COMPANY INTRODUCTION AND OPERATION Prepared by: Eng. Abdul Rasool H. Nouri General Manager Plant on Jebal Ali Free Zone South on Plot # 20909 Tel : 00971.

Similar presentations


Presentation on theme: "COMPANY INTRODUCTION AND OPERATION Prepared by: Eng. Abdul Rasool H. Nouri General Manager Plant on Jebal Ali Free Zone South on Plot # 20909 Tel : 00971."— Presentation transcript:

1 COMPANY INTRODUCTION AND OPERATION Prepared by: Eng. Abdul Rasool H. Nouri General Manager Plant on Jebal Ali Free Zone South on Plot # 20909 Tel : 00971 4 8865551 Dir : 00971 4 8865553 Fax: 00971 4 8865552 E-mail: nouri65@gulfpetrogas.ae

2 Introduction to Gulf Petro Gas Entry/ Exit Procedures at GPG Plant Communicate your arrival time to concerned GPG staff prior arrival. Ring bell & identify yourself upon request. Automatic door lock shall be opened from switch at office. Register details in Visitor log Book at reception upon entry/exit. Site Induction Training shall be given recorded & registered.

3 Operation GPG plant – Organization Chart GM Eng. Abdul Rasool Nouri Plant Ops Manager Ahmed Abood Plant administrator Jackuilin Plant Supervisor NoorNabi Operator Harun Operator Mohd Operator Fabi Operator Kumar Operator Sasi Operator Saleem QC/lab in charge Jenivas Accountant Faris Coordinator Emran

4 GPG Plant - Facility Details & Volumes Cap. *Area 8200 sq. mtrs 8200 sq. mtrs*Facilities Bitumen Storage – 3.5 KT Bitumen Storage – 3.5 KT Truck Loading Gantry – 3 Nos Truck Loading Gantry – 3 Nos Output points- 5 Nos Output points- 5 Nos Laboratory Laboratory Maintenance Block Maintenance Block Road Bitumen Tanker -25Nos Road Bitumen Tanker -25Nos Weighbridge – 100 Tones Weighbridge – 100 Tones Heating system Heating system *Volumes Planned for YR.2009 Bitumen 60 Kt Bitumen 60 Kt MAINT. BLOCK ROAD TANKERS HEATING SYSTEM Truck Loading Gantry Weighbridge

5 General Overview – Plant Facilities Office Block: toilet emergency exits Canteen Block Guardhouse: security checks entry passes Loading Gantry: Bitumen Tank Farms: Bitumen Office BlockTank Farms Bitumen Road Tankers Laboratory and canteen

6 Bitumen Cargo ( by vessel ) having quality certificate from origin Drown random samples for quality reconfirmation by third party Meets spec Yes Vessel Discharge Via Loading gantry Into road tankers No Rejected GM (recovery Plan) Trucks receipt at GPG plant Bitumen trucks discharged into GPG’s storages GPG’s quality reconfirmation Sales throughputs measured by GPG’s weighbridge GPG’s Operation Diagram GPG’s Operation Diagram

7 General Overview – Plant Facilities Laboratory and canteen Gpg Office block Heating sys. And pump station 45 T road tankers