Peter McBride, PMP – Cheetah Learning Canada McBride Consulting Group Inc.
2
Agile Consortium DSDM/Atern APMG PMI McBride Consulting Group Inc. August 2011
3
Pre-Project Feasibility Foundations Exploration Engineering Deployment Post-Project Pre-Project Feasibility Foundations Exploration Engineering Deployment Post-Project McBride Consulting Group Inc. August 2011
4
Business Sponsor McBride Consulting Group Inc. August 2011 Business Visionary Technical Coordinator Project Manager Team Leader Business Advisor(s) Business Ambassador Solutions Tester(s) Coach Business Analyst Solution Developer Workshop Facilitator Specialist Roles
5
Pre-planning - Terms of reference Feasibility Feasibility Assessment Outline Plan Foundations Business Foundations Requirements List Solution Foundations Business Area Definition System Architecture Definition Development Approach Definition Solution Prototype Management Foundations Delivery Plan Delivery Control Pack McBride Consulting Group Inc August 2011 Exploration and Engineering Evolving Solution Solution Assurance Pack Solution Review records Business Testing Pack Technical Testing Pack Deployment Plan Benefits Realisation Plan TimeBox Plan TimeBox Review Record Deployment Deployed Solution Project review report Increment Review Benefits Enablement Summary End of Project Assessment
6
Fixed Variable Features TimeCost Quality Feature s Time Cost Quality McBride Consulting Group Inc August 2011 Conventional PM Agile PM
7
Focus on the business need Deliver on time Collaborate NEVER compromise quality Build incrementally from firm foundations Develop iteratively Communicate continuously and clearly Demonstrate control McBride Consulting Group Inc. August 2011
8
Facilitated Workshops MoSCoW Modelling Timeboxing Planning Managing Risk Testing McBride Consulting Group Inc August 2011
9
Must Have – a “Minimum Usable SubseT” (MUST) of requirements should be defined. Should Have Could Have Won’t Have McBride Consulting Group Inc August 2011
10
Kickoff Investigation Refinement Consolidation Close Out The Timebox process
11
AMPG No previous experience required Certifies knowledge, not skills Gets you started PMI Requires experience and training to qualify Certifies experience, knowledge (and skills?) Shows you have arrived McBride Consulting Group Inc August 2011
12
Peter McBride, PMP Certified in EVMS from APMG MCGI is the Canadian Cheetah Learning Authorized Provider McBride Consulting Group Inc August 2011