Presentation is loading. Please wait.

Presentation is loading. Please wait.

Modeling Basic Operations & Inputs

Similar presentations


Presentation on theme: "Modeling Basic Operations & Inputs"— Presentation transcript:

1 Modeling Basic Operations & Inputs
Chapter 4 Modeling Basic Operations & Inputs

2 Outline detailed operations general usage of ARENA Model 04-01

3 A Sequence of Related Models
Model 4-1: a sealed electronic assembly and test system more features, Model 4-2: additional features in scheduling, failure, and states of resources Model 4-3: more advanced animation Model 4-4: advanced features in moving – stations, routes, and animation

4 An Electronic Assembly/Test System
Part A EXPO(5) Scrapped Process A Tria(1,4,8) Part A TRIA(1,3,4) Part B WEIB (2.5, 5.3) 20% Rework 9% 80% EXPO(45) Salvaged & Shipped Sealer 91% Shipped Part B Batches of 4 EXPO(30), de-batch on arrival Process B Tria(3,5,10)

5 An Electronic Assembly/Test System
create entities statistics Sealer Part A EXPO(5) Process A Tria(1,4,8) Process B Tria(3,5,10) Part A TRIA(1,3,4) Part B WEIB (2.5, 5.3) EXPO(45) Rework 9% 91% Shipped 20% Scrapped 80% Salvaged & Shipped Part B Batches of 4 EXPO(30), de-batch on arrival processes chance type-dependent service times unreliable system create batches of 4 entities & de-batch later to determine the number of racks

6 Model 04-01 ignore details the 2-minute traveling times
the working hours of stations schedule of the re-workers failure of the sealer the number of racks used

7 Remarks for Model 04-01 two types of entities entity-dependent service time: an attributes of an entity: a local variable of the entity time in system: marking the time entering the system chance: conditional routes type dependent statistics: record mechanism

8 Model 04.02

9 New Features of Model 04-02: Refinements of Model 04-01
run length 10 days, 16 hours per day two 8 hr shifts / day 1 re-worker in the first shift 2 re-workers in the second shift sealer may break down life time expo(120) repair time expo(4) statistics of the status of sealer: on and off statistics of the rework queue (distribution of # of racks) each rack possible to hold 10 items

10 Schedule of the Rework Station
run length: Setup menu variable resource define schedule of re-workers (Schedule module) modify the # of hours per day to suit the schedule associate the schedule with the (resource of the) re-work station option on resource when a service is interrupted: ignore, wait, preempt

11 Failure of Resource failure of the sealer
define a failure (Failure module in Advanced Processes) associate the failure with a resource the treatment of incomplete work at a failure same as schedule: ignore, wait, and preempt

12 Collect Statistics statistics time in system: customer average
sealer: state dependent, time average rack: number of rack needed, time average

13 Collect Statistics to get time-in-system statistics of a type of entities (customer-average statistics) use Record module record exit time - creation time compile statistics to get time-persistent statistics of a collection of values of variables or a collection of states of resources use Statistics module (in Advance Process Template) may need to self-define categories

14 Statistics for Racks and for Sealers
time-persistent statistics – Statistic module statistics on sealer status fraction of idle, failed, and busy time of sealer statistic type: frequency (not time-persistent) statistics on number of racks needed fractions of time for different number of racks used

15 Instantaneous Utilization and Scheduled Utilization
for a resource, let B(t) = # of units of the resource busy at t M(t) = # of units of the resource available at t instantaneous utilization scheduled utilization

16 Model 04.03

17 New Features of Model 04-03: Refinements of Model 04-02
animation of queues length and points of queues changing entity pictures creating new one: copy, edit, and assign entity picture adding resource pictures creating resource picture from animation tool bar adding variable plots

18 Model 04.04

19 New Features of Model 04-04: Refinements of Model 04-03
saving connection links by station and route modules stations: module for program and icon for animation route: module for program and link for animation possible to have multiple station icons in animation for one location two station icons between one route link in animation changing an entity picture: by an Assignment Module


Download ppt "Modeling Basic Operations & Inputs"

Similar presentations


Ads by Google