Presentation is loading. Please wait.

Presentation is loading. Please wait.

深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production line MadeVarifyApprove Haihui ou Jun yang 13 / 5 //

Similar presentations


Presentation on theme: "深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production line MadeVarifyApprove Haihui ou Jun yang 13 / 5 //"— Presentation transcript:

1 深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production line MadeVarifyApprove Haihui ou Jun yang 13 / 5 //

2 1 、 Plant View 2 、 Meeting room 3 、 Development department 4 、 Development laboratory 5 、 Laboratory for approving new product 6 、 Goods receiving and inspection area 7 、 Incoming control 8 、 Controlling for warehouse of raw incoming 9 、 Production control 10 、 Inspection of finished product 11 、 Warehouse control of finished product Catalogue

3 1 、 Plant View(1)

4 1 、 Plant View(2)

5 Meeting room 2 、 Meeting room

6 Development department 3 、 Development department

7 4 、 Development laboratory ( 1 )

8 MonitorTest power supply, oscilloscope 4 、 Development laboratory(2)

9 Reliability laboratory 5 、 Laboratory for approving new product(1)

10 Reliability laboratory 5 、 Laboratory for approving new product(2)

11 Constant temperature and humidity testing machine 5 、 Laboratory for approving new product(3)

12 Drop test machine 5 、 Laboratory for approving new product(4)

13 Rain tester 5 、 Laboratory for approving new product(5)

14 Salt spraying tester 5 、 Laboratory for approving new product(6)

15 Lens testing area 5 、 Laboratory for approving new product(7)

16 Incoming inspection area 6 、 Goods receiving and inspection area

17 IQC incoming inspection area 7 、 Incoming control(1)-Incoming inspection room

18 Unqualified area Inspection waiting areaQualified area 7 、 Incoming control(2)- Division of incoming inspection area

19 IQC incoming inspection platform 7 、 Incoming control(3)-Incoming inspection platform

20 Place for sample of IQC incoming inspection, drawing and acknowledgment 7 、 Incoming control(4)- Sample, drawing and acknowledgment

21 Place for tooling equipment of IQC incoming inspection 7 、 Incoming control(5)- inspection tooling area

22 Caliper thread gauge block gauge plug gage 7 、 Incoming control(6)-Incoming inspection tool

23 digital electric bridge frequency recorder test patterns Multimeter 7 、 Incoming control(7)-Incoming inspection equipment

24 IQC Incoming inspection program 7 、 Incoming control(8)-Incoming inspection program

25 7 、 Incoming control(9)- sampling standard IQC incoming sample standard method

26 IQC inspection sheet 7 、 Incoming control(10)- inspection sheet

27 Electronic raw material warehouse 8 、 Controlling for warehouse of raw incoming(1)-Electronic warehouse

28 Temperature and humidity Control sheet for electronic warehouse 8 、 Controlling for warehouse of raw incoming (2) -Temperature and humidity control of electronic warehouse

29 Cabinet with Temperature and humidity Control of electronic warehouse 8 、 Controlling for warehouse of raw incoming (3)- Temperature and humidity Control for critical element

30 dehumidifier 8 、 Controlling for warehouse of raw incoming (4)- Damp proof control of electronic warehouse dehumidifier

31 vacuum package equipment 8 、 Controlling for warehouse of raw incoming (5)- antiseptic and damp proof control of electronic warehouse vacuum package equipment

32 hardware and packing raw material warehouse 8 、 Controlling for warehouse of raw incoming (6)- hardware and packing material warehouse

33 FIFO control label 8 、 Controlling for warehouse of raw incoming (7)- FIFO control

34 FIFO control document 8 、 Controlling for warehouse of raw incoming ( (8)- FIFO control

35 USB assemble line Material receiving area DVR assemble line Place for clearing sensor and sticking filter 9 、 Production control(1)-production line

36 Finished product and semi-finished product aging shelf Camera assemble line Product adjusting line USB aging shelf 9 、 Production control(2)-production line

37 Pre-Inspection Area Final inspection position Qualified finished product area packing line 9 、 Production control(3)-production line

38 Place for instrument and equipment Place for temporary storage of finished product place for tool&equipment 9 、 Production control ( 4 ) - tool&equipment

39 九、 Production control ( 5 ) —— electric screwdriver and ferrochrome control Spot check record of electric screwdriverSpot check record of ferrochrome

40 9 、 Production control ( 6 ) - Spot check record of electric screwdriver state of spot check for electric screwdriver

41 9 、 Production control ( 7 ) - control of dust-free for important position in production line Dust-free room for sticking filter

42 9 、 Production control ( 8 ) - control of dust-free for important position in production line Dust-free room for sticking filter

43 9 、 Production control ( 9 ) — equip with dust-free control for important position in production line Clear the dust-free position before installing housing

44 Aging test room 9 、 Production control ( 10 ) —aging test control Aging test room

45 9 、 Production control ( 11 ) —aging test control Checklists for temperature and humidity in aging test room

46 9 、 Production control ( 12 ) —— aging test control Process of product aging test

47 9 、 Production control ( 13 ) —— aging test control Record list of product aging test

48 QA inspection area of finished product 10 、 Inspection of finished product(1)- QA sampling area

49 Test patterns Illumination testing box color card equipment for testing 10 、 Inspection of finished product ( 2 ) —— QA sampling area

50 QA inspection process 10 、 Inspection of finished product ( 3 ) -inspection process

51 QA sampling method of finished product 10 、 Inspection of finished product ( 4 ) -sampling method

52 Place for QA files QA inspection files for finished product 10 、 Inspection of finished product ( 5 ) - inspection file and report

53 Place for finished product 11 、 Warehouse control of finished product(1)- finished product warehouse

54 Place for storing goods will be shipping 11 、 Warehouse control of finished product(2)- finished product warehouse

55 11 、 Warehouse control of finished product(3)-temperature and humidity control Control chart of temperature and humidity for warehouse

56 dehumidifier 11 、 Warehouse control of finished product(4)-damp proof control for warehouse dehumidifier

57 Thank you !


Download ppt "深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production line MadeVarifyApprove Haihui ou Jun yang 13 / 5 //"

Similar presentations


Ads by Google