 3:50

2 Schedule

3 Schedule (Reports from Reclamation) Groundwater Technical Report Draft in December, comments in January, final in February. Climate Change Technical Report Draft in December, comments in January, final in February. DHSVM and MODSIM Technical Reports Draft in February, comments in March, final in April. Main Report Draft in February, comments in March, final in May.

4 Schedule (Reports from Consultants) Water Use Assessment In review by Les. Available at: http://watershednet.com/projects/hood_river_basin_study/reports/ Water Conservation Assessment In review by Les. Available at: http://watershednet.com/projects/hood_river_basin_study/reports/ Water Resource Map In progress. Available at: http://bit.ly/1bHbGM1http://bit.ly/1bHbGM1 Instream Flow Study Waiting for water resource results from Reclamation. To be completed in February/March.

5 IFIM Concerns  From CTWS and ODFW.  Concerned ‘optimal’ Weighted Usable Area for East Fork Hood River lower than professional opinion.  Says finish IFIM study with two caveats: 1. Results should not be used to recommend streamflow that could be used for storage without additional studies. 2. WPG will update results when new data becomes available.

6 IFIM Concerns

7 Water Resource Alternatives A LT.D ESCRIPTION C LIMATE 1 W ATER D EMANDS 2 W ATER C ONSERVATION 3 W ATER S TORAGE 4 1 Historic climate, existing demands Historic (1980-2009) Existing 2 Future climate, existing demands Future (2030-2059) Existing 3 Future climate, future demands Future (2030-2059) Future (potable & irrig. increases) Existing 4 Future climate, future demands, water conservation. Future (2030-2059) Future (potable & irrig. increases) Future (irrig. water conservation) Existing 5 Future climate, future demands, water conservation, additional storage. Future (2030-2059) Future (potable & irrig. increases) Future (irrig. water conservation) Existing & New Storage (larger FID & MFID, new EFID)

8 Groundwater Reclamation - Groundwater Modeling meeting November 19 - Final Groundwater Results presented at WPG meeting on December 4 th - Draft report in December - Final report in February

9 Groundwater Monitoring Network Completed  Measurements taken in September from 36 wells.  Water Quality measurement taken from one well in October  Letters sent to well owners to request their participation  Continued work on report documenting progress in expanding the monitoring network Next Steps  Arrange meetings with well owners interested in participating  December well measurements  Finish draft of report between January and February

10 Upcoming meetings Normal Water Planning Group (at County building): - December 4, 2-4 pm - January 14, 2-4 pm Modeling sub-groups (at County building/webinar): - November 19, 1-3pm (Groundwater) - November 20, 1-2pm (DHSVM/Water Resources) - December 18, 1-2pm (DHSVM/Water Resources)

11 IFIM Concerns

12 Jan.Feb.MarchAprilMayJuneJulyAugSeptOct.Nov.Dec. HRC EF- upper 70* 120** 70*120*** HRC- EF- lower 100 175 100175 BIR Optima 150 255 150 255 BIR Minima 100 150 100 150 Natural 50% 325351340359392367272197169160201282 Natural 80% 207268286288308253206152146134163190 IFIM Concerns