Presentation is loading. Please wait.

Presentation is loading. Please wait.

Global Air Transportation Execution System (GATES)

Similar presentations


Presentation on theme: "Global Air Transportation Execution System (GATES)"— Presentation transcript:

1 Global Air Transportation Execution System (GATES)
Program Manager: Maj Lori Winn Development Contractor: Mr. Craig Hughes

2 GATES Milestones V3.00 Implementation – Mar-Apr ‘07
Final phase of aerial port functionality on the Web V3.01 Implementation – Nov ’07 Turnover for Final System Test – Jun ‘07 First phase of water port functionality on the web CONUS and OCONUS Regional Databases replaced V4.00 Implementation – Sep-Oct ’08 Turnover for Final System Test – Feb ‘08 Second phase of water port functionality on the web Most terminals replaced Could include first EDI functionality V4.01 Implementation – Jan ’09 Turnover for Final System Test – Jul ‘08 Final phase of water port functionality on the web Unique terminals replaced

3 GATES Team PM: Maj Lori Winn, AMC/A6IM
Deputy PM: Ms. Sue Dolphy, AMC/A6IM Finances: Ms. Judy Sealock, AMC/A6IM Interfaces: Mr. Ray Seils& Ms. Lakita Humber, AMC/A6IM Technical Advisors: Mr. Martin McGibney & Ms. Deborah Davis, MITRE Test Lead: Mr. Ed Kebel, 805 CSPTS/SCV Development Team: Task Lead: Mr. Billy Woody, CSC Interfaces: Mr. Craig Hughes, CSC Functional Managers: AMC/A4TI, USTC/J3 DCD, SDDC G4 GATES PMO DSN /Cml

4 GATES Aerial Port Interfaces
Load Planning AALPS GATES Pallet Handling Data MMHS Unit Move Passenger DCAPES Cargo and Passenger Manifests TCAIMS II Unit Move Cargo LOGMOD ITV Data GTN Disk File Based Cargo ATCMD DS2T ASIFICS DEAMS Manifest/Movement Data Cargo ATCMD TC-ACCIS Reconciliations Cargo ATCMD Passenger List TCAIMS II GDSS GDSS II Air Mission Data Cargo ATCMD Load Data FACTS Movement Data CMOS Cargo and Passenger Manifests ITV Data – FEDEX, UPS, etc CMI INS Passenger Data Systems in Green could potentially become EDI interfaces using a version of the 858 transaction. Systems in Blue have unique data requirement and are not good candidates for EDI. AALPS: Automated Air Load Planning System ABDM: Automated Business Decision Model APIS: Advanced Passenger Information System ASIFICS: Airlift Services Industrial Fund Integrated Computer System CMI: Commercial Movement Interface CMOS: Cargo Movement Operations Systems DCAPES: Deliberate and Crisis Action Planning and Execution Segments DEAMS: Defense Enterprise Accounting and Management System DS2T: Deployment and Sustainment Support Tool DSS: Distribution Standard System EDQMS: Enterprise Data Quality Management System FACTS: Financial and Air Clearance Transportation System GDSS: Global Decision Support System GEX: Global Exchange (e-Business Server) GTN: Global Transportation Network ITRAM: International Traffic Management System LOGMOD: Logistics Module MMHS: Mechanized Materials Handling System Pipeline: RF-ITV Server: Radio-Frequency Intransit Visibility Server SMS: Single Mobility System TC-ACCIS: Transportation Coordinator’s Automated Command and Control Information System TCAIMS II: Transportation Coordination’s Automated Information Management System II TMDS: Table Management Distribution System Tracker: Cargo ATCMD APIS DSS Passenger Movement Data ITRAM Commodity Data GEX Reference Data TMDS PIPELINE Movement Data Data Queries SMS Cargo ATCMD TRACKER Data Queries EDQMS Movement Data Data Queries RFID Tag Data ABDM RF-ITV SERVER

5 Transaction Volume System In/Out Volume FACTS In
60,000-70,000 shipments per month Out 40,000-50,000 movements per month CMOS manifests per month 3,000-5,000 manifests per month DSS shipments per month Pipeline 200, ,000 movements per month Tracker 1,000-2,000 shipments per month TCAIMS II 5,000-10,000 manifests per month CMI ~100 shipments per month Did not include the Disk File Based interfaces. Use is intermittent and volume is not tracked.

