COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Marcel Mampaey, C-DAX Project Coordinator November 8 th, 2012 Cyber-secure Data And Control Cloud.

Similar presentations


Presentation on theme: "COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Marcel Mampaey, C-DAX Project Coordinator November 8 th, 2012 Cyber-secure Data And Control Cloud."— Presentation transcript:

1 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Marcel Mampaey, C-DAX Project Coordinator November 8 th, 2012 Cyber-secure Data And Control Cloud for Power Grids EC FP7-ICT-2011-8 call project

2 2 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. A Cloud Overlay for Smart Energy Applications Retailers Storage systems Producers End-users Utility IP Network

3 3 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. The future grid requires a secure distributed control and data overlay network (on top of IP) Designed to support a whole spectrum of grid applications (unlike today’s silo’s): ­From off-line to time-critical data capturing with limited data exchange, using P2P communication, message broadcast/multicast/… ­Reaches into the core grid but can seamlessly be extended to include residential end-points ­Design takes into account the stringent cyber-security requirements that are expected from the grid as a critical infrastructure ­Design takes into account scalability, self-healing and autonomous operation ­Allows multiple administrative domains to gain access to the grid fully respecting the business roles in the market A Holistic Approach to Energy Grids

4 4 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. …in combination with a pervasive, distributed medium voltage synchrophasor sensing layer Allow ‘MV’ operator to capture the real-time state of its network This full medium voltage smart grid control enables: ­ Integration of high level renewables ­ Islanding, Microgrid ­ Advanced Fault Management C-DAX overlay + breakthrough PMU* technology provides the utility a complete view and control over its his network - anytime, anywhere * PMU = Phasor Measurement Unit

5 5 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Overall Architecture GenerationTransmissionDistribution DERCustomer Process Field Station Operation Enterprise Market 61850 CIM C-DAX Data models C-DAX: Secure Data Dissemination & Control Applications CIM = Common Information Model = IEC 61970-301 61850 = IEC 61850 (SCL – Substation Configuration Language)

6 6 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. TCP/UDP Secured Grid Overlay Network (unicast, multicast, broadcast) Streaming-based Data Dissemination Query-based Data Point-2-Point Publish / Subscribe based middleware LV S/S LV MV MV S/S PV G G IP TCP/UDP Applications End-users Other Stakeholders API C-DAX Design Concept PV = Photo-Voltaic S/S = Sub-Station LV = Low Voltage MV = Medium Voltage

7 7 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Capture Requirements for C-DAX derived from Smart Grid Application Use Cases ­Medium voltage (MV) distributed energy resources (DER) and Microgrids ­Market retail transactions ­Low Voltage pervasive DER Design (iteratively) and architect C-DAX based on requirements Implement a prototype (& functional testing) Validate prototype and assess performance (& simulations) Lab experiment (realtime emulation lab - integrates field equipment) Field trial in a life electricity network (Alliander MSLivelab) with selected applications C-DAX: an Implementation Project

8 8 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Dissemination ­Targeted conferences / events and publications (IEEE GreenCom, IEEE Communications Magazine, IEEE PES-ISGT, etc.) Standardization ­Influence relevant standards (IEC 61850, IEEE C37.118, M490, IEC TC57, ETSI M2M, Cigre, IETF) Collaboration with other projects Dissemination on public Web site ­cdax.eu / cdax-project.eu (will be available by end December 2012)cdax.eucdax-project.eu User Board ­Early dissemination of results to a select group of industry players ­Meetings organized at key project milestones C-DAX Communication

9 9 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. C-DAX Project Consortium Duration: 36 months Total budget: 4.315.303 Euro EU-funding: 2.931.000 Euro Started: October 1 st, 2012 Key data

10 10 COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Contact Marcel Mampaey Alcatel-Lucent Corporate Chief Technology Office +32 32 40 98 03 marcel.mampaey@alcatel-lucent.com Cyber-secure Data And Control Cloud for Power Grids EC FP7-ICT-2011-8 call project


Download ppt "COPYRIGHT © 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED. Marcel Mampaey, C-DAX Project Coordinator November 8 th, 2012 Cyber-secure Data And Control Cloud."