Presentation is loading. Please wait.

Presentation is loading. Please wait.

11-Month Update Hydrogen from Small Wind Turbines.

Similar presentations


Presentation on theme: "11-Month Update Hydrogen from Small Wind Turbines."— Presentation transcript:

1 11-Month Update Hydrogen from Small Wind Turbines

2 System Design Nebraska Electrical Source Water Electrolyzer Load Application H 2 Storage ◊Wind ◊Underground ◊Rivers & Streams ◊Stored Rainfall ◊Condensers ◊Ice ◊Compressed ◊Liquefied ◊Metal Hydrides? H2H2

3 Turbine nacelle used for new high- efficiency converter for directly powering electrolyzer. One of the curved turbine blades standing next to the nacelle (generator and converter) –The blade curvature is to limit noise as the blade sweeps past the tower.

4 Close-up view of nacelle with generator exposed (spoked wheel) and soon-to-be removed existing power converter (behind dangling blue wires)

5 Aerial view of turbine installation site at Roger’s Memorial Farm.

6 45’ Monopole delivered to farm site. –Awaiting foundation pouring and utility hook-up

7 The Skystream turbine installed (this turbine at the National Wind Technology Center, NWTC) The UNL installed turbine will look exactly as this.


Download ppt "11-Month Update Hydrogen from Small Wind Turbines."

Similar presentations


Ads by Google