6 GATES Aerial Port Interfaces
UDF AALPS GATES UDF MMHS UDF DCAPES DTR: TAA, TAT, T_A, T_E, T_F, T_G, T_H, T_I TCAIMS II UDF LOGMOD UDF GTN Disk File Based DTR: T_1, T_5, T_6, T_7, T_9 DS2T ASIFICS DEAMS UDF DTR: T_1, T_5, T_6, T_7, T_9 TC-ACCIS UDF DTR: T_1, T_5, T_6, T_7, T_9 TCAIMS II GDSS GDSS II USMTF DTR: T_1, T_5, T_6, T_7, T_8 T_9 USMTF FACTS DTR:TAA, T_A, T_D CMOS DTR: TAA, T_A, T_I, TK6 DTR: TAA, TAT, T_A, T_E, T_F, T_G, T_H, T_I CMI UNEDIFACT AALPS: Automated Air Load Planning System ABDM: Automated Business Decision Model APIS: Advanced Passenger Information System ASIFICS: Airlift Services Industrial Fund Integrated Computer System CMI: Commercial Movement Interface CMOS: Cargo Movement Operations Systems DCAPES: Deliberate and Crisis Action Planning and Execution Segments DEAMS: Defense Enterprise Accounting and Management System DS2T: Deployment and Sustainment Support Tool DSS: Distribution Standard System EDQMS: Enterprise Data Quality Management System FACTS: Financial and Air Clearance Transportation System GDSS: Global Decision Support System GEX: Global Exchange (e-Business Server) GTN: Global Transportation Network ITRAM: International Traffic Management System LOGMOD: Logistics Module MMHS: Mechanized Materials Handling System Pipeline: RF-ITV Server: Radio-Frequency Intransit Visibility Server SMS: Single Mobility System TC-ACCIS: Transportation Coordinator’s Automated Command and Control Information System TCAIMS II: Transportation Coordination’s Automated Information Management System II TMDS: Table Management Distribution System Tracker: DTR: T_1, T_5, T_6, T_7, T_8 T_9 APIS DSS UDF ITRAM Web Query/Result GEX UDF TMDS PIPELINE DTR: TAA, TAT, T_A, T_D, T_I, TK6 Direct Query/Result SMS DTR: T_1, T_5, T_6, T_7, T_8 T_9 TRACKER Direct Query/Result EDQMS DTR: TAA, TAT, T_A, T_D, T_I, TK6 Direct Query/Result UDF ABDM RF-ITV SERVER

7 GATES Water Port Interfaces (to be)
Movement Data Movement Data AWRDS MISIL GATES Cargo ATCMD Cargo Data MDSS II BPS Disk File Based Cargo ATCMD ITV Data TC-ACCIS IRRIS Cargo ATCMD ITV Data TCAIMS II / USMC GTN Web Query/Result TOPS DPS LINK Cargo ATCMD Movement/Billing Data CAB Movement Data FACTS Manifest Data BCS3 Cargo ATCMD CMOS Container Data GFM Cargo ATCMD DSS Query/Result PAT Commodity Data GEX Movement Data DORRA Systems in Green could potentially become EDI interfaces using a version of the 858 transaction. Systems in Blue have unique data requirement and are not good candidates for EDI. AAFES: Army Air Force Exchange Service AWRDS: Army War Reserve Deployment System BCS3: Battle Command Sustainment Support System BPS: Business Process System CAB: Cargo and Billing System CMOS: Cargo Movement Operations Systems DORRA: DLA Office of Operations Research and Resource Analysis (Rand Corp) DPS: Defense Personal Property System DS2T: Deployment and Sustainment Support Tool DSS: Distribution Standard System FACTS: Financial and Air Clearance Transportation System GEX: Global Exchange (e-Business Server) GFM: Global Freight Management GTN: Global Transportation Network IBS: Integrated Booking System; Unit; Sustainment; Commercial Shipping Solution; Requirements Forecasting – Rates Analysis Module ICODES: Integrated Computerized Deployment System IRRIS: Intelligent Road/Rail Information Server LINK: Logistics Information Network MDSS II: MAGTF Deployment Support System II MISIL: Management Information System for International Logistics MTMS: Munitions Transportation Management System NLAC: National Level Ammunition Capability PAT: Pipeline Asset Tool Pipeline: RF-ITV Server: Radio-Frequency Intransit Visibility Server SER: SDDC Enterprise Repository SMS: Single Mobility System TC-ACCIS: Transportation Coordinator’s Automated Command and Control Information System TCAIMS II: Transportation Coordination’s Automated Information Management System II TMDS: Table Management Distribution System TOPS: Transportation Operational Personal Property System TOS: Terminal Operating System Tracker: PIPELINE Movement Data Cargo Status Data TOS Movement Data TRACKER Reference Data TMDS RFID Tag Data RF-ITV SERVER Cargo ATCMD, Updated Shipping Inst. IBS Cargo Data Shipping Instructions, Movement Data ICODES Stow Plan ITV Data SMS Cargo ATCMD Rejects/Acks MTMS Query/Result SER Movement Data NLAC Container Data AAFES

