Presentation is loading. Please wait.

Presentation is loading. Please wait.

MICE Control Issues Paul Drumm ~ Monday August 1 st 2004.

Similar presentations


Presentation on theme: "MICE Control Issues Paul Drumm ~ Monday August 1 st 2004."— Presentation transcript:

1 MICE Control Issues Paul Drumm ~ Monday August 1 st 2004

2 Please Note that… I am not a controls expert nor am I volunteering for the job… but... –I want to highlight a need –And get agreement –On a scheme and a way forward…

3 Local Control System ISIS machine Controls group - Vsystems ISIS experimental computing group –“Ray of light” Diamond –EPICS/VME DL –EPICS

4 Local Control System ISIS machine Controls group –6 people; hardware & software –Responsible for ISIS running (machine physics, upgrades) & 2 nd target station control system –System based on ethernet ISIS experimental computing group

5 ISIS Machine Cycle Magnet current 20mS 0 Δp 1000 Δp 2000 Δp 3000 Δp 3999 Δp MSMS Accelerate Inject Extract Permanent timing pulses MS: Machine Start. 2.5μS pulse every 20mS at 0Δp Δp:Delta-p train. Square wave - 5μS period These primary signals are phase locked to the magnet current/field waveform.

6 Control Issues MICE can benefit from –Commonality! (unspecified) Compatibility issues Support Maintenance Overheads –Commercial software/in-house? –Coordination

7

8 Who is doing what? AFC RF Power RF Cavity Data Acquisition Beam Line Magnets & Power supplies Parameter list, MAC: CERN collaboration meeting

9 What is Missing? Organisation & Coordination!


Download ppt "MICE Control Issues Paul Drumm ~ Monday August 1 st 2004."

Similar presentations


Ads by Google