Download presentation
Presentation is loading. Please wait.
Published byElmer Shawn Kennedy Modified over 9 years ago
1
1 24 Apr 13 I&L Advocacy Way Ahead
2
2 Purpose of Advocacy V-8 Engine that Drives Progress in Our Logistics Community
3
3 Logistics and Logisticians Ready Marines Right Things Right Capabilities Man, Train, Equip, and Resource
4
4 Engage, Influence, and Advocate for Logistics, Installations, and Logisticians Logistics Enterprise & Environment S&T Joint Operating Forces Installations Training & Education Training & Education POM Manpower OccField Sponsorship OccField Sponsorship Advocacy
5
5 Influence & Support National /Joint / Multi Service Strategy & Concepts GEF/JSCP GDF/JPG UCP OSD & Joint Strategic Guidance Joint Concepts CCDR Demand Signals Informs / Informed By Directive and Aligned Capability Development Maritime Strategy Naval Operating Concept DOTMLPF Implications Marine Corps Operating Concept Advocates Plans & Programmatic Roadmaps Program & Budget Cycles Implementation Planning Guidance Marine Corps Service Campaign Plan 2012-2020
6
Installations & Logistics Board (ILB) MAGTF Logistics Board (MLB) Dir, LP CG, MCLC CG, 1 st MLG CG, 2d MLG CG, 3d MLG CG, 4 th MLG MAGTF Logistics Board (MLB) Dir, LP CG, MCLC CG, 1 st MLG CG, 2d MLG CG, 3d MLG CG, 4 th MLG Marine Installations Board (MIB) Commander, MCICOM CG, MCIEAST CG, MCIWEST CG, MCIPAC CO, MCB Quantico/ CO, MCNRC CG, TECOM Cdr, NIC & Cdr, NAVFAC Marine Installations Board (MIB) Commander, MCICOM CG, MCIEAST CG, MCIWEST CG, MCIPAC CO, MCB Quantico/ CO, MCNRC CG, TECOM Cdr, NIC & Cdr, NAVFAC Logistics Consolidated OAG (Log COAG) Installations Regional Board (IRB) Material Readiness OAG (LPC) Material Readiness OAG (LPC) Engineering & EOD OAG (LPE) Transportation & Distribution OAG (LPD) Transportation & Distribution OAG (LPD) Health Services OAG (LP/HS) Health Services OAG (LP/HS) GCSS-MC OAG (LPC) GCSS-MC OAG (LPC) C2 for Logistics OAG (LPV) Operational Contract Support OAG (LB) Logistics Training & Education OAG (LPC) Logistics Training & Education OAG (LPC) Energy Military Construction (MILCON) Board Installations Protection Installations Protection Safety Base & Station Logistics Services Base & Station Information Technology Food Service Facilities and Land Management Training and Operations I&L Advocacy Structure Civ Personnel BPO/CPI/COLS Family Readiness Contracting 6 Key: = coordination = control
7
7 Advocacy Concept DC I&L issues Top-Down guidance to shape OAG & IAG actions. OAGs & IAGs establish procedures to address “community interest & regional issues” and utilize higher level boards to obtain required leadership decisions. OAG & IAG Issues must be properly prepared with sufficient rigor in the problem analysis, courses of action development, and coordination with other pertinent entities. All decisions need not go before the I&L Board for resolution. Must provide the MAGTF Log Board & Marine Installations Board with actionable deliverables of sufficient depth and rigor to influence future Marine Corps logistics capabilities. Provide for: Persistent & Integrated Engagement…
8
8 Guide & Influence MAGTF Logistics Board Marine Installations Board MCFDS CPM MCEIP PEBs PWG POM I&L Influences: Programming, FY+2 Planning, FY+3 I&L Informs: Current FY Execution Budgeting, FY+1 Integrate & Evaluate Installations Regional Boards Define & Shape Log Consolidated OAG Define & Shape LF/ MCICOM Strategic Plan & Priorities Installations Advisory Groups Facilities/Land Management MILCON Board Safety / Energy Installations Protection Information Technology / Contracting Training and Operations / Food Service BPO and COLs / Civ Personnel Logistics Services / Family Readiness Inform Coordinate & Monitor ACE GCE CE MAGTFs MCLC Operational Advisory Groups Material Readiness (LPC) Transportation & Distribution (LPD) Engineering & EOD (LPE) Health Services (LP / HS) Operational Contract Support (LB) GCSS-MC (LPC / LPV) Command & Control for Logistics (LPV) Log Training & Education (LPC / TECOM) Installations and Logistics Advocacy Process
9
9 OAG/IAG Process OAG/IAG Leads establish required membership -- 8-12 Members (may vary by function) “An” example: Each MLG (4) Each MARFOR assigned Forces (3) LOGCOM (1) / MARSOC (1) as appropriate TECOM as appropriate OAG/IAG Leads establish temporary WGs for specific issues as needed Develop processes/procedures to address “community” specific issues and answer “assigned tasks” from DC, I&L Follow guidance in OAG/IAG charter Schedule and execute a consistent OAG/IAG process
10
10 8000s 8800s Role of OccField Sponsors Coordinate across the OAGs Manning MOS Manual TFSMS EPAD TOECR Train T&R Manual POI validation CCRB reviews OPFOR interviews Equip TE review TFSMS WIPT’s CD&I Inputs MCSC PdM discussions Operational Contract Support OAG
11
11 Way Ahead I&L provides initial guidance: signed MCILR DC, I&L Issue Charter to Dir LP & Dir LF/Commander, MCICOM Dir LP & Dir LF/Commander, MCICOM issue charters to establish OAGs & IAGs Dir LP & Dir LF/Commander, MCICOM Report status of OAG to DC, I&L: 1 Sep 2013
12
12 The Future is Now… 24 Apr 13
13
Jul Aug Sep Oct Nov* Dec Jan Feb Mar Apr May Jun* Jul* Aug* Sep Oct Nov Dec Jul Aug Sep Oct Nov* Dec Jan Feb Mar Apr May Jun* Jul* Aug* Sep Oct Nov Dec Enclosure (3) FY20XX Marine Corps Enterprise Integration Plan (MCEIP) PEBs PWGs POM Submissions Program Review (PR) Program Review (PR) Resource Management Decisions Resource Management Decisions Resource Mgmt Decisions Resource Mgmt Decisions POM P&R Process Capability Investment Plan (CIP) MCFDS I&L Advocacy Marine Corps Solution Planning Directive (MCSPD) Advocate Gap List (AGL) Operational Advisory Groups Installations Advisory Groups Program Review (PR) Program Review (PR) Advocate Capability List (ACL) Marine Corps Gap List (MCGL) Advocate Capability List (ACL) Marine Corps Capability List (MCCL) Capability Investment Plan (CIP) Marine Corps Solution Planning Directive (MCSPD) Log Consolidated OAG MAGTF Log Board MCFDS is intended to replace MCO 3900.15B (Expeditionary Force Development System, EFDS) Marine Corps Enterprise Integration Plan (MCEIP) FY20XX *High OPTEMPO Months (PCS, Retirements, USMC Birthday, Holidays) Plan for CBA Wargame Plan for CBA Wargame Process Timeline – Programming, MCFDS, Advocacy Installations Review Board Marine Installations Board Operational Advisory Groups Installations Advisory Groups MAGTF Log Board Marine Installations Board I&L Board Operational Advisory Groups Installations Advisory Groups MAGTF Log Board Marine Installations Board I&L Board
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.