8 GATES Water Port Interfaces (to be)
UDF DTR: TT_, TT6, TT7, TTV AWRDS MISIL GATES DTR: T_1, 2, 3, 4, 5, 6, 7, 9 Cargo Data MDSS II BPS Disk File Based DTR: T_1, 2, 3, 4, 5, 6, 7, 9 DTR: T_1, 2, 3, 4, 5, 6, 7, 8, 9; TY_, TAJ; T_K, L, M, N, O, P, Q, R TC-ACCIS IRRIS DTR: T_1, 2, 3, 4, 5, 6, 7, 9 TCAIMS II / USMC DTR: T_1, 2, 3, 4, 5, 6, 7, 8, 9; TY_, TAJ; T_K, L, M, N, O, P, Q, R GTN Query/Result TOPS DPS LINK DTR: T_1, T_8, T_9 Movement/Billing Data CAB DTR: TT_, TT6, TT7, TTV FACTS DTR: TAJ; T_K, L, M, N, O, P, Q, R BCS3 DTR: T_1, 2, 3, 4, 5, 6, 7, 9 CMOS UDF GFM DTR: T_1, 2, 3, 4, 5, 6, 7, 9 DSS Query/Result PAT Query/Result GEX UDF DORRA AAFES: Army Air Force Exchange Service AWRDS: Army War Reserve Deployment System BCS3: Battle Command Sustainment Support System BPS: Business Process System CAB: Cargo and Billing System CMOS: Cargo Movement Operations Systems DORRA: DLA Office of Operations Research and Resource Analysis (Rand Corp) DPS: Defense Personal Property System DS2T: Deployment and Sustainment Support Tool DSS: Distribution Standard System FACTS: Financial and Air Clearance Transportation System GEX: Global Exchange (e-Business Server) GFM: Global Freight Management GTN: Global Transportation Network IBS: Integrated Booking System; Unit; Sustainment; Commercial Shipping Solution; Requirements Forecasting – Rates Analysis Module ICODES: Integrated Computerized Deployment System IRRIS: Intelligent Road/Rail Information Server LINK: Logistics Information Network MDSS II: MAGTF Deployment Support System II MISIL: Management Information System for International Logistics MTMS: Munitions Transportation Management System NLAC: National Level Ammunition Capability PAT: Pipeline Asset Tool Pipeline: RF-ITV Server: Radio-Frequency Intransit Visibility Server SER: SDDC Enterprise Repository SMS: Single Mobility System TC-ACCIS: Transportation Coordinator’s Automated Command and Control Information System TCAIMS II: Transportation Coordination’s Automated Information Management System II TMDS: Table Management Distribution System TOPS: Transportation Operational Personal Property System TOS: Terminal Operating System Tracker: PIPELINE DTR: TT_, TT6, TT7, TTV, TAG, TAI, TTU UDF TOS DTR: TT_, TT6, TT7, TTV TRACKER UDF TMDS UDF DTR: T_1, 5, 6, 7, 9; UDF RF-ITV SERVER IBS UDF ICODES UDF SMS DTR: T_1, 2, 3, 4, 5, 6, 7, 8, 9; TY_, TAJ; T_K, L, M, N, O, P, Q, R Direct DB Connection MTMS Query/Result SER NLAC DTR: T_1, 2, 3, 4, 5, 6, 7, 9; T_J, K, L, M, N, O, P, Q, R TYC, TYS, TYT, TYU, TYW Report AAFES


Download ppt "Global Air Transportation Execution System (GATES)"

Similar presentations


Ads by Google