Presentation is loading. Please wait.

Presentation is loading. Please wait.

EnableNSW PLS Update September 2012. PLS Funding Guidelines Current PLS funding guidelines have been posted on EnableNSW website Feedback was provided.

Similar presentations


Presentation on theme: "EnableNSW PLS Update September 2012. PLS Funding Guidelines Current PLS funding guidelines have been posted on EnableNSW website Feedback was provided."— Presentation transcript:

1 EnableNSW PLS Update September 2012

2 PLS Funding Guidelines Current PLS funding guidelines have been posted on EnableNSW website Feedback was provided in the following areas: –Interim contract funding – outside scope –Private inpatients – make available interim limb funding –Second prostheses – funds repairs to expired prostheses –Consumable supplies – remove limits, change to $ amount –Format of document – smaller, more manageable documents –Discretionary process – be removed Review guidelines pending new contract/procurement arrangements Long term plan to break down the guidelines into segments Produce annual report on PLS expenditure at a scheme level

3 PLS Tender Interim limb contract arrangements in place up to 30 November 2012 Notice to industry of intention to procure PLS services released for comment in May 2012 –Not a sole provider for NSW or Metro Sydney –Panel of providers for SCHN –Interim limbs for rural areas –Consumers have choice for non interim scripts Changes made after industry consultation –ABF funding model and weighted funding replaced with pricing for 45 limb types –Upper limb scripts able to be taken to provider of choice Tender released to industry on e-tender website in July 2012

4 PLS Tender cont. Specifications of tender (details on e-tender website): –Appoint a single PSP to provide interim limbs and prosthetic consultation services at accredited public clinics –Tenderer submits price for interim / non-interim / socket replacement –Consumers have choice of PSP for the provision of non-interim limbs and all upper limbs –KPIs have not been mandated for provision of services other than interim services being provided on site as an inpatient. PSP requested to advise on: Warranty period for adjustments and services offered Maximum time from referral to assessment (metro and rural) Maximum time from assessment casting to fitting for a patient not presenting with complications that directly impact on prosthetic use Consultation support services on offer including method and timeliness –Specific criteria applied to panel services for SCHN in relation to timeframes and service support

5

6 Future Directions Investigate a matrix model of funding to better understand the underlying issues that impact on cost structures e.g. pattern of demand and the ability to create a homogeneous classification of limb types. Develop a classification system for payment of PLS approved components. This has included some preliminary retrospective coding of scanned prescriptions for K-levels over the last 5 years. The classification considered the following possible attributes: amputation type, K-level, age and weight. Investigate an explicit ‘cost per type of amputee’ and forecasts of expected number of prostheses and repairs to respond to the risk that the number of amputees increases over time.

7 ‘R’ Variables for cost of components based on Limb Type, K Classification and Age

8 Future Directions cont. Seek support from the University of Wollongong to assist in presenting the statistical basis for moving to a model of activity based funding and for conducting data analysis. Test the initial component classification with the industry to determine whether the included factors are required and/or additional factors are needed. Establish a group of clinical experts to review literature and develop Prescription and Provision Guidelines (PPGs) for silicone suspension. Investigate a business model for the procurement and provision of silicone (TCI) in parallel.

9 Other Collection of co-payment now undertaken by Enable NSW Establishment of a terminal devices bank for SCHN Enable NSW initiates engagement at a national level to progress a more co-ordinated approach to artificial limb schemes


Download ppt "EnableNSW PLS Update September 2012. PLS Funding Guidelines Current PLS funding guidelines have been posted on EnableNSW website Feedback was provided."

Similar presentations


Ads by Google